Us Construction California, Inc
- Based in
- Greenbrae
- On San Francisco permits
- Nov 2016 to Apr 2021
- Last 24 months
- 0 permits filed
75 permits since 2000: 51 completed, 21 never finaled, 3 expired or cancelled.
Of the 21 never-finaled permits, 21 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 13, 2021 | Completed final sign-off Oct 2021 | 218 Haight St | revision to pa# 201709148240. keep work out of existing unit at front of ground floor.Details
revision to pa# 201709148240. keep work out of existing unit at front of ground floor. | $5,000 |
| Dec 2, 2020 | Never finaled issued Feb 2021, no final | 555 Buena Vista West Av | revision to pa# 202002114120. change to unit #205 only-move walls. bathroom and kitchen locations swap.Details
revision to pa# 202002114120. change to unit #205 only-move walls. bathroom and kitchen locations swap. | $130,000 |
| Nov 18, 2020 | Completed final sign-off May 2021 | 3201 Octavia St | unit 301: renovation. new bedroom & bathroom. new kitchen cabinets & plumbing fixtures. new washer/dryer & dishwasher. new lighting at (e) j-boxes. no change to mechanical, exterior, fire alarm or sprinkler.Details
unit 301: renovation. new bedroom & bathroom. new kitchen cabinets & plumbing fixtures. new washer/dryer & dishwasher. new lighting at (e) j-boxes. no change to mechanical, exterior, fire alarm or sprinkler. | $65,000 |
| Sep 28, 2020 | Completed final sign-off May 2021 | 555 Buena Vista West Av | bpa#202002114120 change address to 555 buena vista avenue westDetails
bpa#202002114120 change address to 555 buena vista avenue west | |
| Aug 13, 2020 | Expired or cancelled cancelled Jan 2026 | 1637 Sacramento St | unit #7: renovate with new kitchen cabinets, new plumbing fixtrues, new lighting existing j-box location. no change to mech, no exterior work, no fire alarm or sprinkler work. kitchen remodel in kind. to comply with cec 150.0(k)3Details
unit #7: renovate with new kitchen cabinets, new plumbing fixtrues, new lighting existing j-box location. no change to mech, no exterior work, no fire alarm or sprinkler work. kitchen remodel in kind. to comply with cec 150.0(k)3 | $60,000 |
| Feb 11, 2020 | Completed final sign-off May 2021 | 555 Buena Vista Tr | renovation of 2 apts - units 106 on 1st fl & unit 205 on 2nd fl. new bedrooms & bath, new kitchen, cabinets & plumbing fixtures, new washer/dryers & dishwashers, new lighting at (e) j-boxes. no change to mech, no exterior work, fire alarm or sprinkler. no structural.Details
renovation of 2 apts - units 106 on 1st fl & unit 205 on 2nd fl. new bedrooms & bath, new kitchen, cabinets & plumbing fixtures, new washer/dryers & dishwashers, new lighting at (e) j-boxes. no change to mech, no exterior work, fire alarm or sprinkler. no structural. | $135,000 |
| Feb 6, 2020 | Never finaled issued Feb 2020, no final | 1637 Sacramento St | unit 3: renovation of (1) apartment unit 3, new kitchen cabinets, new plumbing fixtures, new lighting existing j box location. no change to mech, no exterior work, no fire alarm or sprinkler work. kitchen remodel in kind, to comply with cec 150.0(k)3Details
unit 3: renovation of (1) apartment unit 3, new kitchen cabinets, new plumbing fixtures, new lighting existing j box location. no change to mech, no exterior work, no fire alarm or sprinkler work. kitchen remodel in kind, to comply with cec 150.0(k)3 | $45,000 |
| Feb 4, 2020 | Completed final sign-off May 2021 | 3201 Octavia St | unit# 103: remodel kitchen and bathroom at units 103 on 2nd floor. new counter, cabinets and plumbing fixgtures in kind. new tiles, vanity and fixutres in kind. no change to mechanical no exterior work. no fire alarm, sprinkler. no structural work under this permit.Details
unit# 103: remodel kitchen and bathroom at units 103 on 2nd floor. new counter, cabinets and plumbing fixgtures in kind. new tiles, vanity and fixutres in kind. no change to mechanical no exterior work. no fire alarm, sprinkler. no structural work under this permit. | $11,000 |
| Jan 22, 2020 | Completed final sign-off Aug 2021 | 1485 Valencia St | mechanical hvac: install new ductwork & central ac/heating. ref app# 20191007 3773Details
mechanical hvac: install new ductwork & central ac/heating. ref app# 20191007 3773 | $5,500 |
| Jan 9, 2020 | Completed final sign-off May 2021 | 3201 Octavia St | unit 303, 4th fl - new bedrooms and bathrooms. new kitchen cabinets & plumbing fixtures. new washer/dryer & dishwasher. new lighting at (e) j-box locations. no change to mechanical. no exterior work. no fire alarm or sprinklerDetails
unit 303, 4th fl - new bedrooms and bathrooms. new kitchen cabinets & plumbing fixtures. new washer/dryer & dishwasher. new lighting at (e) j-box locations. no change to mechanical. no exterior work. no fire alarm or sprinkler | $65,000 |
| Dec 11, 2019 | Completed final sign-off Nov 2022 | 3201 Octavia St | administrative permit to add description in approved soft story pa# 2019-0701-4827: soft story compliance per sfebc chapter 4d- engineering criteria 2016 cebc/asce 07 lateral seismic standards. full seismic compliance approved under permit application 201907014827 to comply with nov# 201989261.Details
administrative permit to add description in approved soft story pa# 2019-0701-4827: soft story compliance per sfebc chapter 4d- engineering criteria 2016 cebc/asce 07 lateral seismic standards. full seismic compliance approved under permit application 201907014827 to comply with nov# 201989261. | |
| Oct 7, 2019 | Completed final sign-off Aug 2021 | 1485 Valencia St | to comply with nov 201204181. top floor. all remodel work in kind, electrical, plumbing, restroom, remodel, drywall, insulation, flooring, kitchen cabinets. removal construction on ground floor. no alterations.Details
to comply with nov 201204181. top floor. all remodel work in kind, electrical, plumbing, restroom, remodel, drywall, insulation, flooring, kitchen cabinets. removal construction on ground floor. no alterations. | $60,000 |
| Oct 3, 2019 | Completed final sign-off Mar 2020 | 254 Ivy St | to obtain final inspection for work approved under pa 201704063382. all work is completeDetails
to obtain final inspection for work approved under pa 201704063382. all work is complete | |
| Sep 26, 2019 | Completed final sign-off Sep 2020 | 3099 Washington St | unit 16 - new bedroom, relocate/ new kitchen cabinets and plumbing fixtures, new washer/dryer & dishwasher. new lightin at (e) j-box locations. no change to mechanical. no exterior work. sprinkler or structural work f/a under sep permitDetails
unit 16 - new bedroom, relocate/ new kitchen cabinets and plumbing fixtures, new washer/dryer & dishwasher. new lightin at (e) j-box locations. no change to mechanical. no exterior work. sprinkler or structural work f/a under sep permit | $65,000 |
| Sep 26, 2019 | Completed final sign-off Sep 2020 | 3099 Washington St | unit 2, 3 and 10 - remodel of kitchen & bathrooms replace counters, cabinets, fixtures & appliances in-kind. replace (e) dishwashers & washer/dryers w/(n) models in (e) locations. all bathrooms 35 sf each. all kitchen = 70 sf eachDetails
unit 2, 3 and 10 - remodel of kitchen & bathrooms replace counters, cabinets, fixtures & appliances in-kind. replace (e) dishwashers & washer/dryers w/(n) models in (e) locations. all bathrooms 35 sf each. all kitchen = 70 sf each | $65,000 |
| Sep 26, 2019 | Completed final sign-off Sep 2020 | 3099 Washington St | unit 20 - new bedroom, new kitchen cabinets and plumbing fixtures, new washer/dryer & dishwasher. new lighting at (e) j-box locations. no change to mechanical. no exterior work. no fire alarm, sprinkler or structural workDetails
unit 20 - new bedroom, new kitchen cabinets and plumbing fixtures, new washer/dryer & dishwasher. new lighting at (e) j-box locations. no change to mechanical. no exterior work. no fire alarm, sprinkler or structural work | $45,000 |
| Sep 12, 2019 | Never finaled issued Nov 2019, no final | 1637 Sacramento St | apt 7 - new kitchen, bathroom & bedroom, cabinets and plm fixtures, w/d, d/w, lighting at (e) jbox locations. no change to mech/ext/fa/sprinkler.Details
apt 7 - new kitchen, bathroom & bedroom, cabinets and plm fixtures, w/d, d/w, lighting at (e) jbox locations. no change to mech/ext/fa/sprinkler. | $65,000 |
| Sep 12, 2019 | Completed final sign-off Nov 2020 | 930 Post St | reno of 1 apt unit 6 on 2nd flr - new kitchen, bathroom, cabinets and plm fixtures, w/d, d/w, lighting at (e) jbox locations. no change to mech/ext/fa/sprinkler/structralDetails
reno of 1 apt unit 6 on 2nd flr - new kitchen, bathroom, cabinets and plm fixtures, w/d, d/w, lighting at (e) jbox locations. no change to mech/ext/fa/sprinkler/structral | $65,000 |
| Sep 10, 2019 | Never finaled issued Sep 2019, no final | 1555 Chestnut St | unit #2: reno of 1 apt unit 2 on 2nd level. new den; new kitchen cabinetrs & plumb fixtures, w/d & d/w, lighting at (e) jboxes. no change to mech/struct/fire systems. new denDetails
unit #2: reno of 1 apt unit 2 on 2nd level. new den; new kitchen cabinetrs & plumb fixtures, w/d & d/w, lighting at (e) jboxes. no change to mech/struct/fire systems. new den | $65,000 |
| Sep 10, 2019 | Completed final sign-off Feb 2020 | 2425 Buchanan St | remodel kitchen 4x8 and bath 5x6,new washer dryer,ventless under cabinet, kitch cabinets, new bath fixt, new tub, sink sink vanilty, new elec subpanel, vinyl planking over e floor, no structural, no outside workDetails
remodel kitchen 4x8 and bath 5x6,new washer dryer,ventless under cabinet, kitch cabinets, new bath fixt, new tub, sink sink vanilty, new elec subpanel, vinyl planking over e floor, no structural, no outside work | $34,000 |
| Aug 21, 2019 | Completed final sign-off Oct 2019 | 530 Stockton St | unit 207 & 304: kitchen & bath remodel. new kitchen cabinets, bath fixtuers, flooring. bath sq ft approx 30. kitchen sq ft approx 48. nol alteratiion of walls.Details
unit 207 & 304: kitchen & bath remodel. new kitchen cabinets, bath fixtuers, flooring. bath sq ft approx 30. kitchen sq ft approx 48. nol alteratiion of walls. | $37,000 |
| Aug 15, 2019 | Completed final sign-off Feb 2020 | 2425 Buchanan St | unit 203, 3rd fl - new kitchen cabinets and plubming fixtures, new bathroom. new washer/dryer & dishwasher. new lighting at (e) j-boxes. no change to mechanical. no exterior work, fire alarm, sprinkler or structural workDetails
unit 203, 3rd fl - new kitchen cabinets and plubming fixtures, new bathroom. new washer/dryer & dishwasher. new lighting at (e) j-boxes. no change to mechanical. no exterior work, fire alarm, sprinkler or structural work | $65,000 |
| Aug 15, 2019 | Completed final sign-off Feb 2020 | 1985 Fulton St | reno of 1 apt unit 203 on 2nd flr - new kitchen, bedrooms, bathroom, d/w, w/d, plm fixtures. no chage to mech. no ext work. no fa or sprinkler work no structural. new lighting at (e) j-box locationsDetails
reno of 1 apt unit 203 on 2nd flr - new kitchen, bedrooms, bathroom, d/w, w/d, plm fixtures. no chage to mech. no ext work. no fa or sprinkler work no structural. new lighting at (e) j-box locations | $65,000 |
| Aug 6, 2019 | Completed final sign-off Nov 2020 | 930 Post St | renovation of 5 apartments: 02//05/08/20/21. unit 2 on 1st fl, 5 and 8 on 2nd floor, 20 and 21 on 3rd fl. new bedrooms and baths. new kitchen cabinets, plumbing fixtures. new washer/dryers. new lighting at e j boxes. no change to mech. no exterior fire alarm, sprinkler or structural work.Details
renovation of 5 apartments: 02//05/08/20/21. unit 2 on 1st fl, 5 and 8 on 2nd floor, 20 and 21 on 3rd fl. new bedrooms and baths. new kitchen cabinets, plumbing fixtures. new washer/dryers. new lighting at e j boxes. no change to mech. no exterior fire alarm, sprinkler or structural work. | $300,000 |
| Jul 1, 2019 | Completed final sign-off Nov 2021 | 3201 Octavia St | reno. of 9 units: 101,102,103 on 2nd floor; 201,202,203,204 on 3rd fl. units 302 & 304 on 4th fl. nw bedrooms, bathrooms, kitchen cabnets. nw plmg fixtures, nw lighting at extg j-box locations. nw dishwashers, washers/dryers. no change to mech, exterior work, fire alarm or sprinkler work. n/a maherDetails
reno. of 9 units: 101,102,103 on 2nd floor; 201,202,203,204 on 3rd fl. units 302 & 304 on 4th fl. nw bedrooms, bathrooms, kitchen cabnets. nw plmg fixtures, nw lighting at extg j-box locations. nw dishwashers, washers/dryers. no change to mech, exterior work, fire alarm or sprinkler work. n/a maher | $540,000 |
| Apr 26, 2019 | Completed final sign-off Oct 2019 | 530 Stockton St | unit 308 & 505: remodel kitchens & baths, kitchen approx 4'x8', bath approx 5'x6'Details
unit 308 & 505: remodel kitchens & baths, kitchen approx 4'x8', bath approx 5'x6' | $37,000 |
| Apr 26, 2019 | Completed final sign-off Sep 2019 | 1555 Chestnut St | unit 1: remodel kitchen & bath, refresh floor, paint/patch drywall, subpanel no exterior work, kitchen approx 10'x10', bath approx 5'x8'Details
unit 1: remodel kitchen & bath, refresh floor, paint/patch drywall, subpanel no exterior work, kitchen approx 10'x10', bath approx 5'x8' | $30,000 |
| Apr 11, 2019 | Completed final sign-off Dec 2019 | 203 Divisadero St | unit 203, 3rd flr: renovation of 1 apt. add 1 bedroom, (n) kitchen cabs, plumbing, fixtures, dishwashers, w/d's, lighting at (e) j boxes. change to mech, exterior, fire alarm or sprinklers. no structural work.Details
unit 203, 3rd flr: renovation of 1 apt. add 1 bedroom, (n) kitchen cabs, plumbing, fixtures, dishwashers, w/d's, lighting at (e) j boxes. change to mech, exterior, fire alarm or sprinklers. no structural work. | $45,000 |
| Apr 5, 2019 | Never finaled issued May 2019, no final | 810 Eddy St | conversions for studios to 1 bedrm for 201,303,405,406,507,604. new bathroom in 405. all units - new kitchen cabinets, plumbing fixtures. lighting @ (e) jbox locations, dishwashers, w/d. no: change to mech, ext, fire alarm, sprinklers or structuralDetails
conversions for studios to 1 bedrm for 201,303,405,406,507,604. new bathroom in 405. all units - new kitchen cabinets, plumbing fixtures. lighting @ (e) jbox locations, dishwashers, w/d. no: change to mech, ext, fire alarm, sprinklers or structural | $360,000 |
| Mar 27, 2019 | Completed final sign-off Nov 2021 | 3201 Octavia St | exploratory demo at units 101,102,104,201,202,203,301,302,304; for cost evaluation; demo not to exceed 50 sq. ft. at each unit; replace in kindDetails
exploratory demo at units 101,102,104,201,202,203,301,302,304; for cost evaluation; demo not to exceed 50 sq. ft. at each unit; replace in kind | $7,500 |
| Feb 27, 2019 | Completed final sign-off Jun 2019 | 530 Stockton St | units 104 and 508: remodel kitchen and bathroom. install new electrical subpanel.Details
units 104 and 508: remodel kitchen and bathroom. install new electrical subpanel. | $36,000 |
| Feb 21, 2019 | Never finaled issued Feb 2019, no final | 1555 Chestnut St | apt 3: remodel ktichen, refinish floors, paint & patch, drywall, subpanel & electrical upgrades.Details
apt 3: remodel ktichen, refinish floors, paint & patch, drywall, subpanel & electrical upgrades. | $30,000 |
| Jan 11, 2019 | Never finaled issued Jan 2019, no final | 1637 Sacramento St | unit# 8 kitchen & bath remodel, replace (3) light fixts, replace kitchen cabinets, bath fixts, add washer/dryer. all in-kind. n/a for maher.Details
unit# 8 kitchen & bath remodel, replace (3) light fixts, replace kitchen cabinets, bath fixts, add washer/dryer. all in-kind. n/a for maher. | $36,837 |
| Jan 11, 2019 | Completed final sign-off Jun 2019 | 530 Stockton St | units 406 and 605 kitchen and bath remodel, replace kitchen cabinets and bath fixtures, add washer and dryer, replace existing light fixtures. all in kind.Details
units 406 and 605 kitchen and bath remodel, replace kitchen cabinets and bath fixtures, add washer and dryer, replace existing light fixtures. all in kind. | $40,000 |
| Nov 14, 2018 | Never finaled issued Nov 2018, no final | 530 Stockton St | kitchen bath remodel, replace existing light fixtures. no structural, no outside work.Details
kitchen bath remodel, replace existing light fixtures. no structural, no outside work. | $40,000 |
| Nov 14, 2018 | Completed final sign-off Jun 2019 | 1740 Sacramento St | kitchen and bath remodel, add washer, dryer no structural, no outside work.Details
kitchen and bath remodel, add washer, dryer no structural, no outside work. | $30,000 |
| Oct 11, 2018 | Completed final sign-off Jun 2019 | 1575 Sacramento St | unit #11: renovation of 3rd floor: new kitchen,new bathroom, new plmbg fixtures, nw lighting, add washer and dryer, add dishwasher. no exterior work. no structural work. no fire alarm or sprinkler work.Details
unit #11: renovation of 3rd floor: new kitchen,new bathroom, new plmbg fixtures, nw lighting, add washer and dryer, add dishwasher. no exterior work. no structural work. no fire alarm or sprinkler work. | $35,000 |
| Oct 3, 2018 | Never finaled issued Oct 2018, no final | 1431 Grove St | to obtain a final inspection for work approved under pa# 201704133953, all work is completeDetails
to obtain a final inspection for work approved under pa# 201704133953, all work is complete | |
| Aug 7, 2018 | Completed final sign-off Jan 2019 | 530 Stockton St | (unit #607)renovation on 6th floor:new bedroom, new dishwasher, new washer dryer, nw kitchen cabinets, nw plmg fixtures, nw lighting at extg jbox locations. no change to mech. no exterior work. no fire alarm or sprnkl work. no structural work.Details
(unit #607)renovation on 6th floor:new bedroom, new dishwasher, new washer dryer, nw kitchen cabinets, nw plmg fixtures, nw lighting at extg jbox locations. no change to mech. no exterior work. no fire alarm or sprnkl work. no structural work. | $30,000 |
| Jul 26, 2018 | Completed final sign-off Jan 2019 | 530 Stockton St | kitchen and bathroom remodel, new cabinets, sinks, toilets. no walls moved.Details
kitchen and bathroom remodel, new cabinets, sinks, toilets. no walls moved. | $33,000 |
| Jun 29, 2018 | Completed final sign-off Mar 2019 | 1433 Clay St | renovation of unit 5 on 2nd lvl add one bedroom at (e) kitchen, new plm fixtures, new ele, add dishwasher, drywe no exterior work. no fire alarm or sprinkler work. no structuralDetails
renovation of unit 5 on 2nd lvl add one bedroom at (e) kitchen, new plm fixtures, new ele, add dishwasher, drywe no exterior work. no fire alarm or sprinkler work. no structural | $25,000 |
| May 31, 2018 | Never finaled issued Aug 2018, no final | 726 Fillmore St | renovation of one unit #10 on 1st floor. replace kitchen and bath fixtures. new dishwasher and washer dryer. no work visible from street. n fire alarm or sprinkler work.Details
renovation of one unit #10 on 1st floor. replace kitchen and bath fixtures. new dishwasher and washer dryer. no work visible from street. n fire alarm or sprinkler work. | $65,000 |
| May 17, 2018 | Never finaled issued May 2018, no final | 530 Stockton St | renovation of 3 units 107 & 102 on 1st floor and 307 on 3rd fl. new bedrooms, new dishwashers, new kitchen cabinets, new plumbing fixts. new lighting at j-boc locations. no change to mechanical. no exterior work. no fire alarm or sprinkler work. no structural work. n/a for maher.Details
renovation of 3 units 107 & 102 on 1st floor and 307 on 3rd fl. new bedrooms, new dishwashers, new kitchen cabinets, new plumbing fixts. new lighting at j-boc locations. no change to mechanical. no exterior work. no fire alarm or sprinkler work. no structural work. n/a for maher. | $60,000 |
| May 17, 2018 | Never finaled issued Jul 2018, no final | 1433 Clay St | unit 11, 3rd fl - demo of non-structural walls. new bedroom, kitchen cabinets, plumbing fixtures, lighting & electrical. new dishwasher & washer/dryer. no structural. no change to mech. no exterior work. no fire alarm or sprinklers work. remodel (e) bath, add new bath.Details
unit 11, 3rd fl - demo of non-structural walls. new bedroom, kitchen cabinets, plumbing fixtures, lighting & electrical. new dishwasher & washer/dryer. no structural. no change to mech. no exterior work. no fire alarm or sprinklers work. remodel (e) bath, add new bath. | $10,000 |
| May 4, 2018 | Completed final sign-off Aug 2018 | 1637 Sacramento St | unit #2: kitchen cabinets replaced, replace tub, toilet & sink, replace existing lighting, retile bath, replace in kind stove. maher naDetails
unit #2: kitchen cabinets replaced, replace tub, toilet & sink, replace existing lighting, retile bath, replace in kind stove. maher na | $35,000 |
| Apr 20, 2018 | Never finaled issued Apr 2018, no final | 1330 Union St | unit 20: kitchen & bath remodel, replace cabinets, bath fixtures, no exterior work, no structural work, no walls changed.Details
unit 20: kitchen & bath remodel, replace cabinets, bath fixtures, no exterior work, no structural work, no walls changed. | $35,000 |
| Apr 20, 2018 | Completed final sign-off Dec 2018 | 1555 Chestnut St | unit 23: kitchen & bath remodel, replace cabinets & bath fixtures, no exterior work, no structural work, no walls changed.Details
unit 23: kitchen & bath remodel, replace cabinets & bath fixtures, no exterior work, no structural work, no walls changed. | $35,000 |
| Apr 18, 2018 | Completed final sign-off Mar 2019 | 726 Fillmore St | revision to permit 2018-0112-8575 update match existing conditions and shearwall lenght along north side revisedDetails
revision to permit 2018-0112-8575 update match existing conditions and shearwall lenght along north side revised | |
| Mar 22, 2018 | Completed final sign-off Sep 2018 | 3099 Washington St | unit #11: kitchen and bath remodel, new subpanel, kitchen cabinets, bath fixtures. no walls moved, removed, added or infilled. all existing layouts to remain unchanged.Details
unit #11: kitchen and bath remodel, new subpanel, kitchen cabinets, bath fixtures. no walls moved, removed, added or infilled. all existing layouts to remain unchanged. | $35,000 |
| Mar 8, 2018 | Never finaled issued Mar 2018, no final | 1290 Grove St | interior renovation of 6 extg apartments. units 103 and 106 on 1st floor, unit 306 on 3rd floor, unit 404 on 4th floor, units 601 and 603 on 6th floor. new kitchen and bath fixtures, new washer/dryers and dishwashers.Details
interior renovation of 6 extg apartments. units 103 and 106 on 1st floor, unit 306 on 3rd floor, unit 404 on 4th floor, units 601 and 603 on 6th floor. new kitchen and bath fixtures, new washer/dryers and dishwashers. | $300,000 |
| Mar 1, 2018 | Completed final sign-off Sep 2018 | 2425 Buchanan St | unit # 204: renovation of unit on 3rd level add one bedroom at (e) kitchen, new plumbing fixture, new ele. add dishwasher, w/d. no fire alarm or sprinkler work. n/a maherDetails
unit # 204: renovation of unit on 3rd level add one bedroom at (e) kitchen, new plumbing fixture, new ele. add dishwasher, w/d. no fire alarm or sprinkler work. n/a maher | $30,000 |
| Feb 20, 2018 | Never finaled issued Feb 2018, no final | 224 Haight St | unit #2: kitchen and bathroom remodel. replace kitchen cabinets, bath fixtures, install subpanel, no exterior work. no structural work. no wall modification, maher n/aDetails
unit #2: kitchen and bathroom remodel. replace kitchen cabinets, bath fixtures, install subpanel, no exterior work. no structural work. no wall modification, maher n/a | $40,000 |
| Feb 20, 2018 | Never finaled issued Feb 2018, no final | 220 Haight St | unit #1: kitchen and bathroom remodel. replace kitchen cabinets, bath fixtures, install subpanel, no exterior work. no structural work. no wall modification, maher n/aDetails
unit #1: kitchen and bathroom remodel. replace kitchen cabinets, bath fixtures, install subpanel, no exterior work. no structural work. no wall modification, maher n/a | $35,000 |
| Feb 20, 2018 | Completed final sign-off Aug 2018 | 1 Scott St | unit #4: kitchen and bathroom remodel. replace kitchen cabinets, bath fixtures, install subpanel, no exterior work. no structural work. no wall modification,Details
unit #4: kitchen and bathroom remodel. replace kitchen cabinets, bath fixtures, install subpanel, no exterior work. no structural work. no wall modification, | $35,000 |
| Feb 15, 2018 | Never finaled issued Mar 2018, no final | 1433 Clay St | renovation of unit 6 on level 2, new kitchen cabinets, new plumbing fixtures, new washer-dryer, new lighting at (e) j-box locations, no change to mechanical, no exterior work, no fire alarm or sprinkler work, no structural work, new bedroom. n/a maherDetails
renovation of unit 6 on level 2, new kitchen cabinets, new plumbing fixtures, new washer-dryer, new lighting at (e) j-box locations, no change to mechanical, no exterior work, no fire alarm or sprinkler work, no structural work, new bedroom. n/a maher | $55,000 |
| Feb 5, 2018 | Completed final sign-off Oct 2021 | 220 Haight St | soft story retrofit of crawlspace per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. to comply with nov #201716721. maher 02Details
soft story retrofit of crawlspace per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. to comply with nov #201716721. maher 02 | $80,000 |
| Jan 30, 2018 | Completed final sign-off Aug 2018 | 1223 Laguna St | #1225. remodel kitchen & bath, new cabinets & fixtures, add closet in bedroom, add dishwasher. no rough framing and / or change of (e) layout.Details
#1225. remodel kitchen & bath, new cabinets & fixtures, add closet in bedroom, add dishwasher. no rough framing and / or change of (e) layout. | $38,000 |
| Jan 26, 2018 | Completed final sign-off Jun 2018 | 1575 Sacramento St | work in unit #9: kitchen and bath remodel, tile floor, new fixturesDetails
work in unit #9: kitchen and bath remodel, tile floor, new fixtures | $40,000 |
| Jan 24, 2018 | Completed final sign-off Jun 2018 | 2425 Buchanan St | unit#101 remodel kitchen & bath. n/a for maher.Details
unit#101 remodel kitchen & bath. n/a for maher. | $30,000 |
| Jan 24, 2018 | Expired or cancelled cancelled Jan 2026 | 726 Fillmore St | Details
| $34,000 |
| Jan 24, 2018 | Completed final sign-off Aug 2018 | 1637 Sacramento St | unit#5 remodel kitchen & bath, replace cabinets, sinks, tub, etc. kitchen bath floor tile. repair walls. n/a for maher.Details
unit#5 remodel kitchen & bath, replace cabinets, sinks, tub, etc. kitchen bath floor tile. repair walls. n/a for maher. | $34,000 |
| Jan 23, 2018 | Completed final sign-off Apr 2018 | 1740 Sacramento St | unit #2: remodel kitchen & bathroom, replace cabinets, tile, sinks, etc. maher n/a. to comply with complaint #201833063Details
unit #2: remodel kitchen & bathroom, replace cabinets, tile, sinks, etc. maher n/a. to comply with complaint #201833063 | $20,000 |
| Jan 23, 2018 | Completed final sign-off Mar 2018 | 726 Fillmore St | unit 2. remodel ktichen & bathroom with new cabinets, tile, sinks, electrical, etc.Details
unit 2. remodel ktichen & bathroom with new cabinets, tile, sinks, electrical, etc. | $85,000 |
| Jan 23, 2018 | Completed final sign-off Mar 2018 | 726 Fillmore St | unit 3. remodel ktichen & bathroom with new cabinets, tile, sinks, electrical, etc.Details
unit 3. remodel ktichen & bathroom with new cabinets, tile, sinks, electrical, etc. | $20,000 |
| Jan 23, 2018 | Never finaled issued Jan 2018, no final | 1740 Sacramento St | unit #7: remodel kitchen & bathroom, replace cabinets, tile, sinks, etc. maher n/a. to comply with complaint #201833063Details
unit #7: remodel kitchen & bathroom, replace cabinets, tile, sinks, etc. maher n/a. to comply with complaint #201833063 | $20,000 |
| Jan 23, 2018 | Completed final sign-off Apr 2018 | 1740 Sacramento St | unit #1: remodel kitchen & bathroom, replace cabinets, tile, sinks, etc. maher n/a.to comply with complaint #201833063Details
unit #1: remodel kitchen & bathroom, replace cabinets, tile, sinks, etc. maher n/a.to comply with complaint #201833063 | $80,000 |
| Jan 16, 2018 | Never finaled issued Jan 2018, no final | 201 Divisadero St | unit#201 retile kitchen & bath floors. replace kitchen & bath countertop. n/a for maher.Details
unit#201 retile kitchen & bath floors. replace kitchen & bath countertop. n/a for maher. | $15,000 |
| Jan 12, 2018 | Completed final sign-off Mar 2019 | 726 Fillmore St | soft story retrofit in accordance woth 2016 cebc chapter a4 to comply with nov 201716031 cesDetails
soft story retrofit in accordance woth 2016 cebc chapter a4 to comply with nov 201716031 ces | $40,000 |
| Dec 22, 2017 | Completed final sign-off Aug 2018 | 2199 California St | renovation of apt #8 on 3rd fl: new kitchen cabinets, new plumbing fixtures, add dishwasher & washer dryer, new lighting at existing jbox locations. no change to mechanical. no exterior work. no fire alarm or sprinkler work.Details
renovation of apt #8 on 3rd fl: new kitchen cabinets, new plumbing fixtures, add dishwasher & washer dryer, new lighting at existing jbox locations. no change to mechanical. no exterior work. no fire alarm or sprinkler work. | $75,000 |
| Sep 28, 2017 | Never finaled issued Jan 2018, no final | 818 Waller St | #818 - interior renovation on 3rd fl. adding one bedroom. remodel kitchen. new kitchen cabinets, new plumbing fixtures, new lighting & (e) j-boxes. no change to mech. no ext. f/a & sprinkler under sep permit. add w/d. #201 - new dishwasher & install w/d.Details
#818 - interior renovation on 3rd fl. adding one bedroom. remodel kitchen. new kitchen cabinets, new plumbing fixtures, new lighting & (e) j-boxes. no change to mech. no ext. f/a & sprinkler under sep permit. add w/d. #201 - new dishwasher & install w/d. | $85,000 |
| Sep 14, 2017 | Completed final sign-off Oct 2021 | 218 Haight St | mandatory soft story retrofit per sfebc chapter 4d - isntall plywood shear walls at 1st floor garage design criteria per 2016 cebc appendix a-4.Details
mandatory soft story retrofit per sfebc chapter 4d - isntall plywood shear walls at 1st floor garage design criteria per 2016 cebc appendix a-4. | $70,000 |
| Jun 21, 2017 | Completed final sign-off May 2019 | 930 Post St | unit 1: kitchen & bathroom remodelDetails
unit 1: kitchen & bathroom remodel | $35,000 |
| Jun 7, 2017 | Completed final sign-off Jun 2018 | 1433 Clay St | renovation of unit 2 at 1st flr. demo of non structural walls. new kitchen cabinets, new plumb fixtures, new lighting & elect. no chage to mech. no exterior work. no fire alarm or sprinkler work. maher naDetails
renovation of unit 2 at 1st flr. demo of non structural walls. new kitchen cabinets, new plumb fixtures, new lighting & elect. no chage to mech. no exterior work. no fire alarm or sprinkler work. maher na | $110,400 |
| Apr 6, 2017 | Expired or cancelled expired Sep 2019 | 254 Ivy St | legalization of (e) unit 254 ivy #a @ first flr per ord 43-14. 470 sf.Details
legalization of (e) unit 254 ivy #a @ first flr per ord 43-14. 470 sf. | |
| Nov 18, 2016 | Never finaled issued May 2017, no final | 1637 Sacramento St | remodel e apts, unit 1 at 1st fl. units 14, 15 at 4th fl. demolish structural walls, new kitchen cabinets, plumbing fixtures, lighting, elec, no exterior work. fire alarm sep permitDetails
remodel e apts, unit 1 at 1st fl. units 14, 15 at 4th fl. demolish structural walls, new kitchen cabinets, plumbing fixtures, lighting, elec, no exterior work. fire alarm sep permit | $180,000 |