Urban Painting Inc
- Based in
- San Rafael
- On San Francisco permits
- Sep 2019 to Oct 2025
- Last 24 months
- 1 permit filed
2 permits since 2000: 1 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 29, 2025 | Completed final sign-off Nov 2025 | 66 Cleary Ct | repair of minor spalls in concrete. no reinforcing required. fill with surface filler.Details
repair of minor spalls in concrete. no reinforcing required. fill with surface filler. | $30,000 |
| Sep 5, 2019 | Never finaled issued Sep 2019, no final | 115 Red Rock Wy | under 50 % repair to connector walkways between apt buildings throughout complex. work includes deck coatings and paintings, replacement of some sheet metal flashing, wood siding removal, replacement at flashings and steel rail repairDetails
under 50 % repair to connector walkways between apt buildings throughout complex. work includes deck coatings and paintings, replacement of some sheet metal flashing, wood siding removal, replacement at flashings and steel rail repair | $400,000 |