Upright Mechanical
- Based in
- Sacramento
- On San Francisco permits
- Nov 2018 to Oct 2024
- Last 24 months
- 0 permits filed
3 permits since 2000: 2 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 2, 2024 | Completed final sign-off Jan 2025 | 584 Funston Av | replace water damaged tile shower, floor and backerboard. replace (e) shower, toilet, sink, lights, vanity, cabinets, and surrounding shower wall tile. no wall removal or layout change for guest bathroomDetails
replace water damaged tile shower, floor and backerboard. replace (e) shower, toilet, sink, lights, vanity, cabinets, and surrounding shower wall tile. no wall removal or layout change for guest bathroom | $15,000 |
| Sep 15, 2020 | Never finaled issued Sep 2020, no final | 30 Paloma Av | install jetted walk-in-tub remove old tub, connect to (e) supply and drain, add 2 20 amp 120 volt gfciDetails
install jetted walk-in-tub remove old tub, connect to (e) supply and drain, add 2 20 amp 120 volt gfci | $10,000 |
| Nov 16, 2018 | Completed final sign-off Dec 2018 | 38 Addison St | install jeeted walk in tub remove old tub, connect new tub to supply & drain lines, moce (e) electrical to new location /ground pump use (e) backsplashDetails
install jeeted walk in tub remove old tub, connect new tub to supply & drain lines, moce (e) electrical to new location /ground pump use (e) backsplash | $8,100 |