United Quality Construction
- Based in
- San Jose
- On San Francisco permits
- Feb 2013 to Jan 2016
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 22, 2016 | Completed final sign-off May 2016 | 4311 17th St | replace rotted framing required in-kind, if found replace upper part pf wood siding that is water damage with fiber cement hardie plank horizontalsiding, cedar wall only upper 12 ft x 60 ft section. work in rear of building.Details
replace rotted framing required in-kind, if found replace upper part pf wood siding that is water damage with fiber cement hardie plank horizontalsiding, cedar wall only upper 12 ft x 60 ft section. work in rear of building. | $30,000 |
| Feb 1, 2013 | Completed final sign-off Mar 2013 | 45 Rosewood Dr | front entrance tile replacement see picture attachedDetails
front entrance tile replacement see picture attached | $3,500 |