Tyson Bruce Construction
- Based in
- San Bruno
- On San Francisco permits
- Sep 2018 to Dec 2019
- Last 24 months
- 0 permits filed
5 permits since 2000: 4 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 5, 2019 | Completed final sign-off Nov 2021 | 64 Lamartine St | revision to pa 2019-0327-6411 move footing 3' on existing beamDetails
revision to pa 2019-0327-6411 move footing 3' on existing beam | $1,000 |
| Aug 30, 2019 | Never finaled issued Aug 2019, no final | 2203 North Point St | remodel kitchen and bathroom in kind. no structual. no windows. kitchen is 8 feet by 12 feet. bathroom is 5 feet by 9 feet.Details
remodel kitchen and bathroom in kind. no structual. no windows. kitchen is 8 feet by 12 feet. bathroom is 5 feet by 9 feet. | $65,000 |
| Apr 12, 2019 | Completed final sign-off Sep 2021 | 64 Lamartine St | remove and replace cabinets, counters and appliances. all locations to remain. remove and replace lightwell window (max u-factor 0.32). no change to dimensions or location. update plumbing and electrical to code compliance.Details
remove and replace cabinets, counters and appliances. all locations to remain. remove and replace lightwell window (max u-factor 0.32). no change to dimensions or location. update plumbing and electrical to code compliance. | $25,000 |
| Mar 27, 2019 | Completed final sign-off Nov 2021 | 64 Lamartine St | add unit per ord 95-17. add ground floor unit to garage.Details
add unit per ord 95-17. add ground floor unit to garage. | $85,000 |
| Sep 12, 2018 | Completed final sign-off Dec 2018 | 59 Wawona St | remove and replace all surfaces and fixtures in downstairs bathroom. bring all plmg and electrical up to code. no walls moved. removed added or refilled. all extg layouts to remain unchanged.Details
remove and replace all surfaces and fixtures in downstairs bathroom. bring all plmg and electrical up to code. no walls moved. removed added or refilled. all extg layouts to remain unchanged. | $25,000 |