Turn Key Custom Inc
- Based in
- Elgranada
- On San Francisco permits
- May 2014 to Oct 2019
- Last 24 months
- 0 permits filed
3 permits since 2000: 3 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 31, 2019 | Completed final sign-off Feb 2020 | 4224 26th St | remove and replace e deck with like for likeDetails
remove and replace e deck with like for like | $12,000 |
| Jun 25, 2019 | Completed final sign-off Aug 2020 | 4224 26th St | kitchen remodel, bath remodel structural beam, replace rear windows in kind, minor dryrot repairDetails
kitchen remodel, bath remodel structural beam, replace rear windows in kind, minor dryrot repair | $75,000 |
| May 9, 2014 | Completed final sign-off Jun 2016 | 3626 Lyon St | a remodel to the 1st floor including converting plus or minus 253 sq ft of extg unconditioned 1st floor entry atrium to conditioned space. inlcudes eliminating extg entry gate and replacing with new front door. includes remodel of extg primary stairs from 1st floor to 2nd floor, remodel to 2nd floorDetails
a remodel to the 1st floor including converting plus or minus 253 sq ft of extg unconditioned 1st floor entry atrium to conditioned space. inlcudes eliminating extg entry gate and replacing with new front door. includes remodel of extg primary stairs from 1st floor to 2nd floor, remodel to 2nd floor | $80,000 |