Tt Construction & Engineering Inc.
- Based in
- Berkeley
- On San Francisco permits
- Sep 2000 to May 2011
- Last 24 months
- 0 permits filed
7 permits since 2000: 6 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 25, 2011 | Completed final sign-off May 2011 | 2010 Lyon St | to obtain final inspection for work approved under pa#200604189238. all work is complete.Details
to obtain final inspection for work approved under pa#200604189238. all work is complete. | |
| Jun 23, 2009 | Completed final sign-off Nov 2010 | 35 Rockwood Ct | remodel master bedrm and bath on upper fl; install beams and posts where walls are removed or altered; replace front window sash to match existing; repair rear window sash and frame (smaller unit)Details
remodel master bedrm and bath on upper fl; install beams and posts where walls are removed or altered; replace front window sash to match existing; repair rear window sash and frame (smaller unit) | $80,000 |
| Jun 16, 2009 | Completed final sign-off Mar 2010 | 111 Santa Paula Av | enclose 2nd floor balcony by adding space to (e) adjoining roomDetails
enclose 2nd floor balcony by adding space to (e) adjoining room | $50,000 |
| Feb 9, 2009 | Completed final sign-off Mar 2010 | 44 Elsie St | revision to app.#200809161749. shearwall revision @ ground level.Details
revision to app.#200809161749. shearwall revision @ ground level. | |
| Sep 16, 2008 | Completed final sign-off Mar 2010 | 44 Elsie St | interior remodeling, renovate kitchen and family room w/supporting electrical changes, renovate bathroom, change & increase size of 4 windows @ main floor and basement. seismic improvements @ main floor throught basement.Details
interior remodeling, renovate kitchen and family room w/supporting electrical changes, renovate bathroom, change & increase size of 4 windows @ main floor and basement. seismic improvements @ main floor throught basement. | $95,000 |
| Jan 7, 2008 | Completed final sign-off Mar 2008 | 539 14th Av | replace existing toilet, tub, shower fixts, sink w/ new in place(on extng place). replace extng tile w/ new tile(work done on unit#a) electrical done would be on diff. permit w/ diff elect. contractorDetails
replace existing toilet, tub, shower fixts, sink w/ new in place(on extng place). replace extng tile w/ new tile(work done on unit#a) electrical done would be on diff. permit w/ diff elect. contractor | $15,000 |
| Sep 12, 2000 | Expired or cancelled expired Jan 2001 | 355 Melrose Av | add hot tub add raised concrete pad retaining wallDetails
add hot tub add raised concrete pad retaining wall | $5,000 |