True North Construction
- Based in
- Larkspur
- On San Francisco permits
- Jan 2001 to Jul 2018
- Last 24 months
- 0 permits filed
7 permits since 2000: 6 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 27, 2018 | Completed final sign-off Jan 2021 | 1848 Green St | revision to bpa #201412103446 addenda 1 - new interior layout for kitchen, living room, & dining room. level 2 - new interior layout for 1848 master bedroom. level 3 - windows added to west wall; window layout at (w) elevaation updated.Details
revision to bpa #201412103446 addenda 1 - new interior layout for kitchen, living room, & dining room. level 2 - new interior layout for 1848 master bedroom. level 3 - windows added to west wall; window layout at (w) elevaation updated. | |
| Apr 4, 2017 | Completed final sign-off Feb 2019 | 1762 45th Av | replace finishes in kitchen, rewire (replace knob & tube), replace sink, re-duct hood to roof, replace appliances, add insulation, new drywall, add recessed led lights, replace light & outlet at bathroom to be high efficacy.Details
replace finishes in kitchen, rewire (replace knob & tube), replace sink, re-duct hood to roof, replace appliances, add insulation, new drywall, add recessed led lights, replace light & outlet at bathroom to be high efficacy. | $15,000 |
| Feb 7, 2017 | Completed final sign-off Apr 2019 | 1762 45th Av | legalize an existing bathroom and (bedroom with an addition of 116 sq. ft. on the ground floor). expand entry (75.5 sq ft) within (e) footprint. several window additions/changesDetails
legalize an existing bathroom and (bedroom with an addition of 116 sq. ft. on the ground floor). expand entry (75.5 sq ft) within (e) footprint. several window additions/changes | $50,000 |
| Dec 14, 2015 | Never finaled issued Feb 2017, no final | 1848 Green St | demolish (e) garageDetails
demolish (e) garage | $10,000 |
| Dec 10, 2014 | Completed final sign-off Jan 2021 | 1848 Green St | hor. & vert/addition to(e)2 units bld. demo(e)garage in rear yard.newDetails
hor. & vert/addition to(e)2 units bld. demo(e)garage in rear yard.new | $1,825,080 |
| Jun 28, 2013 | Completed final sign-off Nov 2021 | 807 Bosworth St | demolish (e) conc. carport in front of lot. construct new 2nd dwelling unit in front of lot living room, kitchen, 2 bedrooms, 2 baths, garage, office in (e) single family residence in mid-lot to remain. foundation work at (e) single family residence as required.Details
demolish (e) conc. carport in front of lot. construct new 2nd dwelling unit in front of lot living room, kitchen, 2 bedrooms, 2 baths, garage, office in (e) single family residence in mid-lot to remain. foundation work at (e) single family residence as required. | $200,000 |
| Jan 24, 2001 | Completed final sign-off Apr 2002 | 2015 Jefferson St | concrete mat fndtn for future remodelDetails
concrete mat fndtn for future remodel | $10,000 |