Triton Construction
- Based in
- Aptos
- On San Francisco permits
- Jun 2012 to Sep 2014
- Last 24 months
- 0 permits filed
4 permits since 2000: 3 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 25, 2014 | Completed final sign-off Oct 2014 | 750 Guerrero St | revision to app. 201408224509, match retrofit to same as other wall/side shearwall, no brackets/metal); maher n/aDetails
revision to app. 201408224509, match retrofit to same as other wall/side shearwall, no brackets/metal); maher n/a | |
| Aug 22, 2014 | Completed final sign-off Jul 2019 | 750 Guerrero St | the scope of work is limited to the seismic retrofit of the buildings crawl space cripple wall bracing by adding plywood and framing connectors. no exterior alterations; maher n/a; soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4.Details
the scope of work is limited to the seismic retrofit of the buildings crawl space cripple wall bracing by adding plywood and framing connectors. no exterior alterations; maher n/a; soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4. | $25,000 |
| Jul 19, 2012 | Never finaled issued Jul 2012, no final | 750 Guerrero St | work in unit #6: relocate water heater and gas for range. add more electrical outlets. kitchen remodel.Details
work in unit #6: relocate water heater and gas for range. add more electrical outlets. kitchen remodel. | $5,000 |
| Jun 18, 2012 | Completed final sign-off Jan 2013 | 95 Grand View Av | unit #3 - interior remodel one unit within an (e) 10 unit apt. bldg. no modification ot exterior, no structural work. relocate furnace, remodel bathroom, expand unit by relocating common laundry room, relocate laundry room to 3rd floor.Details
unit #3 - interior remodel one unit within an (e) 10 unit apt. bldg. no modification ot exterior, no structural work. relocate furnace, remodel bathroom, expand unit by relocating common laundry room, relocate laundry room to 3rd floor. | $25,000 |