Tringali Construction
- Based in
- San Carlos
- On San Francisco permits
- Oct 2005 to Jul 2021
- Last 24 months
- 0 permits filed
7 permits since 2000: 6 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 23, 2021 | Completed final sign-off Dec 2021 | 2716 Franklin St | #2: kitchen & bathroom remodel in-kind, electrical upgrade, subpanel in unit. bath 7x8, kitchen 10x7.Details
#2: kitchen & bathroom remodel in-kind, electrical upgrade, subpanel in unit. bath 7x8, kitchen 10x7. | $32,000 |
| Apr 13, 2021 | Completed final sign-off Jun 2021 | 834 Masonic Av | in kind one bathroom remodel. replace one window in kind not facing street.Details
in kind one bathroom remodel. replace one window in kind not facing street. | $16,800 |
| Oct 22, 2020 | Completed final sign-off Jan 2021 | 2716 Franklin St | remodel kitchen & bath in kind. electrical upgradeDetails
remodel kitchen & bath in kind. electrical upgrade | $32,000 |
| Jun 16, 2020 | Completed final sign-off Aug 2020 | 2716 Franklin St | unit 4 - bathroom remodel in kind. partial kitchen remodel in kind ( update electrical, new cabinet, new sink). upgrade electrical panel for unit, new sub panel inside unit.Details
unit 4 - bathroom remodel in kind. partial kitchen remodel in kind ( update electrical, new cabinet, new sink). upgrade electrical panel for unit, new sub panel inside unit. | $26,000 |
| May 31, 2006 | Completed final sign-off Aug 2006 | 1883 34th Av | rev. to pa#2005/06/03/4138 & 2006/05/22/2100 - french door to remain 5' x 76", do not remove window. replace with same size wood framed double glzed windowDetails
rev. to pa#2005/06/03/4138 & 2006/05/22/2100 - french door to remain 5' x 76", do not remove window. replace with same size wood framed double glzed window | |
| May 22, 2006 | Completed final sign-off Aug 2006 | 1883 34th Av | revision appl#200506034138 6x6'8"slider, install 6x6'8"french doors, install 6x8 header. cut 4"into stem wall, remove concrete slab. add 4"drain rock, vapor barrier, 2" sand, #4 rebar 16" q.c. tie #4 rebar into foundation walls with approved epoxy. add 8 recessed lights, 4 in family room,4 in officeDetails
revision appl#200506034138 6x6'8"slider, install 6x6'8"french doors, install 6x8 header. cut 4"into stem wall, remove concrete slab. add 4"drain rock, vapor barrier, 2" sand, #4 rebar 16" q.c. tie #4 rebar into foundation walls with approved epoxy. add 8 recessed lights, 4 in family room,4 in office | |
| Oct 18, 2005 | Never finaled issued Oct 2005, no final | 290 San Carlos St | remove extg siding at rear of bldg/replace with tylex insulation wrap/install hardi plank siding/remove extg wndw 8 and siding glass doors2 replace with new one's in kind not facining streetDetails
remove extg siding at rear of bldg/replace with tylex insulation wrap/install hardi plank siding/remove extg wndw 8 and siding glass doors2 replace with new one's in kind not facining street | $18,000 |