Trinet Construction
- Based in
- San Francisco
- On San Francisco permits
- Oct 2009 to Jul 2011
- Last 24 months
- 0 permits filed
6 permits since 2000: 4 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 21, 2011 | Never finaled issued Jul 2011, no final | 275 Munich St | underground 4" dip fire line. ref pa# 2010.12.28.7507Details
underground 4" dip fire line. ref pa# 2010.12.28.7507 | $1,500 |
| Jun 14, 2011 | Expired or cancelled expired May 2021 | 277 Munich St | underpin north foundation wall to accommodate new adjacent foundation work. shore north side of rear yard w/ soldier piles w/ bracing per plan.Details
underpin north foundation wall to accommodate new adjacent foundation work. shore north side of rear yard w/ soldier piles w/ bracing per plan. | $8,000 |
| May 26, 2010 | Completed final sign-off Jan 2011 | 320 Clementina St | revision to pa# 2009.12.18.3488. install an 18" x 18" drainage inlet in front yard , and 63 lf of 8". drain line from drainage inlet to (e) catch basin.Details
revision to pa# 2009.12.18.3488. install an 18" x 18" drainage inlet in front yard , and 63 lf of 8". drain line from drainage inlet to (e) catch basin. | $10,000 |
| Mar 16, 2010 | Completed final sign-off Jan 2011 | 330 Clementina St | rev. to pa# 2009.10.21.9519. replace (e) under floor wet stand pipe (3") with new above ground wet stand pipe of same size (3") and reconnect to the new underground wet standpipe outside the building.Details
rev. to pa# 2009.10.21.9519. replace (e) under floor wet stand pipe (3") with new above ground wet stand pipe of same size (3") and reconnect to the new underground wet standpipe outside the building. | $29,000 |
| Dec 18, 2009 | Completed final sign-off Jan 2011 | 320 Clementina St | public housing. site improvements including courtyard paving, landscape irrigation system,outdoor amenities, metal fence, accessible entrance and loadin area, outdoor lighting. replace existing ventry canopy, sidewalk replacement with handicapped ramp.Details
public housing. site improvements including courtyard paving, landscape irrigation system,outdoor amenities, metal fence, accessible entrance and loadin area, outdoor lighting. replace existing ventry canopy, sidewalk replacement with handicapped ramp. | $458,000 |
| Oct 21, 2009 | Completed final sign-off Feb 2011 | 320 Clementina St | replace 160 l.f. of underground 3" galvanized steel fire line with new 3" cupper pipe.Details
replace 160 l.f. of underground 3" galvanized steel fire line with new 3" cupper pipe. | $45,000 |