Trenery Building
- Based in
- Pacifica
- On San Francisco permits
- Jun 2003 to Sep 2003
- Last 24 months
- 0 permits filed
3 permits since 2000: 3 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 25, 2003 | Completed final sign-off Nov 2003 | 59 Hazelwood Av | repair dry rotted areas epr attached skietchDetails
repair dry rotted areas epr attached skietch | $2,000 |
| Aug 21, 2003 | Completed final sign-off Nov 2003 | 59 Hazelwood Av | remove brick&concrete stairs&stucco to replace dryrotted wood underneath.reinstall concrete stairsDetails
remove brick&concrete stairs&stucco to replace dryrotted wood underneath.reinstall concrete stairs | $6,000 |
| Jun 11, 2003 | Completed final sign-off Aug 2003 | 1392 Plymouth Av | replace front porch brick, concrete & stucco to repair dry rot, repair dry rot sheating @ front wallDetails
replace front porch brick, concrete & stucco to repair dry rot, repair dry rot sheating @ front wall | $6,000 |