Tim Walsh Builders Inc
- Based in
- Mill Valley
- On San Francisco permits
- Mar 2012 to Apr 2019
- Last 24 months
- 0 permits filed
5 permits since 2000: 4 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 5, 2019 | Completed final sign-off Sep 2020 | 101 Lombard St | apt 314e - int remodel to (e) 2 bedroom condo unit within 4 unit residential bld. removeal of portion of non structural int walls, new kitche counters & appliances, new int doors & ele/lighting. one window converted from casement, no other exterior changeDetails
apt 314e - int remodel to (e) 2 bedroom condo unit within 4 unit residential bld. removeal of portion of non structural int walls, new kitche counters & appliances, new int doors & ele/lighting. one window converted from casement, no other exterior change | $130,000 |
| Jun 11, 2015 | Completed final sign-off Apr 2016 | 718 23rd Av | voluntary structural upgrade of ground floor.Details
voluntary structural upgrade of ground floor. | $20,000 |
| Jun 10, 2014 | Never finaled issued Jun 2014, no final | 1121 Masonic Av | 1121b (3rd/f) - move bathroom door, replace window, enlarge closet.Details
1121b (3rd/f) - move bathroom door, replace window, enlarge closet. | $5,000 |
| Apr 19, 2012 | Completed final sign-off Mar 2016 | 718 23rd Av | voluntary installation of plywood, blocking and hold downs on 2 walls at the 2nd floor kitchen.Details
voluntary installation of plywood, blocking and hold downs on 2 walls at the 2nd floor kitchen. | $2,000 |
| Mar 27, 2012 | Completed final sign-off Jul 2012 | 718 23rd Av | kitchen remodel, new cabinets, appliances, floor, counters, electrical, plumbing, fisture paint, and floor. powder room. move non load bearing wall and install new vanity/sinkDetails
kitchen remodel, new cabinets, appliances, floor, counters, electrical, plumbing, fisture paint, and floor. powder room. move non load bearing wall and install new vanity/sink | $75,000 |