Tierney Construction
- Based in
- San Francisco
- On San Francisco permits
- Sep 2002 to Aug 2025
- Last 24 months
- 1 permit filed
9 permits since 2000: 7 completed, 2 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 5, 2025 | In progress issued Sep 2025 | 52 Kissling St | interior kitchen remodel and bathroom to existing duplex residence.Details
interior kitchen remodel and bathroom to existing duplex residence. | $5,000 |
| Jun 14, 2024 | In progress issued Jun 2024 | 52 Kissling St | dryrot repair next to garage door & next to front stairs. dryrot repair base of back stairs post less than 50%. replace as needed to match (e). replace (7) windows inkind within the same opening. wood w/ ogee window type.Details
dryrot repair next to garage door & next to front stairs. dryrot repair base of back stairs post less than 50%. replace as needed to match (e). replace (7) windows inkind within the same opening. wood w/ ogee window type. | $5,000 |
| Apr 18, 2014 | Completed final sign-off Jul 2014 | 818 Diamond St | dry rot repair below roof drain pipe at rear of building, 4' x 10' areaDetails
dry rot repair below roof drain pipe at rear of building, 4' x 10' area | $1,400 |
| Nov 6, 2013 | Completed final sign-off Jan 2014 | 818 Diamond St | repair back stairs step and post repair, all less than 50%Details
repair back stairs step and post repair, all less than 50% | $1,200 |
| May 26, 2010 | Completed final sign-off Jul 2010 | 778 46th Av | termite damage repair. front of bldg. remove stucco and sheeting. repair and replace framingDetails
termite damage repair. front of bldg. remove stucco and sheeting. repair and replace framing | $2,500 |
| Mar 22, 2006 | Completed final sign-off Apr 2006 | 778 46th Av | replace porch floor framing in kind , replace decayed stairs in kind. same location, same configurationDetails
replace porch floor framing in kind , replace decayed stairs in kind. same location, same configuration | $1,000 |
| Dec 30, 2004 | Completed final sign-off Feb 2005 | 24 Linda St | repair rear exterior stairs deteriorated tread post and guardrails. less than 50% of structure. replDetails
repair rear exterior stairs deteriorated tread post and guardrails. less than 50% of structure. repl | $1,500 |
| Aug 27, 2004 | Completed final sign-off Oct 2004 | 3375 22nd St | correct notice of violation. rear exterior stair repair. item#23. less than 50% in kind, 10 steps toDetails
correct notice of violation. rear exterior stair repair. item#23. less than 50% in kind, 10 steps to | $500 |
| Sep 20, 2002 | Completed final sign-off Sep 2002 | 172 Linda St | repair stair (rear), deteariated stringer & posts to comply nov#200232286Details
repair stair (rear), deteariated stringer & posts to comply nov#200232286 | $1,000 |