Tibbetts Construction
- Based in
- Santa Rosa
- On San Francisco permits
- Jun 2002 to Aug 2010
- Last 24 months
- 0 permits filed
5 permits since 2000: 5 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 24, 2010 | Completed final sign-off Nov 2010 | 2516 Mcallister St | revision to app#201005112231 60' of foundation repair pouring new 4" concrete pad. replacing 2x8 floor joist with like material.Details
revision to app#201005112231 60' of foundation repair pouring new 4" concrete pad. replacing 2x8 floor joist with like material. | $12,000 |
| May 11, 2010 | Completed final sign-off Nov 2010 | 2516 Mcallister St | repair dry rot damage to basement walls and repair brick perimeter foundation as shown on plans; 30'linealDetails
repair dry rot damage to basement walls and repair brick perimeter foundation as shown on plans; 30'lineal | $25,000 |
| Mar 5, 2009 | Completed final sign-off May 2010 | 1348 10th Av | bldg volume restoration(infill) at 1st flr and mezz levels @ rear & front entry. infill @ (e) recessed entry, infill @ rear 1st fl. strl. upgrade, access upgrade, 4 ac baths, 1 unisex and ptn. change under #2008.0923.2425 & #2008.1120.7065. change of use from school to office under #2008.1125.7283Details
bldg volume restoration(infill) at 1st flr and mezz levels @ rear & front entry. infill @ (e) recessed entry, infill @ rear 1st fl. strl. upgrade, access upgrade, 4 ac baths, 1 unisex and ptn. change under #2008.0923.2425 & #2008.1120.7065. change of use from school to office under #2008.1125.7283 | $20,000 |
| Nov 25, 2008 | Completed final sign-off May 2010 | 1348 10th Av | change of use from school to office. voluntary structural upgrade, accessibility upgrades & accessible bathrooms. 1 unisex bathroom & partition changes per pa# 2008/09/23/2425 & pa# 2008/11/20/7065.Details
change of use from school to office. voluntary structural upgrade, accessibility upgrades & accessible bathrooms. 1 unisex bathroom & partition changes per pa# 2008/09/23/2425 & pa# 2008/11/20/7065. | |
| Jun 25, 2002 | Completed final sign-off Jan 2003 | 970 Anza St | storeroom in garage area,install 1 1/2 baths/ utility in bsmt. remv/rplc fau & h/w units legalize bDetails
storeroom in garage area,install 1 1/2 baths/ utility in bsmt. remv/rplc fau & h/w units legalize b | $20,000 |