Thomas Lebeau
- Based in
- Pacifica
- On San Francisco permits
- Sep 2014 to Dec 2016
- Last 24 months
- 0 permits filed
5 permits since 2000: 4 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 15, 2016 | Completed final sign-off Feb 2018 | 2320 Ulloa St | to (n) excavate rear yard to include 5'-0" high retaining wall and wood stair to upper rear yard. remove existing concrete stairsDetails
to (n) excavate rear yard to include 5'-0" high retaining wall and wood stair to upper rear yard. remove existing concrete stairs | $35,000 |
| Feb 19, 2016 | Completed final sign-off Jul 2016 | 4142 Folsom St | convert 155 s.f. at rear of garage to 3rd bedroom. replace rear door with glass door, relocate washer/dryer, new light, electrical in new bedroomDetails
convert 155 s.f. at rear of garage to 3rd bedroom. replace rear door with glass door, relocate washer/dryer, new light, electrical in new bedroom | $25,000 |
| Jun 30, 2015 | Never finaled issued Jul 2015, no final | 106 Delano Av | revision to pa #2015.0422.4348 - add details for inspection, add new footing under the garage hallway wall.Details
revision to pa #2015.0422.4348 - add details for inspection, add new footing under the garage hallway wall. | $1,000 |
| Apr 22, 2015 | Completed final sign-off Mar 2018 | 106 Delano Av | 1st floor: add 490 sf liv sp w/connecting stair, add fam rm w/bar sink, new bath, new fire rated exit corridor, repalce new rear windows, excavate, new slab, underpin footing. 2nd fl: new stair to 1st fl, infill lightwell in kitchen, remodel kitchen, remove (e)stair, infill floor,remodel laundry rm.Details
1st floor: add 490 sf liv sp w/connecting stair, add fam rm w/bar sink, new bath, new fire rated exit corridor, repalce new rear windows, excavate, new slab, underpin footing. 2nd fl: new stair to 1st fl, infill lightwell in kitchen, remodel kitchen, remove (e)stair, infill floor,remodel laundry rm. | $150,000 |
| Sep 23, 2014 | Completed final sign-off Nov 2014 | 1371 06th Av | 2nd flr master bathroom and half-bath renovation. demo (e) interior walls, frame (2) pocket doors. utilities rough-ins. insulate, gypsum, install tub, tile walls and floor. install (2) operable lightwell ceiling windows. cabinetry and window casingDetails
2nd flr master bathroom and half-bath renovation. demo (e) interior walls, frame (2) pocket doors. utilities rough-ins. insulate, gypsum, install tub, tile walls and floor. install (2) operable lightwell ceiling windows. cabinetry and window casing | $100,000 |