Thomas K. Deely
- Based in
- San Francisco
- On San Francisco permits
- Sep 2004 to Dec 2017
- Last 24 months
- 0 permits filed
13 permits since 2000: 13 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 15, 2017 | Completed final sign-off Apr 2018 | 2040 Fell St | to comply with nov #201701031, replace two post as noted. post at rear stairs. maher naDetails
to comply with nov #201701031, replace two post as noted. post at rear stairs. maher na | $2,000 |
| Aug 30, 2016 | Completed final sign-off Jan 2017 | 1321 Columbus Av | remove plaster/sheetrock in garage walls. install blocking as needed. install 1/2in plywood sheathing, 4in o/c nailing in permiter, 12in o/c in field. install new 5/8in sheet rock/plaster. finish to match (e) type x.Details
remove plaster/sheetrock in garage walls. install blocking as needed. install 1/2in plywood sheathing, 4in o/c nailing in permiter, 12in o/c in field. install new 5/8in sheet rock/plaster. finish to match (e) type x. | $3,200 |
| Jun 5, 2014 | Completed final sign-off Jul 2015 | 711 03rd Av | remodel kitchen and bathroom on 2nd floor. addition of new rear deck and stairway.Details
remodel kitchen and bathroom on 2nd floor. addition of new rear deck and stairway. | $18,000 |
| Oct 29, 2012 | Completed final sign-off Dec 2012 | 1321 Columbus Av | remove and repair dry rot of wood joists framing. install replacement sheet rock on ground floor hallway appox 6 sq ft, plus opening ceiling access from garage and patch back to original after repair. maintain min 1 hour construction.Details
remove and repair dry rot of wood joists framing. install replacement sheet rock on ground floor hallway appox 6 sq ft, plus opening ceiling access from garage and patch back to original after repair. maintain min 1 hour construction. | $3,660 |
| Jun 28, 2011 | Completed final sign-off Aug 2011 | 650 Lombard St | removal of old kitchen cab & replace with 7 new cabs & countertop. no change to walls, window or door or ceilings lighting to comply to cec 150 (k)Details
removal of old kitchen cab & replace with 7 new cabs & countertop. no change to walls, window or door or ceilings lighting to comply to cec 150 (k) | $9,240 |
| Apr 10, 2009 | Completed final sign-off Jul 2009 | 1861 Powell St | remove & replace (1) kitchen cabinets, sink, counter. replace (1) toilet, tub in bathroom, no change to lighting or wall finishes.Details
remove & replace (1) kitchen cabinets, sink, counter. replace (1) toilet, tub in bathroom, no change to lighting or wall finishes. | $8,000 |
| Sep 17, 2008 | Completed final sign-off Jan 2009 | 149 Gough St | remove damaged sheetrock on wall and ceiling. finish to match (e). south wall floor at bath room door & ceiling above approximate 224 sqft. replace in kind.Details
remove damaged sheetrock on wall and ceiling. finish to match (e). south wall floor at bath room door & ceiling above approximate 224 sqft. replace in kind. | $2,840 |
| May 19, 2008 | Completed final sign-off Jun 2008 | 650 Lombard St | install 4 kitchen cabinets trim out addition @ existing kitchen @ new area of kitchen.Details
install 4 kitchen cabinets trim out addition @ existing kitchen @ new area of kitchen. | $600 |
| Mar 24, 2008 | Completed final sign-off Apr 2008 | 47 Walter St | revision to pa# 2007/08/20/0277 to delete proposed propertyline window enlargement and infill ex. kitchen windowDetails
revision to pa# 2007/08/20/0277 to delete proposed propertyline window enlargement and infill ex. kitchen window | $300 |
| Aug 20, 2007 | Completed final sign-off Apr 2008 | 47 Walter St | ground floor unit #47 - install new kitchen cabinets, install new property line window (replaced old one) different size and location, install new bath with shower, toilet, & vanity, install new lighting in kitchen and bath.Details
ground floor unit #47 - install new kitchen cabinets, install new property line window (replaced old one) different size and location, install new bath with shower, toilet, & vanity, install new lighting in kitchen and bath. | $40,000 |
| May 30, 2007 | Completed final sign-off Dec 2007 | 43 Walter St | work in 47 walter. remove cabinets, plate lathe off kitchen walls explore only. no structural or lighting changes.Details
work in 47 walter. remove cabinets, plate lathe off kitchen walls explore only. no structural or lighting changes. | $5,000 |
| Jun 1, 2005 | Completed final sign-off Jun 2005 | 764 Green St | correct nov 200559689 on 5/5/05. replace rotted stairs,risers,handrails. replace in kind.Details
correct nov 200559689 on 5/5/05. replace rotted stairs,risers,handrails. replace in kind. | $4,640 |
| Sep 28, 2004 | Completed final sign-off Dec 2004 | 1321 Columbus Av | repair damaged garage walls, new stucco, patch where needed. unit 24Details
repair damaged garage walls, new stucco, patch where needed. unit 24 | $5,100 |