The Kgb Digital System Services Llc
- Based in
- San Jose
- On San Francisco permits
- Sep 2025 to Nov 2025
- Last 24 months
- 2 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 4, 2025 | Completed final sign-off Nov 2025 | 2935 Pacific Av | correction of sequence of operation matrix to change detectors to supervisory instead of alarm causing as-built for permit 202509115073Details
correction of sequence of operation matrix to change detectors to supervisory instead of alarm causing as-built for permit 202509115073 | $20,000 |
| Sep 11, 2025 | Completed final sign-off Nov 2025 | 2935 Pacific Av | sprinkler monitoring system like for like repalcement. replace (e) fire alarm control panel, slc , devices, and nac devices on all five floorsDetails
sprinkler monitoring system like for like repalcement. replace (e) fire alarm control panel, slc , devices, and nac devices on all five floors | $20,000 |