The Appliance Repair Doctors Llc
- Based in
- Alameda
- On San Francisco permits
- Nov 2016 to Jan 2017
- Last 24 months
- 0 permits filed
2 permits since 2000: 1 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 9, 2017 | Never finaled issued Jan 2017, no final | 866 Pacheco St | install new furnace on unistrut trapeeze run electrical , gas, venting and duct work to new location. instal l per cmc 904.3 provide clearance per cmc 904.2 combustiion air per cmc ch.7 gas vent per cmc 802.6 & treminate 4ft from porperty lineDetails
install new furnace on unistrut trapeeze run electrical , gas, venting and duct work to new location. instal l per cmc 904.3 provide clearance per cmc 904.2 combustiion air per cmc ch.7 gas vent per cmc 802.6 & treminate 4ft from porperty line | $5,967 |
| Nov 30, 2016 | Completed final sign-off Apr 2017 | 1750 Lane St | install new sheet metal ducts to 5 (e) boots. run ducts from new plenum to boots. insulate with bubble wrap & seal per title 24.Details
install new sheet metal ducts to 5 (e) boots. run ducts from new plenum to boots. insulate with bubble wrap & seal per title 24. | $8,234 |