Tesseract Construction Inc
- Based in
- Castro Valley
- On San Francisco permits
- Jul 2019 to Aug 2019
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 2, 2019 | Completed final sign-off Nov 2019 | 74 Perine Pl | replace shingle siding at front elevation with horizontal pine sidingDetails
replace shingle siding at front elevation with horizontal pine siding | $20,000 |
| Jul 30, 2019 | Completed final sign-off Oct 2019 | 74 Perine Pl | replace one window at facade lower level with marvin integrity ultrex casement/fixed sash in existing opening. u:0.32maxDetails
replace one window at facade lower level with marvin integrity ultrex casement/fixed sash in existing opening. u:0.32max | $4,000 |