Templeman Builders
- Based in
- San Francisco
- On San Francisco permits
- Apr 2011 to May 2016
- Last 24 months
- 0 permits filed
27 permits since 2000: 18 completed, 5 never finaled, 4 expired or cancelled.
Of the 5 never-finaled permits, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 6, 2016 | Completed final sign-off Jul 2016 | 1302 Masonic Av | rear deck water damage repair. replacing members, like for like, which are damage by water exposure. not more than 25% of members to be replaced. work in common area.Details
rear deck water damage repair. replacing members, like for like, which are damage by water exposure. not more than 25% of members to be replaced. work in common area. | $5,000 |
| Apr 5, 2016 | Expired or cancelled expired Mar 2018 | 18 Romain St | revision to pa 2014-0224-9201, delete all habitable rooms at 1st floor and turn to storage. add door from storage to exit at stairs.Details
revision to pa 2014-0224-9201, delete all habitable rooms at 1st floor and turn to storage. add door from storage to exit at stairs. | |
| Feb 16, 2016 | Completed final sign-off May 2016 | 118 Midcrest Wy | revision to 201303051477; closing door between hall & kitchen on 2nd flr, and add kitchen & bath remodel; changing fixtures,devices,& fixtures, like for like without change of layout and locations.Details
revision to 201303051477; closing door between hall & kitchen on 2nd flr, and add kitchen & bath remodel; changing fixtures,devices,& fixtures, like for like without change of layout and locations. | |
| Dec 11, 2015 | Completed final sign-off Jun 2016 | 844 Clayton St | refresh two bathrooms, changing out fixts & finishes like for like, no other significant changes, replacing two windows like for like not facing street. no alteration of wall & door.Details
refresh two bathrooms, changing out fixts & finishes like for like, no other significant changes, replacing two windows like for like not facing street. no alteration of wall & door. | $28,000 |
| May 6, 2015 | Never finaled issued May 2015, no final | 633 Capp St | replacement of approximately a dozen treads & risers which are damaged, and the repair of two landings, deck and under structure. total replacement will be less than 50% in-kind replacement from existing. stair and landing is located at front facing street.Details
replacement of approximately a dozen treads & risers which are damaged, and the repair of two landings, deck and under structure. total replacement will be less than 50% in-kind replacement from existing. stair and landing is located at front facing street. | $4,500 |
| Mar 2, 2015 | Never finaled issued Mar 2015, no final | 787 Castro St | recommencement and completion of work approved under app#200408101176Details
recommencement and completion of work approved under app#200408101176 | $12,500 |
| Mar 2, 2015 | Completed final sign-off Jan 2016 | 787 Castro St | to obtain final inspection for work approved under app#201010193317. all work is complete.Details
to obtain final inspection for work approved under app#201010193317. all work is complete. | |
| Mar 2, 2015 | Never finaled issued Mar 2015, no final | 787 Castro St | recommencement and completion of work approved under app#200405285093Details
recommencement and completion of work approved under app#200405285093 | $12,500 |
| Mar 2, 2015 | Completed final sign-off Jan 2016 | 787 Castro St | to obtain final inspection for work approved under app#201105035272. all work is complete.Details
to obtain final inspection for work approved under app#201105035272. all work is complete. | |
| Mar 2, 2015 | Completed final sign-off Jan 2016 | 787 Castro St | to obtain final inspection for work approved under app#201105125893. all work is complete.Details
to obtain final inspection for work approved under app#201105125893. all work is complete. | |
| Mar 2, 2015 | Never finaled issued Mar 2015, no final | 787 Castro St | to obtain final inspection for work approved under app#200004217945. all work is complete.Details
to obtain final inspection for work approved under app#200004217945. all work is complete. | |
| Jan 26, 2015 | Completed final sign-off May 2015 | 300 03rd St | light remodel of kitchen and one full bath, replacing plumbing and electrical fixtures and finishes like for like, in their original locations. no change in openings and layout. all led lighting (all high efficacxy lightings).Details
light remodel of kitchen and one full bath, replacing plumbing and electrical fixtures and finishes like for like, in their original locations. no change in openings and layout. all led lighting (all high efficacxy lightings). | $5,000 |
| Sep 3, 2014 | Completed final sign-off Dec 2014 | 1380 San Bruno Av | to comply with physical inspection report #cc-7621Details
to comply with physical inspection report #cc-7621 | $2,000 |
| Aug 22, 2014 | Completed final sign-off Oct 2014 | 601 Van Ness Av | new floor to patch and refinish, tile @ kitchen floor and bath. new countertops @ kitchen and bath. new baseboards throughout installed, drywall patching & painting. no walls to be removed.Details
new floor to patch and refinish, tile @ kitchen floor and bath. new countertops @ kitchen and bath. new baseboards throughout installed, drywall patching & painting. no walls to be removed. | $2,500 |
| Aug 5, 2014 | Completed final sign-off Jun 2015 | 1302 Masonic Av | to obtain final inspection for work approved under pa# 201306119160. all work is complete.Details
to obtain final inspection for work approved under pa# 201306119160. all work is complete. | |
| Aug 5, 2014 | Completed final sign-off Jun 2015 | 1302 Masonic Av | to obtain final inspection for work approved under pa# 201104154214. all work is complete.Details
to obtain final inspection for work approved under pa# 201104154214. all work is complete. | |
| Jun 12, 2014 | Completed final sign-off Jul 2019 | 72 Uranus Tr | remove & replace like for like, tile flooring on existing roof deck w/new water proofing and drain connection.Details
remove & replace like for like, tile flooring on existing roof deck w/new water proofing and drain connection. | $4,500 |
| Mar 17, 2014 | Completed final sign-off Jun 2014 | 1625 Mcallister St | water damage repair - replace like for like, beam & postDetails
water damage repair - replace like for like, beam & post | $1,500 |
| Feb 24, 2014 | Expired or cancelled expired Mar 2018 | 18 Romain St | vertical addition. remodel 2nd fl & 1st fl. remodel 1st social rm & bathrm, remove/relocate kitchen, remodel 2nd fl bedrm, bathrm, kitchen, living rm. exterior deck, (n) 675 sf vertical addition to contain master bedroom and bathrm.Details
vertical addition. remodel 2nd fl & 1st fl. remodel 1st social rm & bathrm, remove/relocate kitchen, remodel 2nd fl bedrm, bathrm, kitchen, living rm. exterior deck, (n) 675 sf vertical addition to contain master bedroom and bathrm. | $200,000 |
| Jan 8, 2014 | Never finaled issued Jan 2014, no final | 443 Broderick St | to comply with physical inspection report #cc-7281. includes requested permission for kitchen remodel in units #445 & #447 (existing condition), finishes only "like for like" respecting original locations, and request for existing bathroom in #447. remodel done finishes only. like for like respectinDetails
to comply with physical inspection report #cc-7281. includes requested permission for kitchen remodel in units #445 & #447 (existing condition), finishes only "like for like" respecting original locations, and request for existing bathroom in #447. remodel done finishes only. like for like respectin | $5,000 |
| Dec 13, 2013 | Completed final sign-off May 2014 | 300 03rd St | remodel kitchen & bath. changing out fixtures & finishes, "like for like". footprint & locations remain the same. no architectural changes. some plumbing & electrical requiring permit.Details
remodel kitchen & bath. changing out fixtures & finishes, "like for like". footprint & locations remain the same. no architectural changes. some plumbing & electrical requiring permit. | $21,000 |
| Dec 4, 2013 | Completed final sign-off Feb 2014 | 286 Parnassus Av | per condo conversion physical inspection report #cc-7363.Details
per condo conversion physical inspection report #cc-7363. | $1,000 |
| Aug 5, 2013 | Completed final sign-off Sep 2013 | 157 Lexington St | to comply to condo conversion inspection #7282. add bollards @ garage, fire tape patch, enlarge attic access.Details
to comply to condo conversion inspection #7282. add bollards @ garage, fire tape patch, enlarge attic access. | $1,500 |
| Jun 11, 2013 | Completed final sign-off Jun 2014 | 1867 32nd Av | to obtain final inspection for work approved under pa#2012-0330-7238. all work is complete.Details
to obtain final inspection for work approved under pa#2012-0330-7238. all work is complete. | $13,000 |
| Jun 11, 2013 | Expired or cancelled expired Jun 2015 | 1302 Masonic Av | revision of drawings for app#201104154214. 2 changes: engineering specifications. and the addition of kitchen remodel, attic skylight, and moving attic partition walls.Details
revision of drawings for app#201104154214. 2 changes: engineering specifications. and the addition of kitchen remodel, attic skylight, and moving attic partition walls. | |
| Jul 31, 2012 | Completed final sign-off Nov 2014 | 367 16th Av | new deck and stairs at rear yard.Details
new deck and stairs at rear yard. | $10,000 |
| Apr 15, 2011 | Expired or cancelled expired Jun 2015 | 1302 Masonic Av | remodel existing 3rd floor- add 1 bathroom, add partition walls, add 64 s.f. dormer in new bathroom.Details
remodel existing 3rd floor- add 1 bathroom, add partition walls, add 64 s.f. dormer in new bathroom. | $45,000 |