Tekton Design & Construction Corp.
- Based in
- Belmont
- On San Francisco permits
- Jun 2022 to Jan 2026
- Last 24 months
- 2 permits filed
3 permits since 2000: 2 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 29, 2026 | In progress issued Jan 2026 | 916 Kearny St | rev to pa# 2022-0629-7357: spec revision of fan coil units (ceiling casettes instead of wall casettes) spec revision of bath exhaust. use of (e) 2 hr shaft in suite 3 wih fire dumpersDetails
rev to pa# 2022-0629-7357: spec revision of fan coil units (ceiling casettes instead of wall casettes) spec revision of bath exhaust. use of (e) 2 hr shaft in suite 3 wih fire dumpers | |
| Dec 9, 2025 | In progress issued Dec 2025 | 916 Kearny St | revision to 202206297357: suite 1's shower & suite 3's shower converted to tub at 4th/f onlyDetails
revision to 202206297357: suite 1's shower & suite 3's shower converted to tub at 4th/f only | |
| Jun 29, 2022 | Never finaled issued Jul 2023, no final | 916 Kearny St | conversion of floors 3-6 from offie to tourist hotel rooms per pc motion 20773. restore basement path of travel; cosmetic changes to lobby; no exterior work building will operate as single tenant; existing dwelling unit to remain. mep deferred.Details
conversion of floors 3-6 from offie to tourist hotel rooms per pc motion 20773. restore basement path of travel; cosmetic changes to lobby; no exterior work building will operate as single tenant; existing dwelling unit to remain. mep deferred. | $2,000,000 |