Teamwrkx Inc.
- Based in
- San Jose
- On San Francisco permits
- Jun 2006 to Jan 2016
- Last 24 months
- 0 permits filed
66 permits since 2000: 53 completed, 11 never finaled, 2 expired or cancelled.
Of the 11 never-finaled permits, 11 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 19, 2016 | Completed final sign-off Apr 2016 | 55 Francisco St | 6th flr: barrier removal. project for restroom. ada upgrades (disabled access upgrades) and (n) finishes/fixtures.; maher n/aDetails
6th flr: barrier removal. project for restroom. ada upgrades (disabled access upgrades) and (n) finishes/fixtures.; maher n/a | $137,000 |
| Jan 19, 2016 | Completed final sign-off Apr 2016 | 55 Francisco St | 7th flr: barrier removal project for restroom ada (disabled access) and new finishes/fixtures; maher n/aDetails
7th flr: barrier removal project for restroom ada (disabled access) and new finishes/fixtures; maher n/a | $137,000 |
| Nov 19, 2015 | Completed final sign-off Jan 2016 | 499 Illinois St | 3rd floor: scope of work includes t.i. in an extg 6 story bldg. including relocation of an extg door and infill at demo area and associated finishes. work also includes mechanical and electrical improvements. compliance with maher ordinance no 155-13 not required.Details
3rd floor: scope of work includes t.i. in an extg 6 story bldg. including relocation of an extg door and infill at demo area and associated finishes. work also includes mechanical and electrical improvements. compliance with maher ordinance no 155-13 not required. | $60,000 |
| Oct 23, 2015 | Completed final sign-off Feb 2016 | 4406 18th St | revision to 201506128888 and app#201406279797. change per sfdph mandated exhaust fan. remove extg sink and install new sink using extg plumbing.Details
revision to 201506128888 and app#201406279797. change per sfdph mandated exhaust fan. remove extg sink and install new sink using extg plumbing. | $4,500 |
| Jun 4, 2015 | Completed final sign-off Feb 2016 | 55 Francisco St | new ceiling height partitions, power/data, millwork, doors, frames, hardware and finishes throughout. new ada showers in scope as well. n/a for maher.Details
new ceiling height partitions, power/data, millwork, doors, frames, hardware and finishes throughout. new ada showers in scope as well. n/a for maher. | $279,504 |
| May 20, 2015 | Completed final sign-off Dec 2015 | 201 Spear St | 10/f: revision to 201504032758. interior remodel, new walls, doors, glass partitions, walls and floor finishes, ceiling. sprinklers, fire alarm, mech & elec on sep permit. compliance with maher ordinance no 155-13 not required.Details
10/f: revision to 201504032758. interior remodel, new walls, doors, glass partitions, walls and floor finishes, ceiling. sprinklers, fire alarm, mech & elec on sep permit. compliance with maher ordinance no 155-13 not required. | $14,500 |
| Apr 3, 2015 | Completed final sign-off Nov 2017 | 201 Spear St | tenant improvement 13th fl demo of e offices, conference rooms. installation of millwork and fixtures and finishes. new walls and doors. ceiling to remain existing, new and relocate lights. elec and mechanical, plumbing sep permitDetails
tenant improvement 13th fl demo of e offices, conference rooms. installation of millwork and fixtures and finishes. new walls and doors. ceiling to remain existing, new and relocate lights. elec and mechanical, plumbing sep permit | $124,088 |
| Apr 3, 2015 | Completed final sign-off Dec 2015 | 201 Spear St | revision to 201410158952. interior wall reconfiguration. mech, electrical under sep permit.Details
revision to 201410158952. interior wall reconfiguration. mech, electrical under sep permit. | |
| Jan 21, 2015 | Completed final sign-off Nov 2017 | 201 Spear St | revision to 201410158954. partial demo of offices, installation of new millwork, new finishes throughout space, floor and walls, ada upgrade at restrooms. mech, elec, plumbing sep permitDetails
revision to 201410158954. partial demo of offices, installation of new millwork, new finishes throughout space, floor and walls, ada upgrade at restrooms. mech, elec, plumbing sep permit | $51,556 |
| Dec 22, 2014 | Completed final sign-off Feb 2016 | 55 Francisco St | 1st fl barrier removal for restroom. ada upgrade and new finishes/fixtures. compliance with maher ordinance no 155-13.Details
1st fl barrier removal for restroom. ada upgrade and new finishes/fixtures. compliance with maher ordinance no 155-13. | $66,570 |
| Dec 22, 2014 | Completed final sign-off Feb 2016 | 55 Francisco St | 3rd fl: barrier removal for restroom. ada upgrade and new finishes/fixtures. maher not reqDetails
3rd fl: barrier removal for restroom. ada upgrade and new finishes/fixtures. maher not req | $97,903 |
| Nov 19, 2014 | Completed final sign-off Nov 2017 | 201 Spear St | install new led 2x4 fixtures throughout the 10th fl and partial parts of the 12th fl. install dimmable led pendent and downlights. add power to conference rooms and offices for this spec siteDetails
install new led 2x4 fixtures throughout the 10th fl and partial parts of the 12th fl. install dimmable led pendent and downlights. add power to conference rooms and offices for this spec site | $260,000 |
| Oct 15, 2014 | Completed final sign-off Nov 2017 | 201 Spear St | 10th flr: tenant improvement include corridors, wall, & new partitions, doors & ceiling & lighting, restrooms upgrade & elevator lobby of 10th flr, mech & elec under separate permit; maher n/aDetails
10th flr: tenant improvement include corridors, wall, & new partitions, doors & ceiling & lighting, restrooms upgrade & elevator lobby of 10th flr, mech & elec under separate permit; maher n/a | $500,000 |
| Oct 15, 2014 | Completed final sign-off Feb 2018 | 201 Spear St | 12th flr: ab-017 no occupancy. minor tenant improvement includes: demolition of offices & remodel of break room & floor covering, install new millwork & finishes (mech & elec under separate permit) maher n/aDetails
12th flr: ab-017 no occupancy. minor tenant improvement includes: demolition of offices & remodel of break room & floor covering, install new millwork & finishes (mech & elec under separate permit) maher n/a | $95,500 |
| Sep 23, 2014 | Completed final sign-off Oct 2014 | 655 Montgomery St | demolition of partitons, millwork and associated electrical and plumbing and ceiling work. space is currently unoccupied. path of travel not required per ab-017Details
demolition of partitons, millwork and associated electrical and plumbing and ceiling work. space is currently unoccupied. path of travel not required per ab-017 | $20,000 |
| Aug 21, 2014 | Completed final sign-off Sep 2014 | 655 Montgomery St | 9th floor - project consist demolition of select partitoin, millwork, & associated electrical, plumbing & ceiling. construction of one conference room & one office. the spac eis currently unoccupied. mep, life safety & sprinkler system are not involved in this permit.Details
9th floor - project consist demolition of select partitoin, millwork, & associated electrical, plumbing & ceiling. construction of one conference room & one office. the spac eis currently unoccupied. mep, life safety & sprinkler system are not involved in this permit. | $95,000 |
| Aug 29, 2013 | Never finaled issued Sep 2013, no final | 655 Montgomery St | 4/f- t.i. from shell condition including non-load bearing partitions, doors, frames, interior glazing, casework, lighting, oiling grid, mech, electrical, plumbing included. life safety & sprinkler to be designed build.Details
4/f- t.i. from shell condition including non-load bearing partitions, doors, frames, interior glazing, casework, lighting, oiling grid, mech, electrical, plumbing included. life safety & sprinkler to be designed build. | $1,188,550 |
| Jun 5, 2013 | Never finaled issued Jun 2013, no final | 655 Montgomery St | new electrical and reowrk hvac 16th fl ref 201305207413Details
new electrical and reowrk hvac 16th fl ref 201305207413 | $42,000 |
| May 30, 2013 | Completed final sign-off Aug 2013 | 655 Montgomery St | suite 1150: ti to e suite 1150 for new wall (non load bearing) new doors and glazing, new elec, relocate lighting, e ceiling, hvac and life safety to be modified by d/b contractor under separate permitDetails
suite 1150: ti to e suite 1150 for new wall (non load bearing) new doors and glazing, new elec, relocate lighting, e ceiling, hvac and life safety to be modified by d/b contractor under separate permit | $366,000 |
| May 24, 2013 | Completed final sign-off Aug 2013 | 655 Montgomery St | the 18th floor upgrades rest room that involves barrier removal full accessible compliance. work involves demolition of fixture and installation of new accessible toilet partitions, accessories, fixtures and finishes. mep work will be under separated permits by design build sub contractors.Details
the 18th floor upgrades rest room that involves barrier removal full accessible compliance. work involves demolition of fixture and installation of new accessible toilet partitions, accessories, fixtures and finishes. mep work will be under separated permits by design build sub contractors. | $25,000 |
| May 20, 2013 | Never finaled issued May 2013, no final | 655 Montgomery St | 16th floor suite 1600 - tenant improvement to include demolition, new partitions, new ceiling tiles, new millwork & new finishes throughout. mep, sprinklers and fire alarm. core of building is under 201305207300.Details
16th floor suite 1600 - tenant improvement to include demolition, new partitions, new ceiling tiles, new millwork & new finishes throughout. mep, sprinklers and fire alarm. core of building is under 201305207300. | $281,000 |
| May 20, 2013 | Never finaled issued May 2013, no final | 655 Montgomery St | build multi tenant corridor incl. walls, doors, frames , lighting, finishes. elec, mech, fire life safety to be design/build and submitted seperately.Details
build multi tenant corridor incl. walls, doors, frames , lighting, finishes. elec, mech, fire life safety to be design/build and submitted seperately. | $120,000 |
| May 9, 2013 | Never finaled issued Jan 2014, no final | 655 Montgomery St | hc accessible stall striping and signage on pkg level 2.Details
hc accessible stall striping and signage on pkg level 2. | $2,500 |
| Mar 28, 2013 | Completed final sign-off Apr 2013 | 655 Montgomery St | 17/f: remodeling of extg office suite.Details
17/f: remodeling of extg office suite. | $14,800 |
| Feb 27, 2013 | Completed final sign-off Aug 2013 | 655 Montgomery St | suite # 1400:this project involves modification of extg t.i. space to spec suite condition, including selective demolition and construction of non load bearing partitions, new suspended ceiling grid and tile, new light fixtures new doors, frames and sidelights.fire sprinklers/fa seperate permit.Details
suite # 1400:this project involves modification of extg t.i. space to spec suite condition, including selective demolition and construction of non load bearing partitions, new suspended ceiling grid and tile, new light fixtures new doors, frames and sidelights.fire sprinklers/fa seperate permit. | $127,518 |
| Dec 5, 2012 | Completed final sign-off Feb 2013 | 655 Montgomery St | remove wall, lights, and tile. build 2 new offices, telephone closet and conference room. new lights, ceiling tile, carpet, paint. rework existing plumbing. mep under separate permit.Details
remove wall, lights, and tile. build 2 new offices, telephone closet and conference room. new lights, ceiling tile, carpet, paint. rework existing plumbing. mep under separate permit. | $150,000 |
| Aug 6, 2012 | Completed final sign-off Oct 2012 | 601 California St | 6th floor:demolition of partitions power & tel/data, millwork, finishes,new partitions, doors/frames, relocate light fixtures, new sink location.Details
6th floor:demolition of partitions power & tel/data, millwork, finishes,new partitions, doors/frames, relocate light fixtures, new sink location. | $90,000 |
| Mar 27, 2012 | Completed final sign-off May 2012 | 601 California St | 12th floor:demolition of partitions, power and tele data, new millwork finishes and door and frames. new non-structural partitions, doors and frames, millwork tele-data power, new dishwasher,light relocation.Details
12th floor:demolition of partitions, power and tele data, new millwork finishes and door and frames. new non-structural partitions, doors and frames, millwork tele-data power, new dishwasher,light relocation. | $90,000 |
| Mar 27, 2012 | Completed final sign-off May 2012 | 655 Montgomery St | minor tenant improvement to build 1 corner office,replace countertop, new outlets (220 sf) including doors, frames, glazing. elec,mech sep permit. new lighting and fire alarm separate permit. tenant space #1220; 12th floor.Details
minor tenant improvement to build 1 corner office,replace countertop, new outlets (220 sf) including doors, frames, glazing. elec,mech sep permit. new lighting and fire alarm separate permit. tenant space #1220; 12th floor. | $66,374 |
| Mar 19, 2012 | Completed final sign-off Apr 2012 | 225 Bush St | 11th floor demolition of some non-structural partitions & finishes. new partitions, glazing & doors. mech/elec to be submitted under spearate permit.Details
11th floor demolition of some non-structural partitions & finishes. new partitions, glazing & doors. mech/elec to be submitted under spearate permit. | $150,000 |
| Jan 9, 2012 | Never finaled issued Feb 2012, no final | 655 Montgomery St | 19th floor #1910 demo existing walls & build demising wall, install ceiling grid where needed, fire sprinkler, life safety alarm work will be under separate permit.Details
19th floor #1910 demo existing walls & build demising wall, install ceiling grid where needed, fire sprinkler, life safety alarm work will be under separate permit. | $56,000 |
| Dec 22, 2011 | Completed final sign-off Feb 2012 | 655 Montgomery St | unit#1720:demo ceiling and walls. build offices, kitchen and conference rooms. fire, sprinkler alarm work under separate permit.Details
unit#1720:demo ceiling and walls. build offices, kitchen and conference rooms. fire, sprinkler alarm work under separate permit. | $120,000 |
| Oct 6, 2011 | Completed final sign-off Dec 2011 | 601 California St | 15th floor-combine 2 suites into 1 suite-demo of office partitons, doors, teledata, receptacles & finishes. new partitions, doors, ceiling & finishes. no restroom work. 2 required exits shall be maintained during construction phase 1.Details
15th floor-combine 2 suites into 1 suite-demo of office partitons, doors, teledata, receptacles & finishes. new partitions, doors, ceiling & finishes. no restroom work. 2 required exits shall be maintained during construction phase 1. | $85,000 |
| Jun 7, 2011 | Never finaled issued Jun 2011, no final | 1270 Sanchez St | revision to 200812098151, new pier and grade beam foundation for steel momement frameDetails
revision to 200812098151, new pier and grade beam foundation for steel momement frame | $2,500 |
| May 6, 2011 | Completed final sign-off Jul 2011 | 601 California St | project consists of demolition of partitions, power & tele data, millwork, finishes and doors/frames. construction ofnew partitions door/frames, millwork, finishes, power and tele/data. space is currently unoccupied. mech,elec, & sprk system modification is under seperate permitDetails
project consists of demolition of partitions, power & tele data, millwork, finishes and doors/frames. construction ofnew partitions door/frames, millwork, finishes, power and tele/data. space is currently unoccupied. mech,elec, & sprk system modification is under seperate permit | $120,000 |
| May 6, 2011 | Completed final sign-off Jul 2011 | 601 California St | project consists of demolition of partitions, power & tele data, millwork, finishes and doors/frames. construction ofnew partitions door/frames, millwork, finishes, power and tele/data. space is currently unoccupied. mech,elec, & sprk system modification is under seperate permitDetails
project consists of demolition of partitions, power & tele data, millwork, finishes and doors/frames. construction ofnew partitions door/frames, millwork, finishes, power and tele/data. space is currently unoccupied. mech,elec, & sprk system modification is under seperate permit | $61,200 |
| Apr 19, 2011 | Never finaled issued Apr 2011, no final | 655 Montgomery St | 11th floor-demo walls, ceiling tiles & carpet. space to remain vacant per ab-017Details
11th floor-demo walls, ceiling tiles & carpet. space to remain vacant per ab-017 | $5,000 |
| Apr 19, 2011 | Never finaled issued Apr 2011, no final | 655 Montgomery St | 18th floor-demo walls, ceiling tiles & carpet. space to remain vacant per ab-017Details
18th floor-demo walls, ceiling tiles & carpet. space to remain vacant per ab-017 | $7,000 |
| Apr 19, 2011 | Completed final sign-off Feb 2012 | 655 Montgomery St | 17th floor-demo walls, ceiling tiles & carpet. space to remain vacant per ab-017Details
17th floor-demo walls, ceiling tiles & carpet. space to remain vacant per ab-017 | $1,200 |
| Dec 16, 2010 | Completed final sign-off Apr 2011 | 225 Bush St | demolition of existing non structural partitions outlets and ceiling panels. consturction of new interior partition, power and data, relocation of lights and finishesDetails
demolition of existing non structural partitions outlets and ceiling panels. consturction of new interior partition, power and data, relocation of lights and finishes | $88,000 |
| May 6, 2010 | Completed final sign-off Feb 2011 | 655 Montgomery St | 17th floor-this project includes demolition of (e) suite #1700 & construction of new offices & support spaces. mep under separate permit.Details
17th floor-this project includes demolition of (e) suite #1700 & construction of new offices & support spaces. mep under separate permit. | $440,262 |
| Feb 9, 2010 | Completed final sign-off Aug 2010 | 601 California St | 2nd floor-demo walls, carpet & vct. build corridor & offices. rework hvac, replace lights & relocate plumbingDetails
2nd floor-demo walls, carpet & vct. build corridor & offices. rework hvac, replace lights & relocate plumbing | $125,000 |
| May 15, 2009 | Completed final sign-off Jul 2009 | 2750 Van Ness Av | 2nd floor-demolition of (e) finishes & non-structural partitions. install new finishes, non-structural walls, upgrade of restrooms includes electrical, mechanical & plumbingDetails
2nd floor-demolition of (e) finishes & non-structural partitions. install new finishes, non-structural walls, upgrade of restrooms includes electrical, mechanical & plumbing | $96,626 |
| Mar 20, 2009 | Completed final sign-off Oct 2009 | 909 Montgomery St | renew pa# 2006/01/11/1921 to obtain final inspection. all work has been completed.Details
renew pa# 2006/01/11/1921 to obtain final inspection. all work has been completed. | |
| Oct 3, 2008 | Completed final sign-off Feb 2009 | 601 California St | tenant improvement on a multi-tenant floors, space is vacant, work consist, demo walls, construct new offices and plumbing to new location. mechanical, electric & sprinkler under separate permit.Details
tenant improvement on a multi-tenant floors, space is vacant, work consist, demo walls, construct new offices and plumbing to new location. mechanical, electric & sprinkler under separate permit. | $108,000 |
| Sep 11, 2008 | Completed final sign-off Dec 2008 | 717 Market St | office tenat improvement: demolition on non-structural partition, building new partition and ada compliant millwork. mep will be filed under separate permits.Details
office tenat improvement: demolition on non-structural partition, building new partition and ada compliant millwork. mep will be filed under separate permits. | $173,260 |
| May 2, 2008 | Expired or cancelled expired Mar 2010 | 60 Francisco St | revision to appl #200803247799 (ref #200803207577) - remove 2 private office layouts from plan to provide for larger yoga room, vault walls to remain (no door existing) added construction notes for lift.Details
revision to appl #200803247799 (ref #200803207577) - remove 2 private office layouts from plan to provide for larger yoga room, vault walls to remain (no door existing) added construction notes for lift. | |
| Mar 24, 2008 | Expired or cancelled expired Mar 2010 | 60 Francisco St | tenant improvement on a single floor (ground), space is currently unoccupied. mech, fire & demo under separate permit. two men & women's restrooms to remain, 2 new unisex retrooms, new partitions, staircase work & finishes.Details
tenant improvement on a single floor (ground), space is currently unoccupied. mech, fire & demo under separate permit. two men & women's restrooms to remain, 2 new unisex retrooms, new partitions, staircase work & finishes. | $86,000 |
| Mar 20, 2008 | Completed final sign-off May 2008 | 60 Francisco St | demolition on single tenant ground floor including partitions, stair & 2 existing single restrooms, const plan & m.e.p. under separate permit. tenant space is currently unoccupied.Details
demolition on single tenant ground floor including partitions, stair & 2 existing single restrooms, const plan & m.e.p. under separate permit. tenant space is currently unoccupied. | $565,000 |
| Feb 29, 2008 | Completed final sign-off Mar 2008 | 300 Montgomery St | 4th floor, suite 400: minor demo under grid & doors. replace carpet.Details
4th floor, suite 400: minor demo under grid & doors. replace carpet. | $5,000 |
| Sep 28, 2007 | Completed final sign-off Feb 2008 | 250 Montgomery St | demo accoustical ceiling corridor & replace 1 hour rated hard lid ceiling (lights, registers, sprinklers to remain untouched)Details
demo accoustical ceiling corridor & replace 1 hour rated hard lid ceiling (lights, registers, sprinklers to remain untouched) | $15,000 |
| Sep 19, 2007 | Completed final sign-off Dec 2007 | 250 Montgomery St | construct new non-rated partition walls for new office space. mechanical, electrical & fire safety will be done under separate permit. ref. pa # 200708301306 for demolition work. d. a. requirement under separate permit.Details
construct new non-rated partition walls for new office space. mechanical, electrical & fire safety will be done under separate permit. ref. pa # 200708301306 for demolition work. d. a. requirement under separate permit. | $110,000 |
| Sep 7, 2007 | Completed final sign-off Mar 2008 | 250 Montgomery St | recessed ceiling lights relocated. 1 sprinkler head relocated, carpet replaced. bldg directory relocated. security desk modified, relocated and made compliant. 1 storefront replaced, ext. finishes repaired/ replaced. remove barners and stone panels. add handrails mechanica wk under separate permit.Details
recessed ceiling lights relocated. 1 sprinkler head relocated, carpet replaced. bldg directory relocated. security desk modified, relocated and made compliant. 1 storefront replaced, ext. finishes repaired/ replaced. remove barners and stone panels. add handrails mechanica wk under separate permit. | $98,000 |
| Aug 30, 2007 | Completed final sign-off Dec 2007 | 250 Montgomery St | 2nd floor - demolition of approx. 100'-0" of undergrid walls, carpet & ceiling tile only. t.i. under separate permit. no exterior work.Details
2nd floor - demolition of approx. 100'-0" of undergrid walls, carpet & ceiling tile only. t.i. under separate permit. no exterior work. | $4,200 |
| Aug 8, 2007 | Completed final sign-off Mar 2008 | 250 Montgomery St | furnish and install new t-bar ceiling. m.e.p. under separate permitDetails
furnish and install new t-bar ceiling. m.e.p. under separate permit | $50,000 |
| Apr 27, 2007 | Never finaled issued Apr 2007, no final | 250 Montgomery St | 3rd floor - soft demo non structural partitions- removal 3rd floor.Details
3rd floor - soft demo non structural partitions- removal 3rd floor. | $10,000 |
| Apr 27, 2007 | Completed final sign-off Jul 2007 | 250 Montgomery St | soft demo non structural partitions- removal 15th floor.Details
soft demo non structural partitions- removal 15th floor. | $40,000 |
| Apr 26, 2007 | Completed final sign-off Jun 2007 | 250 Montgomery St | soft demo non structural partitions- removal 6th floor.Details
soft demo non structural partitions- removal 6th floor. | $10,000 |
| Apr 23, 2007 | Completed final sign-off Jul 2007 | 601 California St | 17th floor: interior tenant improvement (rework h.v.a.c./existing) mep only for pa#2007/03/06/5524.Details
17th floor: interior tenant improvement (rework h.v.a.c./existing) mep only for pa#2007/03/06/5524. | $7,000 |
| Feb 9, 2007 | Completed final sign-off May 2007 | 909 Montgomery St | demonstrate existing corridor wall as one-hour rated.Details
demonstrate existing corridor wall as one-hour rated. | |
| Feb 9, 2007 | Completed final sign-off Mar 2007 | 909 Montgomery St | demonstrate restroom wall to tenant space as existing to remain. change hardware on restroom doors to push/pull plate system.Details
demonstrate restroom wall to tenant space as existing to remain. change hardware on restroom doors to push/pull plate system. | $500 |
| Feb 9, 2007 | Completed final sign-off Mar 2007 | 909 Montgomery St | request hardship, add door operator control button, demonstrate existing corridor wall as one-hour rated.Details
request hardship, add door operator control button, demonstrate existing corridor wall as one-hour rated. | $9,000 |
| Nov 9, 2006 | Never finaled issued Nov 2006, no final | 821 Folsom St | hvac work-1st floor only.Details
hvac work-1st floor only. | $10,000 |
| Sep 18, 2006 | Completed final sign-off Mar 2007 | 909 Montgomery St | restroom upgrade: demolition, new construction, plumbing, electrical, lighting, finishesDetails
restroom upgrade: demolition, new construction, plumbing, electrical, lighting, finishes | $60,000 |
| Sep 18, 2006 | Completed final sign-off May 2007 | 909 Montgomery St | restroom upgrade: demolition, new construction, plumbing, electrical, lighting, finishesDetails
restroom upgrade: demolition, new construction, plumbing, electrical, lighting, finishes | $60,000 |
| Jun 5, 2006 | Completed final sign-off Nov 2006 | 821 Folsom St | tenant improvement to include new partitions for offices, toilets, conference rooms.Details
tenant improvement to include new partitions for offices, toilets, conference rooms. | $115,000 |