Tamalpais Glass
- Based in
- Vallejo
- On San Francisco permits
- Jan 2017 to Jan 2017
- Last 24 months
- 0 permits filed
1 permit since 2000: 1 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 30, 2017 | Completed final sign-off Dec 2019 | 3541 20th St | at first floor install new wood sash with obscured wire glass, change to hopper window, match existing muntin pattern. replace transom glass in existing transoms on first floor with wire glass. replace glass in two arched windows at second floor to aqualite tempered glass, retain sash. replace glassDetails
at first floor install new wood sash with obscured wire glass, change to hopper window, match existing muntin pattern. replace transom glass in existing transoms on first floor with wire glass. replace glass in two arched windows at second floor to aqualite tempered glass, retain sash. replace glass | $26,000 |