Taico Builder Inc
- Based in
- Daly City
- On San Francisco permits
- Sep 2013 to Mar 2026
- Last 24 months
- 1 permit filed
57 permits since 2000: 47 completed, 2 in progress, 6 never finaled, 2 expired or cancelled.
Of the 6 never-finaled permits, 1 is 3 to 5 years old, 3 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 2, 2026 | In progress issued Mar 2026 | 574 44th Av | revision to approved application # 202501178608 to eliminate new front door and relocate door inside (e) garage per plan.Details
revision to approved application # 202501178608 to eliminate new front door and relocate door inside (e) garage per plan. | |
| Sep 15, 2023 | In progress issued Oct 2023 | 574 44th Av | fire damage repairing to fix the damaged bathrooms, kitchen and rooms downstairs at 2nd & ground flrs. replace & upgrade all bldg, mep to current code. repair fire damaged roofing to current code in compliance of nov# 202309072.Details
fire damage repairing to fix the damaged bathrooms, kitchen and rooms downstairs at 2nd & ground flrs. replace & upgrade all bldg, mep to current code. repair fire damaged roofing to current code in compliance of nov# 202309072. | $220,000 |
| Jul 12, 2023 | Completed final sign-off Aug 2023 | 333 Monticello St | ref complaint # 202309806. repair exterior front wall dryrot, open stucco and replace the damaged wood structure. refinish stucco. 40 sq ftDetails
ref complaint # 202309806. repair exterior front wall dryrot, open stucco and replace the damaged wood structure. refinish stucco. 40 sq ft | $3,500 |
| Mar 15, 2023 | Completed final sign-off Oct 2023 | 2454 23rd Av | to comply with nov 202200710. legalize as-build laundry area in garage & utilities room on ground floor per plan. legalize two-burner range at utilites room with hood.Details
to comply with nov 202200710. legalize as-build laundry area in garage & utilities room on ground floor per plan. legalize two-burner range at utilites room with hood. | $8,000 |
| Feb 15, 2023 | Completed final sign-off Mar 2023 | 511 Lakeview Av | to obtain final inspection for work approved under pa# 202111192786. all work is complete.Details
to obtain final inspection for work approved under pa# 202111192786. all work is complete. | |
| Nov 8, 2022 | Completed final sign-off Nov 2023 | 2201 Irving St | ti open up existing non bearing wall to expand the existing supermarket. no change of exterior front or envelope.Details
ti open up existing non bearing wall to expand the existing supermarket. no change of exterior front or envelope. | $40,000 |
| Oct 4, 2022 | Completed final sign-off Jan 2025 | 4470 17th St | installing new fire sprinkler system @ the 1st fl & underground servicesDetails
installing new fire sprinkler system @ the 1st fl & underground services | $12,000 |
| Dec 23, 2021 | Completed final sign-off Aug 2023 | 895 34th Av | revision to pa# 2021-0218-4970; install additional sprinker heads to the rest of ground floor area, connect to (e) riserDetails
revision to pa# 2021-0218-4970; install additional sprinker heads to the rest of ground floor area, connect to (e) riser | $4,000 |
| Nov 19, 2021 | Never finaled issued Nov 2021, no final | 511 Lakeview Av | install 40 fire sprinklers throughout per nfpa13r & underground per nfpa24. ref pa 201612215539.Details
install 40 fire sprinklers throughout per nfpa13r & underground per nfpa24. ref pa 201612215539. | $20,000 |
| Aug 30, 2021 | Completed final sign-off Oct 2021 | 522 29th Av | revision to pa 2020-0808-1409 - underground piping from brazed fitting to viega propress fitting. as built.Details
revision to pa 2020-0808-1409 - underground piping from brazed fitting to viega propress fitting. as built. | |
| Feb 18, 2021 | Never finaled issued Mar 2021, no final | 895 34th Av | install new fire sprinkler system for new adu, egress pathway.Details
install new fire sprinkler system for new adu, egress pathway. | $11,000 |
| Aug 8, 2020 | Completed final sign-off Nov 2021 | 522 29th Av | new fire sprinkler system for ground floor adu & garage & hallway. refer to pa 201811095558 (adu).Details
new fire sprinkler system for ground floor adu & garage & hallway. refer to pa 201811095558 (adu). | $10,000 |
| Jan 16, 2020 | Completed final sign-off Jul 2020 | 756 Potrero Av | interior ground floor remodel with 2 bedrooms and full bathroom. add new deck on ground floor less then 10' high. change front windows in kind with aluminum clad.Details
interior ground floor remodel with 2 bedrooms and full bathroom. add new deck on ground floor less then 10' high. change front windows in kind with aluminum clad. | $48,000 |
| Dec 3, 2019 | Completed final sign-off Jul 2020 | 756 Potrero Av | propose new stair access from garage floor to 2nd floor. 2nd fl - remove wall to create open kitchen connect to dining area. no change of (e) bldg envelop and facadeDetails
propose new stair access from garage floor to 2nd floor. 2nd fl - remove wall to create open kitchen connect to dining area. no change of (e) bldg envelop and facade | $52,000 |
| Nov 13, 2019 | Completed final sign-off Jul 2020 | 756 Potrero Av | demo minimum sheerock to expose the stud & foumndation for site inspetoin by engineer & constractor. 150sf.Details
demo minimum sheerock to expose the stud & foumndation for site inspetoin by engineer & constractor. 150sf. | $8,000 |
| Nov 7, 2019 | Completed final sign-off Jan 2020 | 1275 08th Av | correct nov complaint #201994652. 1) repair the dry rot decking, stair and handrail < 50% 2) patch holes in the boiler room 3) remove the peeling paint and repaint on the exterior wall.Details
correct nov complaint #201994652. 1) repair the dry rot decking, stair and handrail < 50% 2) patch holes in the boiler room 3) remove the peeling paint and repaint on the exterior wall. | $8,000 |
| Jul 19, 2019 | Never finaled issued Jul 2019, no final | 1339 21st Av | install new sprinkler system throughout building per nfpa 13 2016 including 2 inch dedicated service undergroundDetails
install new sprinkler system throughout building per nfpa 13 2016 including 2 inch dedicated service underground | $5,000 |
| Jun 4, 2019 | Completed final sign-off Dec 2019 | 1582 19th Av | unit a: correct nov 201949817 & 201952521, 200556627, 201952461 & 201949817. repair flooring in kind, repair leaking bathroom, range outlet, refrigerator, cabinet door & panel. nov 201952521: tankless water heater install,new heating. nov 201952461: install dryer vent & repair guard rail w/ pt woodDetails
unit a: correct nov 201949817 & 201952521, 200556627, 201952461 & 201949817. repair flooring in kind, repair leaking bathroom, range outlet, refrigerator, cabinet door & panel. nov 201952521: tankless water heater install,new heating. nov 201952461: install dryer vent & repair guard rail w/ pt wood | $5,000 |
| May 8, 2019 | Completed final sign-off Apr 2021 | 206 Monterey Bl | front bldg: 1st flr - convert (e) storage space to (n) adu w/ 2 bedrooms, 2 full bathrooms, kitchen, living/dining area per ord# 162-16. 2nd flr - remodel bathroom, add a full bathroom, add a bedroom, relocate kitchen.Details
front bldg: 1st flr - convert (e) storage space to (n) adu w/ 2 bedrooms, 2 full bathrooms, kitchen, living/dining area per ord# 162-16. 2nd flr - remodel bathroom, add a full bathroom, add a bedroom, relocate kitchen. | $100,000 |
| Nov 14, 2018 | Completed final sign-off Dec 2018 | 1543 37th Av | kitchen remodel, replacing cabinets & granite counter top, appliances, & sink keep in hte same locationDetails
kitchen remodel, replacing cabinets & granite counter top, appliances, & sink keep in hte same location | $7,000 |
| Jun 20, 2018 | Completed final sign-off Jul 2018 | 2100 Noriega St | install new like-kind siding over (e) siding, 500 sq. ft. at rear of building.Details
install new like-kind siding over (e) siding, 500 sq. ft. at rear of building. | $5,000 |
| Feb 5, 2018 | Completed final sign-off Jun 2018 | 148 Venus St | 1st fl - remodel (e) storage space to 2 bedrooms, 2 new bathrooms and media roomDetails
1st fl - remodel (e) storage space to 2 bedrooms, 2 new bathrooms and media room | $48,000 |
| Jan 24, 2018 | Completed final sign-off Mar 2019 | 411 Ofarrell St | revision to 201603313666 ada restroom revision only maher naDetails
revision to 201603313666 ada restroom revision only maher na | |
| Jan 24, 2018 | Completed final sign-off Aug 2018 | 2368 03rd St | ti remodel of (e) restaurant, new glass partition walls at dining and new glass guardrail and general cleaning & maintenance. maher naDetails
ti remodel of (e) restaurant, new glass partition walls at dining and new glass guardrail and general cleaning & maintenance. maher na | $30,000 |
| Dec 22, 2017 | Completed final sign-off Oct 2018 | 411 Ofarrell St | new store front upgrade. maher n/aDetails
new store front upgrade. maher n/a | $20,000 |
| Oct 16, 2017 | Completed final sign-off Mar 2018 | 120 Saint Charles Av | 1st fl construct 2 new bedrooms, 2 new baths, new media room, hallway and relocate laundry and new exterior door at garageDetails
1st fl construct 2 new bedrooms, 2 new baths, new media room, hallway and relocate laundry and new exterior door at garage | $49,000 |
| Jul 5, 2017 | Completed final sign-off Dec 2017 | 1944 Ocean Av | remove (e) shelves, items and cabinets at break room/office. remove two cameras attached to exterior of 1948 ocean ave. no wall(structure) to be removed.Details
remove (e) shelves, items and cabinets at break room/office. remove two cameras attached to exterior of 1948 ocean ave. no wall(structure) to be removed. | $380 |
| Mar 24, 2017 | Completed final sign-off Jul 2017 | 52 Vesta St | remodel kitchenDetails
remodel kitchen | $8,500 |
| Feb 24, 2017 | Completed final sign-off Apr 2017 | 3007 19th Av | legalize e rooms at 1st fl including bedroom, bath, closets, family rm,Details
legalize e rooms at 1st fl including bedroom, bath, closets, family rm, | $60,000 |
| Feb 9, 2017 | Completed final sign-off Aug 2017 | 5320 Geary Bl | remove existing bar, replace with new cabinetry, plumbing, lighting, new door; (4) exhaust fans in bathroom.Details
remove existing bar, replace with new cabinetry, plumbing, lighting, new door; (4) exhaust fans in bathroom. | $19,000 |
| Dec 30, 2016 | Completed final sign-off Jul 2017 | 1646 36th Av | 1st floor: remodel (e) floor space for new bathrooms. home office, laundry and bedroomsDetails
1st floor: remodel (e) floor space for new bathrooms. home office, laundry and bedrooms | $60,000 |
| Nov 1, 2016 | Completed final sign-off Aug 2017 | 49 Kearny St | remove non-original aluminum storefront on storefront elevation on kearny st. replace with new steel storefront with two doors; maher n/aDetails
remove non-original aluminum storefront on storefront elevation on kearny st. replace with new steel storefront with two doors; maher n/a | $50,000 |
| Oct 7, 2016 | Never finaled issued Oct 2016, no final | 326 01st St | revision to 201505156452. reconfigure brewery and stair layout. no change to kitchen,restroom,entrance.Details
revision to 201505156452. reconfigure brewery and stair layout. no change to kitchen,restroom,entrance. | |
| Sep 20, 2016 | Expired or cancelled cancelled Oct 2022 | 323 Octavia St | tenant improvements for restaurant/micro brewery in new vacant 3700 sf space. compressed gas to be used. deferred submittals for gas, alarm, sprinkler and hood & duct suppression system.Details
tenant improvements for restaurant/micro brewery in new vacant 3700 sf space. compressed gas to be used. deferred submittals for gas, alarm, sprinkler and hood & duct suppression system. | $275,000 |
| Sep 19, 2016 | Completed final sign-off Mar 2017 | 1323 Columbus Av | revision to pa 2016-0212-9482 re-arrange shower stall & open 3'0" opening at 3rd floor. maher ord 155-13 naDetails
revision to pa 2016-0212-9482 re-arrange shower stall & open 3'0" opening at 3rd floor. maher ord 155-13 na | |
| Aug 12, 2016 | Completed final sign-off Jul 2017 | 266 Country Club Dr | comply w/ a complaint #201601152, convert a 2 story sfd back to previous permitted condition. demo unpermitted ptn walls and convert entire dwelling back to original permitted use. replace 2 front window in kind. remove sink in powder rm and remain (e) toilet. legalize (e) bdrm no.3 lower floor.Details
comply w/ a complaint #201601152, convert a 2 story sfd back to previous permitted condition. demo unpermitted ptn walls and convert entire dwelling back to original permitted use. replace 2 front window in kind. remove sink in powder rm and remain (e) toilet. legalize (e) bdrm no.3 lower floor. | $7,500 |
| Jul 28, 2016 | Completed final sign-off Dec 2016 | 4236 Lawton St | enclosed 3 exterior walls below (e) sunroomDetails
enclosed 3 exterior walls below (e) sunroom | $10,000 |
| Jul 20, 2016 | Completed final sign-off Oct 2017 | 49 Kearny St | revision to pa #201512013830 - revision to sheet a201 - show lighting notes on enlarged bathroom plan that refer to title 24 energy compliance. n/a maher ordinanceDetails
revision to pa #201512013830 - revision to sheet a201 - show lighting notes on enlarged bathroom plan that refer to title 24 energy compliance. n/a maher ordinance | |
| Jun 3, 2016 | Completed final sign-off Dec 2016 | 1351 35th Av | 1st fl construct new walls for new baths, bedroos, study, and home office. infill area under e bedroom for new bedroomDetails
1st fl construct new walls for new baths, bedroos, study, and home office. infill area under e bedroom for new bedroom | $49,000 |
| May 27, 2016 | Completed final sign-off Aug 2017 | 49 Kearny St | new tenant a1 (tea cafe/shop) @ ground flr. tenant a2 (yoga studio) in (e) vacant ground/basement. scope of work limited to interior only. improve e stair and under sidewalk area at basement. replace egress stair ground thru 2nd fl.replace mezz restroom. new elec to replace existingDetails
new tenant a1 (tea cafe/shop) @ ground flr. tenant a2 (yoga studio) in (e) vacant ground/basement. scope of work limited to interior only. improve e stair and under sidewalk area at basement. replace egress stair ground thru 2nd fl.replace mezz restroom. new elec to replace existing | $90,000 |
| May 18, 2016 | Expired or cancelled expired Apr 2023 | 1275 08th Av | seismic retrofit of soft story comply with sfbc 34b, mandatory seismic retrofit iebc a-4.Details
seismic retrofit of soft story comply with sfbc 34b, mandatory seismic retrofit iebc a-4. | $150,000 |
| Mar 31, 2016 | Completed final sign-off Mar 2019 | 411 Ofarrell St | to comply with nov 201254442: interior work only: remodel (e) hoste lobby on ground floor. relocate (e) ada restroom. voluntary upgrade of stair handrail from lobby to mezzanine level. fire/mep - under sep permit. remove atm machine from interior. other pa 2014-0912-6171 for related site. n/a maherDetails
to comply with nov 201254442: interior work only: remodel (e) hoste lobby on ground floor. relocate (e) ada restroom. voluntary upgrade of stair handrail from lobby to mezzanine level. fire/mep - under sep permit. remove atm machine from interior. other pa 2014-0912-6171 for related site. n/a maher | $100,000 |
| Mar 1, 2016 | Completed final sign-off May 2016 | 279 Montana St | kitchen remodel on second floor. sink, stove all at the same location. no change to walls, doors and openings. no structural work.Details
kitchen remodel on second floor. sink, stove all at the same location. no change to walls, doors and openings. no structural work. | $8,000 |
| Feb 12, 2016 | Completed final sign-off Mar 2017 | 1323 Columbus Av | comply with complaint #201555981 (under 201507302895), add ada shower to existing bathroom & relocate (e) lounge counter with sink in kind at third level office space.n/a for maherDetails
comply with complaint #201555981 (under 201507302895), add ada shower to existing bathroom & relocate (e) lounge counter with sink in kind at third level office space.n/a for maher | $12,000 |
| Jan 6, 2016 | Completed final sign-off May 2016 | 528 Divisadero St | remove extg tile in 2 restroom, tile 2 restroom. repair and patch extg holes in ceiling. repair and replace extg tile in dining room floor. replace extg can lights with 2 new led strip.Details
remove extg tile in 2 restroom, tile 2 restroom. repair and patch extg holes in ceiling. repair and replace extg tile in dining room floor. replace extg can lights with 2 new led strip. | $26,000 |
| Dec 4, 2015 | Completed final sign-off Apr 2016 | 250 Kearny St | pafor public health review, job card applicatoin #201511303771. repair existing kitchen floor to meet dph requirement. add 2(n) floor drains per dph. add 2 (n) floor sinks per dph.Details
pafor public health review, job card applicatoin #201511303771. repair existing kitchen floor to meet dph requirement. add 2(n) floor drains per dph. add 2 (n) floor sinks per dph. | |
| Dec 1, 2015 | Completed final sign-off Aug 2017 | 49 Kearny St | category a historic building: scope of work limited to interior floors 3 thru 8. provide accessible restroom at floors 3 thru 8. upgrade electrical on all (3-8) floors to replace existing. remove carpet and misc. finishes & replace and demolish partial height cubicle walls; maher n/aDetails
category a historic building: scope of work limited to interior floors 3 thru 8. provide accessible restroom at floors 3 thru 8. upgrade electrical on all (3-8) floors to replace existing. remove carpet and misc. finishes & replace and demolish partial height cubicle walls; maher n/a | $69,000 |
| Nov 30, 2015 | Completed final sign-off Apr 2016 | 250 Kearny St | 88 hardie pl: repair kitchen floor finishes approx 900sf to meet dph requirement. and add 2 new floor drains & 2 floor sinks.Details
88 hardie pl: repair kitchen floor finishes approx 900sf to meet dph requirement. and add 2 new floor drains & 2 floor sinks. | $31,000 |
| Oct 20, 2015 | Completed final sign-off Feb 2016 | 8045 Geary Bl | to comply with nov 201553661: remove and replace (e) steel lintels at affected garage door openings & windows, work will also include the repair of (e) stucco and brick facade. work will take place on 3 sides of the bldg.Details
to comply with nov 201553661: remove and replace (e) steel lintels at affected garage door openings & windows, work will also include the repair of (e) stucco and brick facade. work will take place on 3 sides of the bldg. | $30,000 |
| Oct 8, 2015 | Completed final sign-off Nov 2015 | 26 Pretor Wy | remodel 1 bathroom; replace vanity/sink & re-tile (e) shower. exaust fan to remain new led on flourescent lite.Details
remodel 1 bathroom; replace vanity/sink & re-tile (e) shower. exaust fan to remain new led on flourescent lite. | $4,200 |
| Aug 18, 2015 | Completed final sign-off Sep 2015 | 2075 Sutter St | unit 527: remodel two (e) bathrooms. new tile on bathroom floors and in (1) shower. new vanity, light, sink, faucets. no change to current toilets. includes new exhause fans, towell bars and mirrors. no structural work.Details
unit 527: remodel two (e) bathrooms. new tile on bathroom floors and in (1) shower. new vanity, light, sink, faucets. no change to current toilets. includes new exhause fans, towell bars and mirrors. no structural work. | $12,000 |
| Jul 23, 2015 | Completed final sign-off Oct 2015 | 713 Clay St | revision & addition to pa #2015.0512.6030: new dumbwaiter between 1st floor & basement, new footing for hoistway. n/a maher ordinanceDetails
revision & addition to pa #2015.0512.6030: new dumbwaiter between 1st floor & basement, new footing for hoistway. n/a maher ordinance | $40,000 |
| Jul 22, 2015 | Completed final sign-off May 2016 | 121 Marview Wy | 1st floor: construct new wall for new bathrooms, bedrooms, and family. 2nd floor: remodel extg kitchen and bathrooms, remove wall and install new beam and posts. new light fixtures and outlets. replace 3 front windows with alum. cladded window. replace rear window.Details
1st floor: construct new wall for new bathrooms, bedrooms, and family. 2nd floor: remodel extg kitchen and bathrooms, remove wall and install new beam and posts. new light fixtures and outlets. replace 3 front windows with alum. cladded window. replace rear window. | $49,000 |
| Jun 1, 2015 | Never finaled issued Jun 2015, no final | 196 Urbano Dr | 2nd floor remodel (e) master closet and bath. new skylights at master closet and bath. remdoel (e) bath no. 2, closet and study room. new 3 windows at master bath, bath #2 and master closet. window not visible from street.Details
2nd floor remodel (e) master closet and bath. new skylights at master closet and bath. remdoel (e) bath no. 2, closet and study room. new 3 windows at master bath, bath #2 and master closet. window not visible from street. | $48,000 |
| May 28, 2015 | Completed final sign-off Oct 2015 | 2330 33rd Av | kitchen remodel. new 100amp panel. no wall modification/no structural work.Details
kitchen remodel. new 100amp panel. no wall modification/no structural work. | $6,000 |
| May 15, 2015 | Never finaled issued Sep 2015, no final | 326 01st St | remodel (e) bar to accessory brewery with utility roof area per plan.Details
remodel (e) bar to accessory brewery with utility roof area per plan. | $195,000 |
| Sep 27, 2013 | Completed final sign-off May 2014 | 1534 Fillmore St | t.i on (e) jazz club venue. remodel of (e) bar, new fixed seating arrangement. new bar & new seating on 2nd floor. partial floor remodel of (e) bathroomDetails
t.i on (e) jazz club venue. remodel of (e) bar, new fixed seating arrangement. new bar & new seating on 2nd floor. partial floor remodel of (e) bathroom | $85,000 |