Tadek Constructions
- Based in
- Livermore
- On San Francisco permits
- Jul 2021 to Sep 2026
- Last 24 months
- 9 permits filed
29 permits since 2000: 23 completed, 2 in progress, 4 never finaled.
Of the 4 never-finaled permits, 3 are 3 to 5 years old, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 11, 2026 | In progress issued Sep 2026 | 2145 Larkin St | unit#10: reference to #202608035970 replace venthood, new dishwasher, new garbage disposal, replace ranges/cooktop, bathroom-replace shower surround in kind, raise shower head.Details
unit#10: reference to #202608035970 replace venthood, new dishwasher, new garbage disposal, replace ranges/cooktop, bathroom-replace shower surround in kind, raise shower head. | $18,000 |
| Aug 3, 2026 | In progress issued Aug 2026 | 2145 Larkin St | unit 10: kitchen remodel in kind. replace (2) outlets w/ gfci, replace faucet, replace cabinets, replace countertop, replace flooring, paint.Details
unit 10: kitchen remodel in kind. replace (2) outlets w/ gfci, replace faucet, replace cabinets, replace countertop, replace flooring, paint. | $17,800 |
| Oct 1, 2025 | Completed final sign-off Sep 2026 | 2230 Pacific Av | unit #101: bathroom face lift in kind, shower, tub, vanity, and toilet. plumbing stays the same and no wall changes. replace tile, new paint, and change light.Details
unit #101: bathroom face lift in kind, shower, tub, vanity, and toilet. plumbing stays the same and no wall changes. replace tile, new paint, and change light. | $9,800 |
| Sep 8, 2025 | Completed final sign-off Oct 2025 | 1373 Clay St | unit 8: partial remodel in kitchen and bathroom. kitchen: countertop, sink and faucet replace light fixture, replace tile floor in kind. bathrooom: replace tile floor in kind. paint throughout.Details
unit 8: partial remodel in kitchen and bathroom. kitchen: countertop, sink and faucet replace light fixture, replace tile floor in kind. bathrooom: replace tile floor in kind. paint throughout. | $8,000 |
| Jun 6, 2025 | Completed final sign-off Jul 2025 | 3245 Clay St | #8: bathroom upgrade, kitchen counters, paint cabinets, new kitchen floor, bathroom paint throughout. new vanity bathroom,upgrade laundry plumbing. new lights (like for like).Details
#8: bathroom upgrade, kitchen counters, paint cabinets, new kitchen floor, bathroom paint throughout. new vanity bathroom,upgrade laundry plumbing. new lights (like for like). | $19,500 |
| Mar 4, 2025 | Completed final sign-off Mar 2025 | 3245 Clay St | apt 4: new flooring kitchen, bathroom, new vanity bath, new counters kitchen, new lights throughout by replacing original lights, update laundry room plumbing & electrical, paint throughout.Details
apt 4: new flooring kitchen, bathroom, new vanity bath, new counters kitchen, new lights throughout by replacing original lights, update laundry room plumbing & electrical, paint throughout. | $29,000 |
| Jan 7, 2025 | Completed final sign-off Mar 2025 | 3245 Clay St | apt 5: refinish inkind: new tile @ floor kitchen, laundry storage, paiting kitchen cabinets. replacement of lights throughout apartment, new countertop @ kitchen sink. new vanity & medicine cabinet in bathroom, paint full unit, plumbing, luandry & bathroom, kitchen to reinstall new sink.Details
apt 5: refinish inkind: new tile @ floor kitchen, laundry storage, paiting kitchen cabinets. replacement of lights throughout apartment, new countertop @ kitchen sink. new vanity & medicine cabinet in bathroom, paint full unit, plumbing, luandry & bathroom, kitchen to reinstall new sink. | $49,800 |
| Nov 20, 2024 | Completed final sign-off Aug 2025 | 1396 Pacific Av | upgrade 1 bathrooms- like for like- no frame changes- tile, paint, vanity, light, toilet, and floorings.Details
upgrade 1 bathrooms- like for like- no frame changes- tile, paint, vanity, light, toilet, and floorings. | $18,000 |
| Oct 9, 2024 | Completed final sign-off Nov 2024 | 3245 Clay St | apt 2: refinish inkind: new tile @ floor kitchen, laundry storage, paiting kitchen cabinets. replacement of lights throughout apartment, new countertop @ kitchen sink. new vanity & medicine cabinet in bathroom, paint full unit, plumbing, luandry & bathroom, kitchen to reinstall new sink.Details
apt 2: refinish inkind: new tile @ floor kitchen, laundry storage, paiting kitchen cabinets. replacement of lights throughout apartment, new countertop @ kitchen sink. new vanity & medicine cabinet in bathroom, paint full unit, plumbing, luandry & bathroom, kitchen to reinstall new sink. | $19,800 |
| Aug 13, 2024 | Completed final sign-off Sep 2024 | 3245 Clay St | 8/f: unit 12: remodeling apt one kitchen and one bathroom. cabinets. new countertop, backsplash, new floor in 1 kitchen & 1 bathroom, 4 new light fixtures, 1 fan in bathroom. refinish floors.Details
8/f: unit 12: remodeling apt one kitchen and one bathroom. cabinets. new countertop, backsplash, new floor in 1 kitchen & 1 bathroom, 4 new light fixtures, 1 fan in bathroom. refinish floors. | $10,750 |
| Jan 5, 2023 | Completed final sign-off Feb 2023 | 530 Grove St | unit 2: code violation 202200528, change out galvanized water lines, replace with copper in kitchen & bath, replace sheetrock, gfci where needed, smoke detectorsDetails
unit 2: code violation 202200528, change out galvanized water lines, replace with copper in kitchen & bath, replace sheetrock, gfci where needed, smoke detectors | $2,300 |
| Sep 28, 2022 | Completed final sign-off Mar 2023 | 226 02nd Av | kitchen countertop replacement w/sink at unit 1. paint at hallways and touchup at units. 4 subpanels replacement (upgrade from pacific) at units 1-4. all work replace in kind, no change in floor layout, no structural work.Details
kitchen countertop replacement w/sink at unit 1. paint at hallways and touchup at units. 4 subpanels replacement (upgrade from pacific) at units 1-4. all work replace in kind, no change in floor layout, no structural work. | $3,000 |
| Sep 7, 2022 | Completed final sign-off Dec 2022 | 225 Lee Av | revision to permit 202205275180. convert den on plans to enclosed porch.Details
revision to permit 202205275180. convert den on plans to enclosed porch. | |
| Sep 2, 2022 | Completed final sign-off Nov 2022 | 225 Lee Av | siding repair at rear of building & area by bathroom windows; dryrot repair where needed; dry rot for stud replacement shall be not more than 3 pieces of stud, otherwise, drawing is required. all works are not visible from street & repair in-kind.Details
siding repair at rear of building & area by bathroom windows; dryrot repair where needed; dry rot for stud replacement shall be not more than 3 pieces of stud, otherwise, drawing is required. all works are not visible from street & repair in-kind. | $10,000 |
| Aug 22, 2022 | Completed final sign-off Dec 2022 | 2488 Sutter St | unit 2: bthroom remodel master bath. new vanity tub, shower new, lights, gfci: paint of kitchen cabinets, master bar wetbar next to master bath. no walls/layout changesDetails
unit 2: bthroom remodel master bath. new vanity tub, shower new, lights, gfci: paint of kitchen cabinets, master bar wetbar next to master bath. no walls/layout changes | $10,000 |
| Jul 5, 2022 | Never finaled issued Jul 2022, no final | 1787 Mcallister St | units 2 & 4: each unit: update bathroom: replace toilet, tub & vanity, tile surround and floor paint , back splash kitchen. no other changes to kitchen. install 1 gfci in bathroom. no other changes in bathrooms. this is for unit 2&4, total of 2 bathrooms.Details
units 2 & 4: each unit: update bathroom: replace toilet, tub & vanity, tile surround and floor paint , back splash kitchen. no other changes to kitchen. install 1 gfci in bathroom. no other changes in bathrooms. this is for unit 2&4, total of 2 bathrooms. | $9,000 |
| Jun 27, 2022 | Completed final sign-off Aug 2022 | 355 Christopher Dr | replace 2 front windows in-kind (60x60in) marvin ultimate aluminum-clad w/ slider of same size. replace (e) brick cladding at front of bldg. repair front wd. cladding.Details
replace 2 front windows in-kind (60x60in) marvin ultimate aluminum-clad w/ slider of same size. replace (e) brick cladding at front of bldg. repair front wd. cladding. | $5,000 |
| May 27, 2022 | Completed final sign-off Dec 2022 | 225 Lee Av | comply w/ nov 201319831 - int'r remodel lower & upper levels of (e) sfd; lr level: family rm w wet bar, 2 bdrm & bathrm;(e) garage & storage to remain; upper level: 2 bedrms, 2 baths, kit., lvng & dnng. new window construction & allt the rest. replace 12 window side/rear. rplace stucco & stairDetails
comply w/ nov 201319831 - int'r remodel lower & upper levels of (e) sfd; lr level: family rm w wet bar, 2 bdrm & bathrm;(e) garage & storage to remain; upper level: 2 bedrms, 2 baths, kit., lvng & dnng. new window construction & allt the rest. replace 12 window side/rear. rplace stucco & stair | $75,000 |
| Apr 14, 2022 | Completed final sign-off May 2022 | 481 Corbett Av | removal of bottom deck full dryrotted (not being used damaged to full) to comply with #201877151 #2.Details
removal of bottom deck full dryrotted (not being used damaged to full) to comply with #201877151 #2. | $2,000 |
| Apr 1, 2022 | Never finaled issued Apr 2022, no final | 1315 Clayton St | rev to pa202112144366.some electrical work due to deck in storage areas need to more wires.lower deck repair has changed from 50 to 80%.like for like.no change to current place. add dryrot repair.add light to hallway.1 wdw goes from retrofit to new construction due to propsed electric fix light.Details
rev to pa202112144366.some electrical work due to deck in storage areas need to more wires.lower deck repair has changed from 50 to 80%.like for like.no change to current place. add dryrot repair.add light to hallway.1 wdw goes from retrofit to new construction due to propsed electric fix light. | $3,000 |
| Feb 14, 2022 | Completed final sign-off Mar 2022 | 481 Corbett Av | repair middle and top deck. less than 50% each deck (not facing street)Details
repair middle and top deck. less than 50% each deck (not facing street) | $6,000 |
| Feb 8, 2022 | Completed final sign-off Dec 2023 | 159 04th Av | unit 1 & 4. install (n) kitchen, coutertop, 20 can light, gas stove, ventless vent, washer/dryer, update electrical panel, flooring, paint, replace vanity, toilet, lipht, tub, surround in ba. no plumming changes, new vent only. install gfci in bath & kitchen. no electrical & plumbing changes.Details
unit 1 & 4. install (n) kitchen, coutertop, 20 can light, gas stove, ventless vent, washer/dryer, update electrical panel, flooring, paint, replace vanity, toilet, lipht, tub, surround in ba. no plumming changes, new vent only. install gfci in bath & kitchen. no electrical & plumbing changes. | $41,000 |
| Feb 8, 2022 | Completed final sign-off Dec 2023 | 159 04th Av | unit 3 and 6: remodel of kitches, ventless vents, bathroom remodels tub/surround, vanities, toilets, floors, paint, upgrade subpanels, washer/dryer combo. like for like gas stove, 20 can lights each unit, vent replacement both gfci kitchen and bath. no wall or layout changes.Details
unit 3 and 6: remodel of kitches, ventless vents, bathroom remodels tub/surround, vanities, toilets, floors, paint, upgrade subpanels, washer/dryer combo. like for like gas stove, 20 can lights each unit, vent replacement both gfci kitchen and bath. no wall or layout changes. | $42,000 |
| Feb 8, 2022 | Completed final sign-off Dec 2023 | 159 04th Av | unit 2 and 5: kitchen remodel both units, 16 lights can each unit, ventless vent each unit, dishwasher each unit, shower and surround each unit, vent, vanity and toilet and tile floor each unit. paint and hardwood floor, washer/dryer combo each unit, gfci bath and kitchen, upgrade subpanel.Details
unit 2 and 5: kitchen remodel both units, 16 lights can each unit, ventless vent each unit, dishwasher each unit, shower and surround each unit, vent, vanity and toilet and tile floor each unit. paint and hardwood floor, washer/dryer combo each unit, gfci bath and kitchen, upgrade subpanel. | $36,000 |
| Feb 8, 2022 | Never finaled issued Feb 2022, no final | 159 04th Av | fire in garage. new garage door & motor to create panel look like prior. upgrade subpanels 50 to 100. replace wires burned due to fire in garage area. install painted wood panels under eaves. 1 paint garage insideDetails
fire in garage. new garage door & motor to create panel look like prior. upgrade subpanels 50 to 100. replace wires burned due to fire in garage area. install painted wood panels under eaves. 1 paint garage inside | $8,500 |
| Feb 8, 2022 | Completed final sign-off Mar 2022 | 635 17th Av | unit a: flooring, paint, kitchen remodel, bathroom remodel, fab/surround no plumbing changes, shower/surround in master; can lights, washer/dryer combo. gfci in bath and kitchen. floor in hallway entry.Details
unit a: flooring, paint, kitchen remodel, bathroom remodel, fab/surround no plumbing changes, shower/surround in master; can lights, washer/dryer combo. gfci in bath and kitchen. floor in hallway entry. | $32,000 |
| Feb 8, 2022 | Completed final sign-off Mar 2022 | 635 17th Av | unit b. kitchen remodel, 2 bath remodel, flooring, paint, can lights, washer/dryer combo, gfi in kitchen and bath.Details
unit b. kitchen remodel, 2 bath remodel, flooring, paint, can lights, washer/dryer combo, gfi in kitchen and bath. | $36,000 |
| Dec 14, 2021 | Completed final sign-off Aug 2022 | 1313 Clayton St | to comply with nov #200671472 nb siding replacememt on one side of bldg. lower deck repair (less than 50%). 4 retro fit patio doors replacement replacement. front aluminum or fiber glass. doors to be either aluminum or fiberglass in this case.Details
to comply with nov #200671472 nb siding replacememt on one side of bldg. lower deck repair (less than 50%). 4 retro fit patio doors replacement replacement. front aluminum or fiber glass. doors to be either aluminum or fiberglass in this case. | $21,000 |
| Jul 1, 2021 | Never finaled issued Jul 2021, no final | 159 04th Av | replacement 6 windows like for like retrofit install scaffold to do the work, u-factor 0.30 maxDetails
replacement 6 windows like for like retrofit install scaffold to do the work, u-factor 0.30 max | $5,000 |