Tabernus Service Company
- Based in
- Pittsburg
- On San Francisco permits
- Jul 2014 to May 2023
- Last 24 months
- 0 permits filed
47 permits since 2000: 43 completed, 4 never finaled.
Of the 4 never-finaled permits, 2 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 9, 2023 | Completed final sign-off Jul 2023 | 1439 De Haro St | r/r like for like exterior siding on the right exterior of the unit. (south wall) not visible to street.Details
r/r like for like exterior siding on the right exterior of the unit. (south wall) not visible to street. | $5,000 |
| May 20, 2021 | Completed final sign-off Nov 2021 | 2294 Filbert St | unit 5: kitchen and bathroom remodel. remove and replace like for like. plumbing under permit pw20210420683Details
unit 5: kitchen and bathroom remodel. remove and replace like for like. plumbing under permit pw20210420683 | $20,000 |
| Jul 22, 2020 | Completed final sign-off Jul 2020 | 2298 Filbert St | address correction from pa #202003137057 (2294 filbert st #2) to 2298 filbert st #2Details
address correction from pa #202003137057 (2294 filbert st #2) to 2298 filbert st #2 | |
| Jul 22, 2020 | Completed final sign-off Jul 2020 | 2298 Filbert St | apartment #2: replace 5 windows in back bedroom like for like. not facing the street.Details
apartment #2: replace 5 windows in back bedroom like for like. not facing the street. | $3,000 |
| Mar 13, 2020 | Completed final sign-off Jul 2020 | 747 Natoma St | remove and replace like for like (e) fire door on bottom level of building at street level.Details
remove and replace like for like (e) fire door on bottom level of building at street level. | $500 |
| Mar 13, 2020 | Never finaled issued Mar 2020, no final | 2294 Filbert St | unit #2: remove and replace like for like. kitchen and bathroom remodelDetails
unit #2: remove and replace like for like. kitchen and bathroom remodel | $20,000 |
| Dec 12, 2019 | Completed final sign-off Feb 2020 | 747 Natoma St | remove and replace two doors on rooftop, must be 90 minute rated doorsDetails
remove and replace two doors on rooftop, must be 90 minute rated doors | $1,000 |
| Oct 18, 2019 | Completed final sign-off Feb 2020 | 932 Greenwich St | remodel kitchen and bahtroom. remove and replace like for like. no wall alteration approx kitchen 10x12 and bathroom 5x8Details
remodel kitchen and bahtroom. remove and replace like for like. no wall alteration approx kitchen 10x12 and bathroom 5x8 | $20,000 |
| Mar 20, 2019 | Completed final sign-off Nov 2019 | 1530 California St | revision to pa 2017-0929-9946 - floor plan to remain. (n) wall per pg&3 to relocate electric metersDetails
revision to pa 2017-0929-9946 - floor plan to remain. (n) wall per pg&3 to relocate electric meters | |
| Dec 28, 2018 | Completed final sign-off Jul 2019 | 2294 Filbert St | kitchen (12x12) and 2 bathroom remodel (5x8 and 3x8). remove and replace like for like. remove (1) existing window & replace like for like. in living room, not visible from street.Details
kitchen (12x12) and 2 bathroom remodel (5x8 and 3x8). remove and replace like for like. remove (1) existing window & replace like for like. in living room, not visible from street. | $20,000 |
| Dec 28, 2018 | Completed final sign-off Dec 2019 | 990 Duncan St | bathroom remodel approximately 5x8 remove and replace like for like.Details
bathroom remodel approximately 5x8 remove and replace like for like. | $10,000 |
| Sep 21, 2018 | Completed final sign-off Oct 2018 | 813 Kansas St | replace in-kind less than 25% of the front and back stairs repair in-kind.Details
replace in-kind less than 25% of the front and back stairs repair in-kind. | $5,000 |
| Sep 17, 2018 | Completed final sign-off Dec 2018 | 566 Vallejo St | kitchen and bath remodel. remove and replace like for like.Details
kitchen and bath remodel. remove and replace like for like. | $45,000 |
| Aug 16, 2018 | Completed final sign-off Sep 2018 | 1520 California St | replace in like kind less than 25% of the back stairsDetails
replace in like kind less than 25% of the back stairs | $2,000 |
| Jun 25, 2018 | Completed final sign-off Jul 2018 | 2401 Post St | revision to #201609309302. equipment wall on roof surrounding exhaust fans to meet noise ordinance requirement.Details
revision to #201609309302. equipment wall on roof surrounding exhaust fans to meet noise ordinance requirement. | $1,500 |
| May 21, 2018 | Completed final sign-off Jul 2018 | 2401 Post St | revision 2: ref bpa#201609309302, change of d.a. checklistDetails
revision 2: ref bpa#201609309302, change of d.a. checklist | |
| Mar 21, 2018 | Completed final sign-off Aug 2018 | 1369 Hyde St | unit 64: revison to pa# 201801229173. bathroom remodel: tiled shower walls, medicine cabinets & vanity. sub contract electrical: gfi, occupancy sensor & can lights (2) sub contract plumbing: shower valve, toilet, sink, faucet & supply line and angle stops. maintain fire-rating on shower walls.Details
unit 64: revison to pa# 201801229173. bathroom remodel: tiled shower walls, medicine cabinets & vanity. sub contract electrical: gfi, occupancy sensor & can lights (2) sub contract plumbing: shower valve, toilet, sink, faucet & supply line and angle stops. maintain fire-rating on shower walls. | $10,000 |
| Jan 22, 2018 | Never finaled issued Jan 2018, no final | 665 Geary St | unit 403: kitchen cabinets & counter tops. subcontract-plumbing-kitchen facuet & supply lines. maher naDetails
unit 403: kitchen cabinets & counter tops. subcontract-plumbing-kitchen facuet & supply lines. maher na | $21,000 |
| Jan 22, 2018 | Completed final sign-off Aug 2018 | 1369 Hyde St | unit 64: kitchen cabinets & countertops, subcontract light fixtures & vent fan & gfi/outlets subcontract sink faucet & angle stops.Details
unit 64: kitchen cabinets & countertops, subcontract light fixtures & vent fan & gfi/outlets subcontract sink faucet & angle stops. | $21,000 |
| Dec 26, 2017 | Completed final sign-off Mar 2018 | 1957 Union St | unit 2: bathroom removel, new vanity & drywall repair, convert tub to shower, low flow toilet & shower valveDetails
unit 2: bathroom removel, new vanity & drywall repair, convert tub to shower, low flow toilet & shower valve | $10,000 |
| Dec 26, 2017 | Completed final sign-off Sep 2018 | 1402 Lombard St | unit 3: kitchen remodel, new cabinets & drywall repair, bring electrical up to code, low flow toilet, shower valve.Details
unit 3: kitchen remodel, new cabinets & drywall repair, bring electrical up to code, low flow toilet, shower valve. | $20,000 |
| Sep 29, 2017 | Completed final sign-off Nov 2019 | 1530 California St | per ordinance 43-14. unit legalization. legalize one bedroom unit at the rear of an (e) 6 unit bldg. existing commercial space to the front on california st.Details
per ordinance 43-14. unit legalization. legalize one bedroom unit at the rear of an (e) 6 unit bldg. existing commercial space to the front on california st. | $38,000 |
| Jun 12, 2017 | Completed final sign-off Oct 2017 | 1402 Lombard St | #1: remove & replace upper & lower kitchen cabinets & tiled kitchen floor. remove & replace bathroom vanity & mdeicine cabinet & tiled bathroom floor (like for like)Details
#1: remove & replace upper & lower kitchen cabinets & tiled kitchen floor. remove & replace bathroom vanity & mdeicine cabinet & tiled bathroom floor (like for like) | $16,000 |
| Mar 20, 2017 | Completed final sign-off Jun 2017 | 665 Geary St | unit #202; remove & replace upper & lower kitchen cabinets & tiled kitchen floor. remove & replace bathroom vanity & medicine cabinet & tiled bathroom floor.Details
unit #202; remove & replace upper & lower kitchen cabinets & tiled kitchen floor. remove & replace bathroom vanity & medicine cabinet & tiled bathroom floor. | $12,000 |
| Jan 27, 2017 | Completed final sign-off Jul 2017 | 1402 Lombard St | unit #2: remove and replace upper and lower kitchen cabinets & tiled kitchen floors, bathroom vanity and medicine cabinet and tiled bathroom floors. like for likeDetails
unit #2: remove and replace upper and lower kitchen cabinets & tiled kitchen floors, bathroom vanity and medicine cabinet and tiled bathroom floors. like for like | $16,000 |
| Jan 27, 2017 | Completed final sign-off Mar 2017 | 3239 Broderick St | unit #1: remove and replace upper and lower kitchen cabinets & tiled kitchen floors, bathroom vanity and medicine cabinet and tiled bathroom floors.Details
unit #1: remove and replace upper and lower kitchen cabinets & tiled kitchen floors, bathroom vanity and medicine cabinet and tiled bathroom floors. | $16,000 |
| Jan 27, 2017 | Completed final sign-off Apr 2017 | 566 Vallejo St | remove and replace. repair stairs and landings o stairwell. exterior, less than 50%Details
remove and replace. repair stairs and landings o stairwell. exterior, less than 50% | |
| Nov 1, 2016 | Completed final sign-off Nov 2016 | 1942 Divisadero St | less than 50% work on back stairs & landing only: remove & replace (same location ) damaged steps floor joists, joists , posts handrails, guardrails, floor boards, pickets as needed.Details
less than 50% work on back stairs & landing only: remove & replace (same location ) damaged steps floor joists, joists , posts handrails, guardrails, floor boards, pickets as needed. | $4,000 |
| Sep 30, 2016 | Completed final sign-off Jul 2018 | 2401 Post St | change of use. addition of gas cooking line and hood, pizza oven hood, sinks for prep food prep, accessible restroom and new counter.Details
change of use. addition of gas cooking line and hood, pizza oven hood, sinks for prep food prep, accessible restroom and new counter. | $50,000 |
| Sep 12, 2016 | Completed final sign-off Dec 2016 | 845 Ofarrell St | unit #1: bathroom remodel only - replace like for like. no structural walls moving, new tub, vanity, sink, tiled shower walls, tiled walls and floor, low flow toilet, hight efficiency lighting, shower valves and fixtures.Details
unit #1: bathroom remodel only - replace like for like. no structural walls moving, new tub, vanity, sink, tiled shower walls, tiled walls and floor, low flow toilet, hight efficiency lighting, shower valves and fixtures. | $13,000 |
| Aug 3, 2016 | Completed final sign-off Nov 2016 | 2562 Sutter St | ammend address on pa# 201607283611 from 2558 to 2562 sutter street. revised eletrical pa# e201608038719, plumbing pa# pp20160728553Details
ammend address on pa# 201607283611 from 2558 to 2562 sutter street. revised eletrical pa# e201608038719, plumbing pa# pp20160728553 | |
| Jul 28, 2016 | Completed final sign-off Dec 2016 | 2053 Sutter St | #104: to comply w/correction notice for complaint. ref #201626812(bid): replace windows at rear of bldg with doubld pane white vinyl. (10 total). & 1 exterior door 32"x80" at rear. u factor less than 0.32. at same openings and style and add construction cost to pa# 201606018822.Details
#104: to comply w/correction notice for complaint. ref #201626812(bid): replace windows at rear of bldg with doubld pane white vinyl. (10 total). & 1 exterior door 32"x80" at rear. u factor less than 0.32. at same openings and style and add construction cost to pa# 201606018822. | $20,000 |
| Jul 28, 2016 | Completed final sign-off Nov 2016 | 2558 Sutter St | remodel kitchen & two half baths. kitchen - remove & replace appliances, cabinets, led lighting, electrical panel, light fixtures, plugs & plates. bathroom - remove & replace vanity, low flow toilet. kitchen lighting min 50% wattage high efficacy. bathroom lighting high efficacy or controlled byDetails
remodel kitchen & two half baths. kitchen - remove & replace appliances, cabinets, led lighting, electrical panel, light fixtures, plugs & plates. bathroom - remove & replace vanity, low flow toilet. kitchen lighting min 50% wattage high efficacy. bathroom lighting high efficacy or controlled by | $20,000 |
| Jun 1, 2016 | Completed final sign-off Jun 2016 | 1299 Bush St | unit 201: install drywall & access panels in compliance with nov# 201603321. repairs due to a water leak in hydronic coils - see plumbing permit #pp20160520641Details
unit 201: install drywall & access panels in compliance with nov# 201603321. repairs due to a water leak in hydronic coils - see plumbing permit #pp20160520641 | $5,000 |
| Jun 1, 2016 | Completed final sign-off Jan 2017 | 2053 Sutter St | unit #104: remodel kitchen, bathroom, electrical panel, led lighting, new tub, move & replace toilet, sink & kitchen sink, new flooring, no wall finishes to be removed.Details
unit #104: remodel kitchen, bathroom, electrical panel, led lighting, new tub, move & replace toilet, sink & kitchen sink, new flooring, no wall finishes to be removed. | $10,000 |
| Apr 20, 2016 | Completed final sign-off May 2016 | 1299 Bush St | replace drywall removed rom walls. (interior) install access panels below the wall heaters.Details
replace drywall removed rom walls. (interior) install access panels below the wall heaters. | $2,000 |
| Apr 8, 2016 | Completed final sign-off Jul 2016 | 365 29th St | apt 2: remodel kitchen: install d/w, appliances & cabinets. h.e. lighting. til floor. upgrade electrical as required. no walls moved or removed.Details
apt 2: remodel kitchen: install d/w, appliances & cabinets. h.e. lighting. til floor. upgrade electrical as required. no walls moved or removed. | $20,000 |
| Apr 8, 2016 | Completed final sign-off May 2016 | 1811 Pierce St | apt 3: bathroom remodel only: tiled floor, new tub, showr valve & fitxures, toilet (l/f) sink, vanity, led light fixtures. tile shower walls. like for like. no walls changed or removed.Details
apt 3: bathroom remodel only: tiled floor, new tub, showr valve & fitxures, toilet (l/f) sink, vanity, led light fixtures. tile shower walls. like for like. no walls changed or removed. | $15,000 |
| Mar 1, 2016 | Never finaled issued Mar 2016, no final | 665 Geary St | to comply with complaint #201549451. remodel kitchen: new counters, new cabinets, sink & faucet, range fan, led lighting. remodel bathroom: new shower tub, vanity, low flow toilet, shower valve, switches & outlets, gfi, new high efficency lighting, electrical panel install in unit. work are withinDetails
to comply with complaint #201549451. remodel kitchen: new counters, new cabinets, sink & faucet, range fan, led lighting. remodel bathroom: new shower tub, vanity, low flow toilet, shower valve, switches & outlets, gfi, new high efficency lighting, electrical panel install in unit. work are within | $22,000 |
| Jan 19, 2016 | Completed final sign-off Apr 2016 | 625 Scott St | apt 306: kitchen remodel: d/w, g/d, m/w. replace fixtures, cabinets, location not moving. bathroom remodel: replace (e) 1 bathroom window. r/r bathroom fixtures: tub,toilet, occ sensors. remove non-weight bearing 1/2 wall h3ftxl6ft. bathroom & kitchen high efficiency light fixtures.Details
apt 306: kitchen remodel: d/w, g/d, m/w. replace fixtures, cabinets, location not moving. bathroom remodel: replace (e) 1 bathroom window. r/r bathroom fixtures: tub,toilet, occ sensors. remove non-weight bearing 1/2 wall h3ftxl6ft. bathroom & kitchen high efficiency light fixtures. | $12,000 |
| Jan 8, 2016 | Completed final sign-off Apr 2016 | 601 Van Ness Av | high efficiency light fixtures, remove and replace bathroom fixtures, location not moved. no structural work. low flow toilet, shower walls tiled. paint and flooring.Details
high efficiency light fixtures, remove and replace bathroom fixtures, location not moved. no structural work. low flow toilet, shower walls tiled. paint and flooring. | $7,000 |
| Dec 14, 2015 | Completed final sign-off Jan 2016 | 665 Geary St | unit# 406. high efficiency light fixts. remove & replace bathrm fixts. location not moved, paint & flooring. no structural work. n/a for maher.Details
unit# 406. high efficiency light fixts. remove & replace bathrm fixts. location not moved, paint & flooring. no structural work. n/a for maher. | $10,000 |
| Dec 14, 2015 | Completed final sign-off Jan 2016 | 2856 23rd St | replace deck post location deck in backyard in-kind. to comply w/ complaint#201578895.Details
replace deck post location deck in backyard in-kind. to comply w/ complaint#201578895. | $2,000 |
| Dec 14, 2015 | Completed final sign-off Jan 2016 | 665 Geary St | unit# 506. high efficiency light fixts. remove & replace bathrm fixts & kitchen fixts, cabinets. location not moved, paint & flooring. no structural work. n/a for maher. to comply w/ complaint#201549451.Details
unit# 506. high efficiency light fixts. remove & replace bathrm fixts & kitchen fixts, cabinets. location not moved, paint & flooring. no structural work. n/a for maher. to comply w/ complaint#201549451. | $10,000 |
| Oct 7, 2015 | Completed final sign-off Dec 2015 | 665 Geary St | apt 306 - remodel kitchen and bathroom. bathroom and kitchen getting high eff. light fixtures. exhaust fan will tin in to existing vent.Details
apt 306 - remodel kitchen and bathroom. bathroom and kitchen getting high eff. light fixtures. exhaust fan will tin in to existing vent. | $10,500 |
| Oct 7, 2015 | Completed final sign-off Jan 2016 | 665 Geary St | apt 405 - kitchen & bathroom remodel. to comply with complaint 201408331 & 201530301Details
apt 405 - kitchen & bathroom remodel. to comply with complaint 201408331 & 201530301 | $10,500 |
| Jul 16, 2014 | Never finaled issued Jul 2014, no final | 1380 Greenwich St | apt 107: replace kitchen countertops, repaint kitchen, 2 baths & bedrooms, install tile floor in 2 bathrooms, install carpet, remove & replace garbage disposal, 2 bathroom light fixtures, dining room light fixtures, all in existing location.Details
apt 107: replace kitchen countertops, repaint kitchen, 2 baths & bedrooms, install tile floor in 2 bathrooms, install carpet, remove & replace garbage disposal, 2 bathroom light fixtures, dining room light fixtures, all in existing location. | $10,098 |