Tab Builders
- Based in
- San Mateo
- On San Francisco permits
- Jul 2005 to Nov 2013
- Last 24 months
- 0 permits filed
8 permits since 2000: 6 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 4, 2013 | Never finaled issued Nov 2013, no final | 123 Kearny St | support details for mechanical equipment. revision to 201308204748Details
support details for mechanical equipment. revision to 201308204748 | $8,100 |
| May 15, 2013 | Completed final sign-off Nov 2013 | 123 Kearny St | install hvac system - ref pa 32012.03.15.6123Details
install hvac system - ref pa 32012.03.15.6123 | $13,500 |
| Sep 2, 2010 | Expired or cancelled expired Nov 2011 | 1907 Leavenworth St | installation of....Details
installation of.... | $8,100 |
| Sep 10, 2008 | Completed final sign-off Dec 2008 | 125 Kearny St | revision to app #200807076046. replace fan coil & condenser that serves tenant space b 1st floorDetails
revision to app #200807076046. replace fan coil & condenser that serves tenant space b 1st floor | $3,300 |
| Jul 7, 2008 | Completed final sign-off Dec 2008 | 125 Kearny St | replace (e) supply duct damaged during general demolition. (60 ft- 16", 14", 12") existing supply duct & outlets in attic space, aluma flex w/insulation, support duct from joist.Details
replace (e) supply duct damaged during general demolition. (60 ft- 16", 14", 12") existing supply duct & outlets in attic space, aluma flex w/insulation, support duct from joist. | $2,200 |
| Oct 24, 2007 | Completed final sign-off Jul 2008 | 88 King St | 7th floor-remove tub, install shower, wall removal, countertop replacement, down light installation, relocate wall heater, repair interior doors, replace basements, retile balcony deck, repaint all rooms, balcony not visible from streetDetails
7th floor-remove tub, install shower, wall removal, countertop replacement, down light installation, relocate wall heater, repair interior doors, replace basements, retile balcony deck, repaint all rooms, balcony not visible from street | $60,000 |
| Mar 20, 2007 | Completed final sign-off Jun 2007 | 133 Kearny St | installation of air hanger & ducting for new tentant, 3rd floor, suite 304 for pa# 200612280666.Details
installation of air hanger & ducting for new tentant, 3rd floor, suite 304 for pa# 200612280666. | $5,500 |
| Jul 5, 2005 | Completed final sign-off Sep 2005 | 133 Kearny St | installation of air handler & associated ductworkDetails
installation of air handler & associated ductwork | $5,500 |