T T K Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Jul 2007 to Oct 2025
- Last 24 months
- 1 permit filed
30 permits since 2000: 25 completed, 5 never finaled.
Of the 5 never-finaled permits, 1 is 5 to 10 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 8, 2025 | Completed final sign-off Jun 2026 | 789 Page St | replace existing window with a new same size window, facing the street. (u <0.3)Details
replace existing window with a new same size window, facing the street. (u <0.3) | $1,200 |
| Jul 31, 2024 | Completed final sign-off Sep 2024 | 3618 22nd St | unit #2: replace sheetrock in kitchen, bathroom, bedroom, and garage ceiling. partial kitchen and bath remodel where cabinets and fixtures removed to replace drywall.Details
unit #2: replace sheetrock in kitchen, bathroom, bedroom, and garage ceiling. partial kitchen and bath remodel where cabinets and fixtures removed to replace drywall. | $8,000 |
| Jan 29, 2024 | Completed final sign-off May 2024 | 1863 42nd Av | replace new hardy board siding in the rear and right side of the house. appx 800sfDetails
replace new hardy board siding in the rear and right side of the house. appx 800sf | $10,000 |
| Dec 11, 2023 | Completed final sign-off May 2024 | 1863 42nd Av | construct 42 lf of 3'6" h retaining wall w/ 5' h wooden fence on top of rear lotDetails
construct 42 lf of 3'6" h retaining wall w/ 5' h wooden fence on top of rear lot | $16,000 |
| May 1, 2023 | Completed final sign-off Nov 2023 | 1244 Felton St | 1st fl, add new family room, new bedroom, home office, and remodel e bathDetails
1st fl, add new family room, new bedroom, home office, and remodel e bath | $87,890 |
| Mar 21, 2023 | Completed final sign-off May 2024 | 2701 Lawton St | 1/f: new family room and new full bathroom. replace water heater and furnace. relocate laundry at 2/f, remodel (e) bathroom and kitchen; new lighting and outets to entire bldg. replace all windows. replace siding at rear dry rot repairDetails
1/f: new family room and new full bathroom. replace water heater and furnace. relocate laundry at 2/f, remodel (e) bathroom and kitchen; new lighting and outets to entire bldg. replace all windows. replace siding at rear dry rot repair | $78,600 |
| Dec 7, 2022 | Completed final sign-off Sep 2023 | 242 Romain St | convert 260sqft of exisitng garage into new bathroom and closet at the middle flr. construct new separation walls per plan. use existing plumbing and mechanical connections. add new electrical circuits per code.Details
convert 260sqft of exisitng garage into new bathroom and closet at the middle flr. construct new separation walls per plan. use existing plumbing and mechanical connections. add new electrical circuits per code. | $50,000 |
| Oct 26, 2020 | Completed final sign-off Dec 2020 | 3618 22nd St | unit #2 - remodel kitchen (2 x 12) and remove panel from closet to hallwayDetails
unit #2 - remodel kitchen (2 x 12) and remove panel from closet to hallway | $12,000 |
| Sep 22, 2020 | Completed final sign-off Nov 2020 | 3395 Balboa St | apt 3: remodel kitchen & bathroom. change electrical panel from closet to hallway.Details
apt 3: remodel kitchen & bathroom. change electrical panel from closet to hallway. | $18,000 |
| Dec 19, 2019 | Never finaled issued Jan 2020, no final | 1986 42nd Av | 2/f: remodeling (e) ktichen (remove wall), converting (e) bathroom into 2 bathrooms. build new closets into (e) bedrooms.Details
2/f: remodeling (e) ktichen (remove wall), converting (e) bathroom into 2 bathrooms. build new closets into (e) bedrooms. | $45,000 |
| Aug 16, 2018 | Completed final sign-off Oct 2018 | 3395 Balboa St | replace master bathroom, bath top and faucet, tile. replace kitchen cabinet, tile, relocation electrical from closet to hallway. replace some locations 5'x 8', 7'x 12' kitchenDetails
replace master bathroom, bath top and faucet, tile. replace kitchen cabinet, tile, relocation electrical from closet to hallway. replace some locations 5'x 8', 7'x 12' kitchen | $18,000 |
| May 16, 2017 | Completed final sign-off Jul 2017 | 570 25th Av | restucco walls of front stairs/garage.Details
restucco walls of front stairs/garage. | $1,500 |
| Dec 14, 2016 | Completed final sign-off Mar 2018 | 806 Junipero Serra Bl | 1st flr: construct new interior walls for new bathroom, bedroom and laundry, new rear conc. patio, new water heater.Details
1st flr: construct new interior walls for new bathroom, bedroom and laundry, new rear conc. patio, new water heater. | $35,000 |
| Sep 22, 2016 | Completed final sign-off Jan 2017 | 2437 Ortega St | 1st floor - construct new partition walls for new bedrooms, bathroom and laundry/media room; new door and window @ front lobby and replace (e) pier footing and posts; remove interior stairDetails
1st floor - construct new partition walls for new bedrooms, bathroom and laundry/media room; new door and window @ front lobby and replace (e) pier footing and posts; remove interior stair | $49,000 |
| Aug 25, 2016 | Completed final sign-off Jan 2017 | 2437 Ortega St | alter (e) floor layout including demolitoin & construction at 2nd floor. remodel (e) kitchen, dining, bath & construct new half toilet.Details
alter (e) floor layout including demolitoin & construction at 2nd floor. remodel (e) kitchen, dining, bath & construct new half toilet. | $15,000 |
| Jun 24, 2016 | Completed final sign-off May 2017 | 2709 43rd Av | remove kitchen at 1/f. remove non-loading wall at 1/f; rebuild (n)family room, home office and bath room at 1/f; add a rear deck & stair at 2/f.Details
remove kitchen at 1/f. remove non-loading wall at 1/f; rebuild (n)family room, home office and bath room at 1/f; add a rear deck & stair at 2/f. | $36,000 |
| Mar 27, 2013 | Completed final sign-off May 2013 | 1440 Guerrero St | repair exterior stairway, less 50% back of building, repair in kind.Details
repair exterior stairway, less 50% back of building, repair in kind. | $2,000 |
| Apr 9, 2012 | Completed final sign-off May 2012 | 3618 22nd St | replace bath tub, shower/bath faucet, tile. replace kitchen faucet, install new cabinets. 3 under-mounted cabinet lights. 6 recessed flourescent can lights. rmeove electrical panel from closet to hallways. lighting will comply with t-24Details
replace bath tub, shower/bath faucet, tile. replace kitchen faucet, install new cabinets. 3 under-mounted cabinet lights. 6 recessed flourescent can lights. rmeove electrical panel from closet to hallways. lighting will comply with t-24 | $10,000 |
| Mar 22, 2012 | Completed final sign-off May 2012 | 465 Grove St | frame the fire wall for existing kitchen hood duct relocate to the window.Details
frame the fire wall for existing kitchen hood duct relocate to the window. | $6,800 |
| Jan 20, 2012 | Completed final sign-off Mar 2012 | 513 Vienna St | re-tile bathroom, change toilet, vanity, replace kitchen and cabinet, lighting shall be comply with title 24Details
re-tile bathroom, change toilet, vanity, replace kitchen and cabinet, lighting shall be comply with title 24 | $10,000 |
| Jun 30, 2011 | Completed final sign-off Nov 2011 | 862 29th Av | remodel bathroom @ second flr., in-kind. change light and plug.Details
remodel bathroom @ second flr., in-kind. change light and plug. | $5,000 |
| Mar 3, 2010 | Completed final sign-off Apr 2010 | 3618 22nd St | unit #1 -replace bathtub & fauset remodel ktichen, install 6 lights in living room, 4 under cabinet lights, switch planel from closet to hallway, lighting shall meet cec 150 (k) requirement. no change to exhaust sytem.Details
unit #1 -replace bathtub & fauset remodel ktichen, install 6 lights in living room, 4 under cabinet lights, switch planel from closet to hallway, lighting shall meet cec 150 (k) requirement. no change to exhaust sytem. | $12,000 |
| Dec 23, 2009 | Completed final sign-off Feb 2010 | 3618 22nd St | apt 33: kitchen and bath remodel. replace tub, change faucet. relocate kitchen cabinets. install 8 recessed lights in living room, switch electric panel from closet to hallway. 4 under cabinet lightsDetails
apt 33: kitchen and bath remodel. replace tub, change faucet. relocate kitchen cabinets. install 8 recessed lights in living room, switch electric panel from closet to hallway. 4 under cabinet lights | $12,000 |
| Oct 22, 2008 | Never finaled issued Oct 2008, no final | 468 04th Av | comply w/ nov 200873586. number 1-15. misc. interior & exterior residential repair work.Details
comply w/ nov 200873586. number 1-15. misc. interior & exterior residential repair work. | $2,000 |
| Aug 11, 2008 | Completed final sign-off Sep 2008 | 3618 22nd St | work @ apt# 23 only. remodel bathroom & kitchen. change electric panal from inside closet to outside closet in apt# 23. no structural work. no new lighting in kitchen. bath new lighting to be high efficancy or manual on auto off switch.Details
work @ apt# 23 only. remodel bathroom & kitchen. change electric panal from inside closet to outside closet in apt# 23. no structural work. no new lighting in kitchen. bath new lighting to be high efficancy or manual on auto off switch. | $17,000 |
| Jul 1, 2008 | Completed final sign-off Sep 2008 | 3618 22nd St | work on apt #25. remodel bathroom and kitchen . install 8 ceiling lighting change panel from closet to hallway.Details
work on apt #25. remodel bathroom and kitchen . install 8 ceiling lighting change panel from closet to hallway. | $8,000 |
| May 14, 2008 | Never finaled issued Sep 2008, no final | 364 09th St | facade renovation & add new lights at bldg & entrance. thicken wood post & top of wall cornice. replace existing railing with new. add new trellis (total 3) at roof top.Details
facade renovation & add new lights at bldg & entrance. thicken wood post & top of wall cornice. replace existing railing with new. add new trellis (total 3) at roof top. | $30,000 |
| May 13, 2008 | Never finaled issued May 2008, no final | 364 09th St | to renew app#2006/02/03/3756 for final inspection.Details
to renew app#2006/02/03/3756 for final inspection. | $2,500 |
| May 13, 2008 | Never finaled issued May 2008, no final | 1308 Harrison St | to renew app#2006/02/03/3760 for final inspection.Details
to renew app#2006/02/03/3760 for final inspection. | $5,100 |
| Jul 12, 2007 | Completed final sign-off Jan 2008 | 1214 Polk St | repair all deteriorated shower partitions throughtout as needed and toilets as needed. repair tiles as needed to comply. provide adequate lighting as needed to comply with nov. replace and repair as necessary. to comply w/nov#200557356Details
repair all deteriorated shower partitions throughtout as needed and toilets as needed. repair tiles as needed to comply. provide adequate lighting as needed to comply with nov. replace and repair as necessary. to comply w/nov#200557356 | $8,000 |