T L G Plumbing Construction
- Based in
- San Francisco
- On San Francisco permits
- Dec 2001 to Jul 2010
- Last 24 months
- 0 permits filed
7 permits since 2000: 6 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 16, 2010 | Completed final sign-off Sep 2010 | 953 Dwight St | replace stucco at front on 3rd floor and dry rot repair. front (35' x 10').Details
replace stucco at front on 3rd floor and dry rot repair. front (35' x 10'). | $1,500 |
| May 15, 2007 | Completed final sign-off Jun 2007 | 1723 Geneva Av | tlg will extend extg room and add a bathroom with electrical lighting outlet on the ground floorDetails
tlg will extend extg room and add a bathroom with electrical lighting outlet on the ground floor | |
| Mar 12, 2007 | Completed final sign-off Jun 2007 | 1723 Geneva Av | tlg will extend extg room and add a bathroom with electric lighting and outlets on the ground floorDetails
tlg will extend extg room and add a bathroom with electric lighting and outlets on the ground floor | $20,000 |
| Mar 3, 2005 | Completed final sign-off Mar 2005 | 862 Moultrie St | construct new partition wall at ground floor, garage level to enlarge existing storage roomDetails
construct new partition wall at ground floor, garage level to enlarge existing storage room | $800 |
| Sep 16, 2002 | Never finaled issued Sep 2002, no final | 953 Dwight St | add metal grade over light well.require light from skylight and window.Details
add metal grade over light well.require light from skylight and window. | $500 |
| Feb 5, 2002 | Completed final sign-off Oct 2002 | 953 Dwight St | relocation of existing electrical/mech svc at toilet shower, sink areas,case opening change e fusesDetails
relocation of existing electrical/mech svc at toilet shower, sink areas,case opening change e fuses | $10,000 |
| Dec 17, 2001 | Completed final sign-off Dec 2001 | 453 Cortland Av | revision:200003073703 (new contractor take over job and complete)for final inspection only no workDetails
revision:200003073703 (new contractor take over job and complete)for final inspection only no work | $1,000 |