T H Eller Construction
- Based in
- Woodacre
- On San Francisco permits
- Oct 2001 to Jun 2015
- Last 24 months
- 0 permits filed
7 permits since 2000: 6 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 26, 2015 | Completed final sign-off Nov 2015 | 526 Pacheco St | 1. kitchen remodel - replace flooring, replace cabinets, replace plumbing fixtures at kitchen sink. install stove, install built in refrigerator, relocate (e) electrical outlets, install 3 new elec outlets. 2. re-tile bath tub/shower at main floor bathroom.Details
1. kitchen remodel - replace flooring, replace cabinets, replace plumbing fixtures at kitchen sink. install stove, install built in refrigerator, relocate (e) electrical outlets, install 3 new elec outlets. 2. re-tile bath tub/shower at main floor bathroom. | $80,000 |
| Jan 13, 2009 | Completed final sign-off Mar 2009 | 3164 Clay St | work @ unit# 3164 only. repair water damage 64 sq.ft. sheetrock & 60 sq.ft. plaster, kitchen ceiling & hallway wall.Details
work @ unit# 3164 only. repair water damage 64 sq.ft. sheetrock & 60 sq.ft. plaster, kitchen ceiling & hallway wall. | $30,000 |
| May 1, 2007 | Completed final sign-off May 2007 | 950 Columbus Av | renew pa# 2006/06/01/2990 & pa# 2006/12/08/9533 for final inspection only.Details
renew pa# 2006/06/01/2990 & pa# 2006/12/08/9533 for final inspection only. | |
| Aug 1, 2006 | Completed final sign-off May 2007 | 950 Columbus Av | kitchen remodel new carbinets, appliance location to remain. master bath, new tile @ tub shower new vanity new toilet.no structural work.Details
kitchen remodel new carbinets, appliance location to remain. master bath, new tile @ tub shower new vanity new toilet.no structural work. | $55,000 |
| Jun 1, 2006 | Never finaled issued Jun 2006, no final | 950 Columbus Av | shower floor and wall tile replace including water proof membrane, new door shower new shower valve and head, new toilet, new vanity and new sink in same locationDetails
shower floor and wall tile replace including water proof membrane, new door shower new shower valve and head, new toilet, new vanity and new sink in same location | $11,000 |
| Apr 26, 2002 | Completed final sign-off Jul 2002 | 1187 Franklin St | revision to#200110039833 omit (delete) power assured doors at south galleryDetails
revision to#200110039833 omit (delete) power assured doors at south gallery | $100 |
| Oct 3, 2001 | Completed final sign-off Jul 2002 | 1187 Franklin St | barrier removal only/accessibility upgrades-3 new ramps w/ handrailDetails
barrier removal only/accessibility upgrades-3 new ramps w/ handrail | $50,000 |