T & D General Builders
- Based in
- Daly City
- On San Francisco permits
- Dec 2003 to Mar 2005
- Last 24 months
- 0 permits filed
8 permits since 2000: 8 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 1, 2005 | Completed final sign-off Mar 2005 | 654 Chenery St | revision to app #2004/09/08/3586 permit number 1035417 issued 9/8/2004 install one sun tunnelDetails
revision to app #2004/09/08/3586 permit number 1035417 issued 9/8/2004 install one sun tunnel | $500 |
| Aug 6, 2004 | Completed final sign-off Feb 2006 | 906 Garfield St | add third floor that consist of master bedroom, one loft, anothr bedroom, a den and two bathroomsDetails
add third floor that consist of master bedroom, one loft, anothr bedroom, a den and two bathrooms | $80,000 |
| Jun 25, 2004 | Completed final sign-off Feb 2005 | 1226 Page St | repair stud wall in the crawl space in the basement.install plywood,dryrot repair,no structural workDetails
repair stud wall in the crawl space in the basement.install plywood,dryrot repair,no structural work | $10,000 |
| May 13, 2004 | Completed final sign-off Jun 2004 | 2321 Judah St | repair & remodel existing deck per plan.Details
repair & remodel existing deck per plan. | $5,000 |
| Mar 25, 2004 | Completed final sign-off Aug 2004 | 1288 29th Av | removed poured concrete per plan- remove (e) concrete slab on gradeDetails
removed poured concrete per plan- remove (e) concrete slab on grade | $6,000 |
| Jan 26, 2004 | Completed final sign-off Jun 2004 | 2321 Judah St | reroofingDetails
reroofing | $4,300 |
| Dec 30, 2003 | Completed final sign-off Jun 2004 | 2321 Judah St | install new skylight in the kitchen roof( slope) per planDetails
install new skylight in the kitchen roof( slope) per plan | $1,000 |
| Dec 9, 2003 | Completed final sign-off Jun 2004 | 2321 Judah St | kitchen remodel-cabinets,counter top&kitchen appl.upgrade elec&light.bathroom-fixture,fl&wall tile.Details
kitchen remodel-cabinets,counter top&kitchen appl.upgrade elec&light.bathroom-fixture,fl&wall tile. | $31,000 |