T C Castle Construction Inc
- Based in
- Santa Rosa
- On San Francisco permits
- Jun 2013 to Feb 2017
- Last 24 months
- 0 permits filed
4 permits since 2000: 3 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 16, 2017 | Completed final sign-off Jul 2017 | 2200 Pacific Av | #7-b -remodel bathroom, powder room, minor works in bedrrom and living room; new bath fixtures at same location -misc, framing- elect hlight & upgrades -dry wall, tile, flooring & painting.Details
#7-b -remodel bathroom, powder room, minor works in bedrrom and living room; new bath fixtures at same location -misc, framing- elect hlight & upgrades -dry wall, tile, flooring & painting. | $35,000 |
| Aug 25, 2015 | Completed final sign-off Mar 2016 | 2200 Pacific Av | interior remodel - complete kitchen + 2.5 bathrooms, new cabinets - fixtures - appliances. all at existing locations - dry wall - doors + casework. paint + flooring. no structural work - no wall altered.Details
interior remodel - complete kitchen + 2.5 bathrooms, new cabinets - fixtures - appliances. all at existing locations - dry wall - doors + casework. paint + flooring. no structural work - no wall altered. | $175,000 |
| May 28, 2014 | Never finaled issued May 2014, no final | 2200 Pacific Av | unit #7-c:remodel of extg kitchen cabinets, new kitchen lighting, new sink, dishwaser faucet and disposal, new appliances,new cabinets, new flooring, new kitchen layout to be same as extg layout. all new lgtg shall be high effecacy.Details
unit #7-c:remodel of extg kitchen cabinets, new kitchen lighting, new sink, dishwaser faucet and disposal, new appliances,new cabinets, new flooring, new kitchen layout to be same as extg layout. all new lgtg shall be high effecacy. | $35,000 |
| Jun 18, 2013 | Completed final sign-off Jan 2014 | 2536 Fillmore St | remodel two (2) (e) bathrooms & two (2) (e) bedrooms. replace damaged siding, new lighting & plumbing fixtures, new sheetrock, paint and flooring. no structural work.Details
remodel two (2) (e) bathrooms & two (2) (e) bedrooms. replace damaged siding, new lighting & plumbing fixtures, new sheetrock, paint and flooring. no structural work. | $35,000 |