T Bailey Construction
- Based in
- Dublin
- On San Francisco permits
- Jun 2009 to Jan 2011
- Last 24 months
- 0 permits filed
2 permits since 2000: 1 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 18, 2011 | Completed final sign-off Apr 2011 | 130 Graystone Tr | unit 4 remove deckboards, repair ex framing, replace with new deck boards, reset orig railing. unit 8, remove nad replace ex rooftop deck with new framing adn deck boards, new railing. replace decks in kind, not visible from street, no structural workDetails
unit 4 remove deckboards, repair ex framing, replace with new deck boards, reset orig railing. unit 8, remove nad replace ex rooftop deck with new framing adn deck boards, new railing. replace decks in kind, not visible from street, no structural work | $11,000 |
| Jun 8, 2009 | Expired or cancelled expired Jan 2011 | 1630 Broderick St | create a larger living room on the first floor by removing (e) bearing and non bearing wall and instaliing new structural beam and postsDetails
create a larger living room on the first floor by removing (e) bearing and non bearing wall and instaliing new structural beam and posts | $2,000 |