T A A Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Mar 2011 to Mar 2016
- Last 24 months
- 0 permits filed
13 permits since 2000: 11 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 22, 2016 | Completed final sign-off Jun 2016 | 1034 Divisadero St | rear stair repair, less than 50%Details
rear stair repair, less than 50% | $10,000 |
| Sep 24, 2012 | Completed final sign-off Oct 2012 | 222 Arleta Av | repair deck - wood deterioration in stringer, replace few steps landing and replace few pick and renail to comply with notice of violation #201212261. less than 50%.Details
repair deck - wood deterioration in stringer, replace few steps landing and replace few pick and renail to comply with notice of violation #201212261. less than 50%. | $2,000 |
| May 31, 2012 | Completed final sign-off Jun 2012 | 149 London St | to comply with nov #200711671 to remove wall & roof enclosure approx. 8 ft x 10 ft at rear of house that was built without permit.Details
to comply with nov #200711671 to remove wall & roof enclosure approx. 8 ft x 10 ft at rear of house that was built without permit. | $1,000 |
| May 17, 2012 | Completed final sign-off Jun 2012 | 149 London St | repair dry rot damage and replace risers as needed less than 50% @ front stairsDetails
repair dry rot damage and replace risers as needed less than 50% @ front stairs | $3,000 |
| Feb 24, 2012 | Never finaled issued Feb 2012, no final | 2778 21st St | bath 1: shower wall tile only, 2nd bath: install fibertub and back splash. replace kitchen cabinet, add 4 electrical circuits, install new furnace in attic.Details
bath 1: shower wall tile only, 2nd bath: install fibertub and back splash. replace kitchen cabinet, add 4 electrical circuits, install new furnace in attic. | $10,000 |
| Dec 5, 2011 | Completed final sign-off Jan 2012 | 146 Athens St | remodel (1) kitchen. replace cabinets, counter top. remodel (1) bathroom, replace tile - toilet, new vanity. new service electrical only for kitchen and bathroom.Details
remodel (1) kitchen. replace cabinets, counter top. remodel (1) bathroom, replace tile - toilet, new vanity. new service electrical only for kitchen and bathroom. | $18,000 |
| Nov 14, 2011 | Completed final sign-off Mar 2012 | 841 Dwight St | remodel kitchen, replace cabinet, counter top. remodel one bathroom, retile & replace toilet and new vanity.Details
remodel kitchen, replace cabinet, counter top. remodel one bathroom, retile & replace toilet and new vanity. | $13,000 |
| Jul 11, 2011 | Completed final sign-off Sep 2011 | 278 Parker Av | replace kitchen cabinets and counter top.Details
replace kitchen cabinets and counter top. | $7,000 |
| Jun 1, 2011 | Completed final sign-off Jul 2011 | 46 Wabash Tr | change kitchen cabinets and counter tops, light fixtures. comply with cec 150 (k). change bathroom fixtures and retile floor, new toilet and vanity. no structural changes, no walls relocation. work on 2nd floor only.Details
change kitchen cabinets and counter tops, light fixtures. comply with cec 150 (k). change bathroom fixtures and retile floor, new toilet and vanity. no structural changes, no walls relocation. work on 2nd floor only. | $16,000 |
| May 5, 2011 | Completed final sign-off Jul 2011 | 46 Wabash Tr | revision to app#201004190538. ground floor: add 2 bedrooms, full bath and laundry to comply with nov 200668889Details
revision to app#201004190538. ground floor: add 2 bedrooms, full bath and laundry to comply with nov 200668889 | $20,000 |
| Mar 25, 2011 | Completed final sign-off May 2011 | 630 Presidio Av | replace (e) sliding doors in kind not visible from the street u-factor less than or greater than 0.40Details
replace (e) sliding doors in kind not visible from the street u-factor less than or greater than 0.40 | $4,000 |
| Mar 21, 2011 | Expired or cancelled cancelled Jul 2011 | 86 Wabash Tr | change kitchen cabinets and light fixtures, change bathroom fixtures and retile. new lighting comply with cec150(k)Details
change kitchen cabinets and light fixtures, change bathroom fixtures and retile. new lighting comply with cec150(k) | $9,000 |
| Mar 14, 2011 | Completed final sign-off Jul 2011 | 630 Presidio Av | changing kitchen cabinets, changing bathroom fixtures and re-tile, including lighting, exhaust fanDetails
changing kitchen cabinets, changing bathroom fixtures and re-tile, including lighting, exhaust fan | $7,000 |