Szeto Construction
- Based in
- San Francisco
- On San Francisco permits
- Jan 2000 to Feb 2026
- Last 24 months
- 2 permits filed
13 permits since 2000: 9 completed, 2 never finaled, 2 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 11, 2026 | Completed final sign-off Apr 2026 | 783 11th Av | to abate nov 202650561- auto damage repair to include replace corner post repair interior plaster cracks, paint @ 2nd floor, replace stucco in kind at entry wall and face of building. replace garage door and enlarge entry doorDetails
to abate nov 202650561- auto damage repair to include replace corner post repair interior plaster cracks, paint @ 2nd floor, replace stucco in kind at entry wall and face of building. replace garage door and enlarge entry door | $60,000 |
| Feb 11, 2026 | Completed final sign-off Apr 2026 | 787 11th Av | to abate nov 202650561- auto damage repair to include replace corner post repair interior plaster cracks, paint @ 2nd floor, replace stucco in kind at entry wall and face of buildling.Details
to abate nov 202650561- auto damage repair to include replace corner post repair interior plaster cracks, paint @ 2nd floor, replace stucco in kind at entry wall and face of buildling. | $30,000 |
| Jul 6, 2018 | Completed final sign-off Dec 2018 | 1241 Broadway | remodel kitchen & bathroom, new cabinets, tile, replace (e) bathtubs w/shower, all work to be nonstructural, new fixtures in-kindDetails
remodel kitchen & bathroom, new cabinets, tile, replace (e) bathtubs w/shower, all work to be nonstructural, new fixtures in-kind | $25,000 |
| Jun 11, 2015 | Completed final sign-off Jul 2015 | 767 06th Av | apt. #1: remove old cabinet and counter top and replace with new ones. all wor to be non structuralDetails
apt. #1: remove old cabinet and counter top and replace with new ones. all wor to be non structural | $5,000 |
| Sep 16, 2010 | Completed final sign-off Mar 2011 | 888 Geneva Av | remodel extg 1 story take-out food service. install new grease trap and new exhaust hood with fire suppression system. install new counter with back splash. replace extg flourescent light with new flourescent lights. paint interior only.Details
remodel extg 1 story take-out food service. install new grease trap and new exhaust hood with fire suppression system. install new counter with back splash. replace extg flourescent light with new flourescent lights. paint interior only. | $1,500 |
| Jan 27, 2009 | Never finaled issued Jan 2009, no final | 1541 08th Av | to obtain final inspection for work approved under pa#9918020s. all work has been completed.Details
to obtain final inspection for work approved under pa#9918020s. all work has been completed. | |
| Jan 27, 2009 | Never finaled issued Jan 2009, no final | 1541 08th Av | to obtain final inspection for work approved under pa#200004207758. all work has been completed.Details
to obtain final inspection for work approved under pa#200004207758. all work has been completed. | |
| Jan 24, 2007 | Completed final sign-off Apr 2007 | 611 06th Av | replace existing damaged 6x6 garder beam at garage with new steel beam (18x40) at mid span.Details
replace existing damaged 6x6 garder beam at garage with new steel beam (18x40) at mid span. | $4,800 |
| Dec 27, 2006 | Completed final sign-off Apr 2007 | 611 06th Av | replace (e) lath and plaster wall with new sheetrock, not to exceed 1/2 of all wall. remodel (e) 2 bathrooms, 1 kitchen. no structural work to be done. new electrical, plumbing throughout. all lighting to meet t24 requirements.Details
replace (e) lath and plaster wall with new sheetrock, not to exceed 1/2 of all wall. remodel (e) 2 bathrooms, 1 kitchen. no structural work to be done. new electrical, plumbing throughout. all lighting to meet t24 requirements. | $90,000 |
| Sep 15, 2004 | Completed final sign-off Mar 2006 | 3040 24th Av | remove interior plaster wall and replace with sheetrock/remodel kchn/remodel 2 bthrm/repair exterriDetails
remove interior plaster wall and replace with sheetrock/remodel kchn/remodel 2 bthrm/repair exterri | $70,000 |
| Mar 6, 2002 | Expired or cancelled expired Sep 2002 | 663 Guerrero St | remodel kitchen, replace cabinets and counter top, new flooring and paintDetails
remodel kitchen, replace cabinets and counter top, new flooring and paint | $12,000 |
| Mar 6, 2000 | Completed final sign-off Apr 2017 | 816 Folsom St | comply with nov 9900148, renew of application 9908704Details
comply with nov 9900148, renew of application 9908704 | |
| Jan 13, 2000 | Expired or cancelled expired Jul 2000 | 2501 20th Av | remodel kitchen, bathroom, cabinets,etcDetails
remodel kitchen, bathroom, cabinets,etc | $15,000 |