Syntax Construction
- Based in
- Berkeley
- On San Francisco permits
- Apr 2013 to Sep 2015
- Last 24 months
- 0 permits filed
6 permits since 2000: 5 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 21, 2015 | Completed final sign-off Oct 2015 | 1833 Laguna St | administrative correction of number of stories. revision to 201404223870 s1 plans depict (e) and (n) 3 story building. no vertical additionDetails
administrative correction of number of stories. revision to 201404223870 s1 plans depict (e) and (n) 3 story building. no vertical addition | |
| Apr 22, 2014 | Completed final sign-off Oct 2015 | 1833 Laguna St | horizontal addition to (e) single family residence. (n) envelope to include deck & living space.Details
horizontal addition to (e) single family residence. (n) envelope to include deck & living space. | $300,000 |
| Mar 18, 2014 | Completed final sign-off Jul 2014 | 1485 Yosemite Av | construct new interior partitions for (coffee) preparation. new walk in refrigerator for food storage. demolish slab to provide installment of new floor drain. upgrade electrical service.n/a for the maher ordinance #155-13Details
construct new interior partitions for (coffee) preparation. new walk in refrigerator for food storage. demolish slab to provide installment of new floor drain. upgrade electrical service.n/a for the maher ordinance #155-13 | $60,000 |
| Dec 10, 2013 | Completed final sign-off Oct 2015 | 1833 Laguna St | demo selec int partitions, baths, int finishes & 3 chimneys. construct/remodel kitchen, (n) baths & int paritions & install (n) gas fireplaces. remodel garage includ new media, bedrm & bath & remodel 2/f space. relcoate water heater. replace (e) windows. seismic retrofit under separate permit.Details
demo selec int partitions, baths, int finishes & 3 chimneys. construct/remodel kitchen, (n) baths & int paritions & install (n) gas fireplaces. remodel garage includ new media, bedrm & bath & remodel 2/f space. relcoate water heater. replace (e) windows. seismic retrofit under separate permit. | $60,000 |
| Oct 15, 2013 | Completed final sign-off Oct 2015 | 1833 Laguna St | foundation replacementDetails
foundation replacement | $56,000 |
| Apr 25, 2013 | Never finaled issued Apr 2013, no final | 2828 Divisadero St | addition of an at-grade deck with artifical grass covering in the rear yard of an existing house.Details
addition of an at-grade deck with artifical grass covering in the rear yard of an existing house. | $20,000 |