Synergy Dba Solar Universe-Brentwood
- Based in
- Brentwood
- On San Francisco permits
- Jun 2023 to Sep 2024
- Last 24 months
- 0 permits filed
4 permits since 2000: 2 completed, 2 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 18, 2024 | In progress issued Feb 2025 | 1266 09th Av | installing (2) chargepoint level 2 ev chargers at parking garage.Details
installing (2) chargepoint level 2 ev chargers at parking garage. | $12,599 |
| Dec 5, 2023 | In progress issued Oct 2024 | 2000 Van Ness Av | dish: remove 6 (e) antennas and screen boxes. remove 2 (e) cabinets. install 3 new antennas inside 3 new screen boxes. install 1 new cabinet. no batteries. re-use (e) 200a meterDetails
dish: remove 6 (e) antennas and screen boxes. remove 2 (e) cabinets. install 3 new antennas inside 3 new screen boxes. install 1 new cabinet. no batteries. re-use (e) 200a meter | $90,000 |
| Oct 30, 2023 | Completed final sign-off Mar 2025 | 300 02nd Av | dish: remove (e) antennas & equipment; install 3(n) antennas within 2(n) screen radomes; install 1(n) cabinet; install (n) electrical panel; no proposed batteriesDetails
dish: remove (e) antennas & equipment; install 3(n) antennas within 2(n) screen radomes; install 1(n) cabinet; install (n) electrical panel; no proposed batteries | $50,000 |
| Jun 26, 2023 | Completed final sign-off Jan 2024 | 65 Normandie Tr | ess 27-kwh ess. tesla wall connector. electrical permit# e202106073475.Details
ess 27-kwh ess. tesla wall connector. electrical permit# e202106073475. |