Switch Construction
- Based in
- San Francisco
- On San Francisco permits
- Jun 2022 to Dec 2025
- Last 24 months
- 3 permits filed
6 permits since 2000: 5 completed, 1 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 3, 2025 | In progress filed Dec 2025, not yet issued | 90 Edgehill Wy | all exterior work. (n) terraced planters, (n) rear yard wood deck, (n) site stair to deck, (n) retaining wall at rear yard property line with wood fence, (n) front metal gate w/ sliding driveway gate. (n) recessed front entry gate.Details
all exterior work. (n) terraced planters, (n) rear yard wood deck, (n) site stair to deck, (n) retaining wall at rear yard property line with wood fence, (n) front metal gate w/ sliding driveway gate. (n) recessed front entry gate. | $80,000 |
| Apr 29, 2025 | Completed final sign-off Apr 2026 | 1242 Sacramento St | unit #6: remodel bathroom existing bathtub to become shower area.Details
unit #6: remodel bathroom existing bathtub to become shower area. | $10,000 |
| Oct 30, 2024 | Completed final sign-off Dec 2024 | 580 Sutter St | revision to pa # 2024-0624-5094 remove (n) floor sink from scope. show (e) floor sink below water heater. relocate refuse area, ice maker, storage equipment and mop sink.Details
revision to pa # 2024-0624-5094 remove (n) floor sink from scope. show (e) floor sink below water heater. relocate refuse area, ice maker, storage equipment and mop sink. | |
| Jun 24, 2024 | Completed final sign-off Dec 2024 | 580 Sutter St | demo and replace e bar, seating, fixtures and finishes, add new bar framing, casework, services, equipment, fixtures finishes. new wall and ceiling finishes and new flooring throughout. note extent of work prev permitted 202106172693Details
demo and replace e bar, seating, fixtures and finishes, add new bar framing, casework, services, equipment, fixtures finishes. new wall and ceiling finishes and new flooring throughout. note extent of work prev permitted 202106172693 | $50,000 |
| Aug 25, 2023 | Completed final sign-off Aug 2024 | 220 30th Av | patch work and repair roof as need less than 25%Details
patch work and repair roof as need less than 25% | $10,000 |
| Jun 8, 2022 | Completed final sign-off Sep 2022 | 3243 Pierce St | one bathroom remodel and water repair. non structuralDetails
one bathroom remodel and water repair. non structural | $40,000 |