Swilly Plastering And Stucco
- Based in
- San Francisco
- On San Francisco permits
- Aug 2017 to Mar 2026
- Last 24 months
- 3 permits filed
8 permits since 2000: 7 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 13, 2026 | Completed final sign-off Apr 2026 | 220 Gellert Dr | demo approx. 1200 sq ft of stucco on the right side of house, repair any bad framing, install new waterproofing/lath. install scratch coat and new brown coat to match existing.Details
demo approx. 1200 sq ft of stucco on the right side of house, repair any bad framing, install new waterproofing/lath. install scratch coat and new brown coat to match existing. | $30,000 |
| Aug 27, 2025 | Completed final sign-off Jan 2026 | 1100 Leavenworth St | remove 3 rows loose brick and appx. 150 sf of loose stucco repalce brick and stucco. side of building visible from street.Details
remove 3 rows loose brick and appx. 150 sf of loose stucco repalce brick and stucco. side of building visible from street. | $15,000 |
| Apr 29, 2025 | Completed final sign-off Jun 2025 | 26 Crescent Av | remove old stucco, replace in kind. (at the back only)Details
remove old stucco, replace in kind. (at the back only) | $18,000 |
| Mar 24, 2023 | Completed final sign-off Jun 2023 | 578 19th Av | remove stucco on the facade. replace with new stucco on the facade. approx. 625sfDetails
remove stucco on the facade. replace with new stucco on the facade. approx. 625sf | $10,000 |
| Oct 28, 2021 | Completed final sign-off Sep 2024 | 556 25th Av | remove old stucco, install 12 new windows, install new lath and new stucco approx. 650sf. windows are anderson double hung e series u=.30 maxDetails
remove old stucco, install 12 new windows, install new lath and new stucco approx. 650sf. windows are anderson double hung e series u=.30 max | $10,000 |
| Jan 26, 2021 | Completed final sign-off Apr 2021 | 145 22nd Av | remove old stucco; replace with new stucco. front of building. ~650 sqft.Details
remove old stucco; replace with new stucco. front of building. ~650 sqft. | $5,000 |
| Sep 26, 2018 | Completed final sign-off Nov 2018 | 1040 Fulton St | set up scaffold, demolition to (e) stucco on side panel, 46ft x 10ft. if dry rot found get estimated for repair, lath, scratch brown to match (e) texture, repair window trim in patch area. no visible from street.Details
set up scaffold, demolition to (e) stucco on side panel, 46ft x 10ft. if dry rot found get estimated for repair, lath, scratch brown to match (e) texture, repair window trim in patch area. no visible from street. | $11,000 |
| Aug 7, 2017 | Never finaled issued Aug 2017, no final | 1335 Willard St | repair / replace stucco at front facade in kind. repair cornice. no building expansion.Details
repair / replace stucco at front facade in kind. repair cornice. no building expansion. | $5,500 |