Swift Construction
- Based in
- San Mateo
- On San Francisco permits
- May 2013 to Nov 2025
- Last 24 months
- 4 permits filed
11 permits since 2000: 9 completed, 2 never finaled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 18, 2025 | Completed final sign-off Dec 2025 | 364 Eddy St | 4th fl: bathroom remodel:replace tub with stall shower.Details
4th fl: bathroom remodel:replace tub with stall shower. | $25,000 |
| Aug 5, 2025 | Completed final sign-off Sep 2025 | 364 Eddy St | 3rd floor bathroom remodel, replace tub with stall shower.Details
3rd floor bathroom remodel, replace tub with stall shower. | $10,000 |
| Jun 25, 2025 | Completed final sign-off Aug 2025 | 364 Eddy St | 5th floor - bathroom remodel: replace bathtub with stall showerDetails
5th floor - bathroom remodel: replace bathtub with stall shower | $25,000 |
| Feb 14, 2025 | Completed final sign-off Aug 2025 | 364 Eddy St | re-do bathroom wall + floor (2nd floor). replace room door at unit# 115. replace flooring + fix walls in unit# 117; 216 & 217. paint room # 117; 216 & 217.Details
re-do bathroom wall + floor (2nd floor). replace room door at unit# 115. replace flooring + fix walls in unit# 117; 216 & 217. paint room # 117; 216 & 217. | $35,000 |
| Mar 28, 2022 | Completed final sign-off Apr 2022 | 433 Ellis St | g/f restaurant: minor repair only, no structural work, no wall modification, install new 220 outlet, gas connection for appliance, repair damaged walls (approx 10 sq. ft.), replace damaged tiles (approx 10 tiles)Details
g/f restaurant: minor repair only, no structural work, no wall modification, install new 220 outlet, gas connection for appliance, repair damaged walls (approx 10 sq. ft.), replace damaged tiles (approx 10 tiles) | $1,200 |
| Jul 19, 2021 | Completed final sign-off Sep 2021 | 433 Ellis St | apt# 109 - kitchen upgrade. change base cabinets to stainless steel. replace old sink with new one.Details
apt# 109 - kitchen upgrade. change base cabinets to stainless steel. replace old sink with new one. | $15,600 |
| Sep 20, 2018 | Completed final sign-off Oct 2019 | 433 Ellis St | demo exisiting front entrance door, existing ramp & floor at entrance. construct platform & ada lift. construct a new glass wal & door at entrance. install replacement floor at entrance, remove entrance gate. maher n/a.Details
demo exisiting front entrance door, existing ramp & floor at entrance. construct platform & ada lift. construct a new glass wal & door at entrance. install replacement floor at entrance, remove entrance gate. maher n/a. | $28,000 |
| Jun 2, 2017 | Completed final sign-off Mar 2018 | 1970 36th Av | kitchen and bathroom remodel, add new bathroom in garage, exhaust fans in kitchen/bathroon, change exterior windows 7 aluminum to new wood aluminum clad, no proposed building expansion.Details
kitchen and bathroom remodel, add new bathroom in garage, exhaust fans in kitchen/bathroon, change exterior windows 7 aluminum to new wood aluminum clad, no proposed building expansion. | $148,000 |
| Feb 26, 2016 | Never finaled issued Feb 2016, no final | 433 Ellis St | add electrical outlets in all rooms, 60 total. install tiles in front of common bathroom on 1st, 2nd and 3rd floors.Details
add electrical outlets in all rooms, 60 total. install tiles in front of common bathroom on 1st, 2nd and 3rd floors. | $6,200 |
| May 21, 2013 | Completed final sign-off Aug 2013 | 433 Ellis St | to comply with ordinance 029-13 only; installation of grab bars in sro at the following location: public restrooms, min load rating 250 lbsDetails
to comply with ordinance 029-13 only; installation of grab bars in sro at the following location: public restrooms, min load rating 250 lbs | $480 |
| May 21, 2013 | Never finaled issued May 2013, no final | 405 Valencia St | to comply with ordinance 029-13 only; installation of grab bars in sro at the following location:min load rating 250 lbsDetails
to comply with ordinance 029-13 only; installation of grab bars in sro at the following location:min load rating 250 lbs | $480 |