Swartz Construction
- Based in
- Santa Rosa
- On San Francisco permits
- Apr 2026 to Apr 2026
- Last 24 months
- 1 permit filed
1 permit since 2000: 1 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 10, 2026 | In progress issued Aug 2026 | 2277 Green St | remove and replace waterproof membrane, stone tile, limited siding (dry-rot_ exterior steplights at exterior terrance deck and stairs.)Details
remove and replace waterproof membrane, stone tile, limited siding (dry-rot_ exterior steplights at exterior terrance deck and stairs.) | $35,000 |