Sustainable Solutions
- Based in
- San Francisco
- On San Francisco permits
- Jun 2014 to Jun 2014
- Last 24 months
- 0 permits filed
1 permit since 2000: 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 24, 2014 | Never finaled issued Jun 2014, no final | 847 Haight St | on the rear building of the lot, all 4 sides of bldg., total wall area 800 sq. ft., remove & repalce exterior composite siding of hobby workshop structure, rear structure not visable from street, replace with cement fiber siding & denshield underplayment backer board, 5/8" densglass sheathing,Details
on the rear building of the lot, all 4 sides of bldg., total wall area 800 sq. ft., remove & repalce exterior composite siding of hobby workshop structure, rear structure not visable from street, replace with cement fiber siding & denshield underplayment backer board, 5/8" densglass sheathing, | $9,500 |