Surface Tec
- Based in
- Atherton
- On San Francisco permits
- Aug 2022 to Apr 2024
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 11, 2024 | Completed final sign-off Jun 2024 | 746 10th Av | remove thet top 5 terrazzo steps top landing and mid landing. install new 3/4 plywood sustitute to landings. install 5 new terrazzo steps and landings to match existing less than 50% in kind.Details
remove thet top 5 terrazzo steps top landing and mid landing. install new 3/4 plywood sustitute to landings. install 5 new terrazzo steps and landings to match existing less than 50% in kind. | $16,734 |
| Aug 25, 2022 | Completed final sign-off Oct 2022 | 243 Holyoke St | remove stucco around the stairs and laudry . add waterproofing membrane to existing steps in front of house refinish , clean and seal existing steps. remove and replace rotted deteriorated wood. install new laath and plaster to match existingDetails
remove stucco around the stairs and laudry . add waterproofing membrane to existing steps in front of house refinish , clean and seal existing steps. remove and replace rotted deteriorated wood. install new laath and plaster to match existing | $8,860 |