Permit GraphShortlistSan Francisco building permits since 2000

Sunwater Solar

Contractor license
869248
State license record
Based in
Richmond
On San Francisco permits
Apr 2013 to Oct 2013
Last 24 months
0 permits filed

2 permits since 2000: 1 completed, 1 never finaled.

Of the 1 never-finaled permit, 1 is over 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Most recent permits

All
FiledOutcomeAddressWork described on the permitDeclared cost
Oct 29, 2013Completed
final sign-off Feb 2014
1590 Broadwayconstruction of solar thermal collector rack. rack is composel of cold rolled galvanized steel joist( rack is level). manufacture's rack on top of rack will provide tilt for collectors. rack will be elevated with no point lower than 6'5" to provide access under collectors. work to be performed
Details
Permit
201310290541
Status
complete
Filed
Oct 29, 2013
Permit issued
Oct 31, 2013
Final sign-off
Feb 27, 2014
Declared cost
$10,000
Address
1590 Broadway

construction of solar thermal collector rack. rack is composel of cold rolled galvanized steel joist( rack is level). manufacture's rack on top of rack will provide tilt for collectors. rack will be elevated with no point lower than 6'5" to provide access under collectors. work to be performed

Open the permit page

$10,000
Apr 17, 2013Never finaled
issued Apr 2013, no final
1825 Mission Stmetal platform on 3rd story roofl. platform to span to structural elements of bldg. construction of metal platform on the 3rd fl roof to support solar hot water storage tank.
Details
Permit
201304174803
Status
issued
Filed
Apr 17, 2013
Permit issued
Apr 19, 2013
Declared cost
$6,500
Address
1825 Mission St

metal platform on 3rd story roofl. platform to span to structural elements of bldg. construction of metal platform on the 3rd fl roof to support solar hot water storage tank.

Open the permit page

$6,500