Sunviva Construction
- Based in
- Palo Alto
- On San Francisco permits
- Oct 2006 to Oct 2006
- Last 24 months
- 0 permits filed
1 permit since 2000: 1 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 16, 2006 | Completed final sign-off Apr 2007 | 35 Hancock St | replace tile and glass door in shower door to be temp. and swing out and new vales trim and shower head. replace vanity top sink and faucet. install a steam shower in ext shower stall. 1 bathroom remodel. no new walls. all new lighting to meet title 24 requirementDetails
replace tile and glass door in shower door to be temp. and swing out and new vales trim and shower head. replace vanity top sink and faucet. install a steam shower in ext shower stall. 1 bathroom remodel. no new walls. all new lighting to meet title 24 requirement | $15,000 |