Sunset Home Builders Inc
- Based in
- Sherman Oaks
- On San Francisco permits
- Jan 2024 to Mar 2025
- Last 24 months
- 1 permit filed
10 permits since 2000: 10 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 17, 2025 | Completed final sign-off Sep 2025 | 538 Paris St | remodel 1 kitchen inkind, remodel 1 bathroom inkind. replace furnace, install new dry wall & insulation at 2nd story exterior walls. install new floor, rewire house & install 200 amp main meter & new sub panel. remodel in kind.Details
remodel 1 kitchen inkind, remodel 1 bathroom inkind. replace furnace, install new dry wall & insulation at 2nd story exterior walls. install new floor, rewire house & install 200 amp main meter & new sub panel. remodel in kind. | $114,000 |
| Aug 29, 2024 | Completed final sign-off Dec 2024 | 1132 Masonic Av | addition of (n) bathroom located at upper floorDetails
addition of (n) bathroom located at upper floor | $20,000 |
| May 22, 2024 | Completed final sign-off Sep 2024 | 770 Rhode Island St | remodel (1) primary bathroom like for like. run plumbing up to code for toilet, double sink and walking shower. run new 4 recessed lights, and new 2 gfci up to code.Details
remodel (1) primary bathroom like for like. run plumbing up to code for toilet, double sink and walking shower. run new 4 recessed lights, and new 2 gfci up to code. | $37,000 |
| Apr 18, 2024 | Completed final sign-off Feb 2025 | 111 Escolta Wy | remodel bath, add closet on main fl. add an office, a full bath & laundry on lower fl (298 sf). replace window & door at rear. replace water heater. update plumbing & electric systemDetails
remodel bath, add closet on main fl. add an office, a full bath & laundry on lower fl (298 sf). replace window & door at rear. replace water heater. update plumbing & electric system | $100,000 |
| Apr 4, 2024 | Completed final sign-off Sep 2024 | 1885 Jackson St | bathroom remodel in kind: upgrade outlet for vanity, add 2 recessed lights, replace exhaust fan; same location and vent pipe, upgrade switches, replace toilet, new plumbing for single vanity, new shower pan.Details
bathroom remodel in kind: upgrade outlet for vanity, add 2 recessed lights, replace exhaust fan; same location and vent pipe, upgrade switches, replace toilet, new plumbing for single vanity, new shower pan. | $15,000 |
| Mar 22, 2024 | Completed final sign-off Apr 2024 | 318 Spear St | bathroom remodel: changing plumbing vanity, toilet, anda tub. change vanity from one sink to two sinks, adding 2 gfci outlets- 1 for vanity and 1 for toilet.no new wall and no existing wall relocation. new lighting shall comply with cec 150.0 (k)5.Details
bathroom remodel: changing plumbing vanity, toilet, anda tub. change vanity from one sink to two sinks, adding 2 gfci outlets- 1 for vanity and 1 for toilet.no new wall and no existing wall relocation. new lighting shall comply with cec 150.0 (k)5. | $26,180 |
| Feb 26, 2024 | Completed final sign-off Apr 2024 | 1885 Jackson St | bathroom remodel: like for like: new plumbing up to code for tub: new sink vanity and toilet: upgarde electrical for new exhaust fan: replace existing outlet with new gfci outlet and 3 recess lights. 10'x5'=50Details
bathroom remodel: like for like: new plumbing up to code for tub: new sink vanity and toilet: upgarde electrical for new exhaust fan: replace existing outlet with new gfci outlet and 3 recess lights. 10'x5'=50 | $19,700 |
| Jan 18, 2024 | Completed final sign-off Jul 2024 | 720 Masonic Av | emergency demo order 111151-e, to comply with nov202316964.Details
emergency demo order 111151-e, to comply with nov202316964. | $20,000 |
| Jan 18, 2024 | Completed final sign-off Jul 2024 | 722 Masonic Av | emergency demo order 111152-e, to comply with nov202316964.Details
emergency demo order 111152-e, to comply with nov202316964. | $20,000 |
| Jan 17, 2024 | Completed final sign-off Apr 2024 | 111 Escolta Wy | update full (1) bath 2nd fl new installation, drywall, fixtures, electric, plumbing, vanity. full remodelDetails
update full (1) bath 2nd fl new installation, drywall, fixtures, electric, plumbing, vanity. full remodel | $41,500 |