Sunlit Systems
- Based in
- Pleasanton
- On San Francisco permits
- Sep 2003 to May 2004
- Last 24 months
- 0 permits filed
7 permits since 2000: 7 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 11, 2004 | Completed final sign-off Jun 2004 | 60 Brussels St | install photovoltaic system on roof and connect to inverter and main panelDetails
install photovoltaic system on roof and connect to inverter and main panel | $13,959 |
| Nov 25, 2003 | Completed final sign-off Mar 2004 | 689 Mangels Av | install photovoltaic panels on roof and connect system to meterDetails
install photovoltaic panels on roof and connect system to meter | $19,922 |
| Nov 25, 2003 | Completed final sign-off Dec 2003 | 67 Topaz Wy | install photovoltaic panels on roof and connect system to main breaker panel for 67 topaz way onlyDetails
install photovoltaic panels on roof and connect system to main breaker panel for 67 topaz way only | $8,512 |
| Oct 22, 2003 | Completed final sign-off Nov 2003 | 508 Belvedere St | installation of solar photovoltaic panelsDetails
installation of solar photovoltaic panels | $12,000 |
| Oct 22, 2003 | Completed final sign-off Nov 2003 | 666 Mangels Av | installation of solar photovoltaic panelsDetails
installation of solar photovoltaic panels | $3,000 |
| Sep 19, 2003 | Completed final sign-off Nov 2003 | 875 Clayton St | insallation of photoolticDetails
insallation of photooltic | $4,800 |
| Sep 9, 2003 | Completed final sign-off Nov 2003 | 1402 Noe St | install pv solar panels(12 panels) on the roof and connect to pg&e gridDetails
install pv solar panels(12 panels) on the roof and connect to pg&e grid | $9,553 |