Sunlift Remodeling
- Based in
- San Francisco
- On San Francisco permits
- Jun 2018 to Dec 2018
- Last 24 months
- 0 permits filed
12 permits since 2000: 5 completed, 5 never finaled, 2 expired or cancelled.
Of the 5 never-finaled permits, 5 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 19, 2018 | Completed final sign-off Mar 2019 | 522 Mangels Av | revision to #201811145881. add 4 sun tubs in kitchen, hold back from property line min 3'-0". all work is non-structural - no framing changes.Details
revision to #201811145881. add 4 sun tubs in kitchen, hold back from property line min 3'-0". all work is non-structural - no framing changes. | $8,000 |
| Dec 5, 2018 | Expired or cancelled cancelled Dec 2018 | 3655 Folsom St | bathroom remodel - replacing tile, cabinets, fixtures, shower panDetails
bathroom remodel - replacing tile, cabinets, fixtures, shower pan | $2,000 |
| Nov 14, 2018 | Completed final sign-off Mar 2019 | 522 Mangels Av | kitchen remodel, like for like. install sink, update plumbing, all electrical outlets, install (4) recessed lights. bathroom remodel, like for like. install new sinkm toilet and new tub, (4) gfc, (3) canned lights , (1) xf.Details
kitchen remodel, like for like. install sink, update plumbing, all electrical outlets, install (4) recessed lights. bathroom remodel, like for like. install new sinkm toilet and new tub, (4) gfc, (3) canned lights , (1) xf. | |
| Nov 5, 2018 | Never finaled issued Nov 2018, no final | 569 Waller St | install electric tiles warmer and gfci in master bathroom areaDetails
install electric tiles warmer and gfci in master bathroom area | $2,900 |
| Oct 12, 2018 | Never finaled issued Oct 2018, no final | 569 Waller St | bathroom remodel - add heated floor, new sink, new switches, 1 gfciDetails
bathroom remodel - add heated floor, new sink, new switches, 1 gfci | $10,000 |
| Oct 2, 2018 | Never finaled issued Oct 2018, no final | 918 Corbett Av | bathroom remodel like for like. 2 gfci, 2 recessed "he" lights. new tub, new sink, new toilet, update main switches, update exhaust fans. connect to existing vent.Details
bathroom remodel like for like. 2 gfci, 2 recessed "he" lights. new tub, new sink, new toilet, update main switches, update exhaust fans. connect to existing vent. | $17,500 |
| Aug 17, 2018 | Expired or cancelled expired Jun 2023 | 1 Valdez Av | add a family foom, a bedroom, and a full bath on 1st floorDetails
add a family foom, a bedroom, and a full bath on 1st floor | $38,000 |
| Aug 6, 2018 | Completed final sign-off Jan 2019 | 472 Dewey Bl | remodel kitchen and bathroom in kind. kitchen demo cabinets, sinks, flooring, install new cabinets and recessed lighting. all dedicaded appliances to be ggfi. remove tub, vanity and toilet, replace in kind.Details
remodel kitchen and bathroom in kind. kitchen demo cabinets, sinks, flooring, install new cabinets and recessed lighting. all dedicaded appliances to be ggfi. remove tub, vanity and toilet, replace in kind. | $20,000 |
| Aug 6, 2018 | Completed final sign-off Dec 2018 | 1380 Greenwich St | remodel bathroom in kind. demo sink, vanity, tub and flooring. replace wiht new sink, vanity, tub and flooring.Details
remodel bathroom in kind. demo sink, vanity, tub and flooring. replace wiht new sink, vanity, tub and flooring. | $8,000 |
| Aug 6, 2018 | Never finaled issued Aug 2018, no final | 5070 Diamond Heights Bl | remodel bathroom in kind. demo: shower pan, vanity and toilet. replace with new shower pan, vanity, and toilets.Details
remodel bathroom in kind. demo: shower pan, vanity and toilet. replace with new shower pan, vanity, and toilets. | $8,000 |
| Jul 9, 2018 | Never finaled issued Jul 2018, no final | 53 Glenview Dr | bathroom remodel like for like, install all rough plumbing, install new drain, install new sink, install/update 2 gfci, install/update canned lights.Details
bathroom remodel like for like, install all rough plumbing, install new drain, install new sink, install/update 2 gfci, install/update canned lights. | $8,000 |
| Jun 1, 2018 | Completed final sign-off Oct 2018 | 135 Faith St | remodel like for like bathroom: install new toilet, vanity, tub. same place. 2 canned lights, 1 gfci , in kitchen: install new cabinets, countertop, sink, faucet, 6 gfci, 7 canned lights, all like for like same place. no moving of walls or doors.Details
remodel like for like bathroom: install new toilet, vanity, tub. same place. 2 canned lights, 1 gfci , in kitchen: install new cabinets, countertop, sink, faucet, 6 gfci, 7 canned lights, all like for like same place. no moving of walls or doors. | $20,000 |