Summit Comm Inc
- Based in
- Lincoln
- On San Francisco permits
- Aug 2013 to Mar 2024
- Last 24 months
- 0 permits filed
5 permits since 2000: 5 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 26, 2024 | Completed final sign-off Apr 2026 | 1400 Van Ness Av | at&t: install new mobility unmanned telecom facility: (12) antennas within (3) faux frp radomes, 3 frp enclosures, 12 rrus, gps (1), (4) surge suppressors, power trunk/fiber/conduit, new steel platform pad on rooftop for equipment, (4) cabinets, new h-frame with ciena hoffman box, 200ac power panel,Details
at&t: install new mobility unmanned telecom facility: (12) antennas within (3) faux frp radomes, 3 frp enclosures, 12 rrus, gps (1), (4) surge suppressors, power trunk/fiber/conduit, new steel platform pad on rooftop for equipment, (4) cabinets, new h-frame with ciena hoffman box, 200ac power panel, | $195,000 |
| Aug 29, 2023 | Completed final sign-off Aug 2024 | 3698 California St | att cell equiptment demo on roof top. after we complete the demo on the roof top,another contractor is performing a demo on the entire building.Details
att cell equiptment demo on roof top. after we complete the demo on the roof top,another contractor is performing a demo on the entire building. | $20,000 |
| Dec 14, 2021 | Completed final sign-off Feb 2023 | 10 29th St | revision to pa# 202003116711. adding future 5th sector within frp enclosure on roof top, consisting of (3) panel antennas, (5) rrh's and (1) surge suppression.Details
revision to pa# 202003116711. adding future 5th sector within frp enclosure on roof top, consisting of (3) panel antennas, (5) rrh's and (1) surge suppression. | $15,000 |
| Jun 9, 2015 | Completed final sign-off Jul 2016 | 1580 Valencia St | modification to (e) wireless facility for verizon wireless: pcs upgrade: replace 6 antennas, add 6 rrus, replace 3 rrus, replace 3 raycaps, add 1 raycap, add 1 cableDetails
modification to (e) wireless facility for verizon wireless: pcs upgrade: replace 6 antennas, add 6 rrus, replace 3 rrus, replace 3 raycaps, add 1 raycap, add 1 cable | $15,000 |
| Aug 9, 2013 | Completed final sign-off Jul 2016 | 1580 Valencia St | roof - replace 3(e)lte antennas w/ 3 (n) verizon wireless dual band 700/aws antennas,mounted to(e)bldg; 3 (n) rrusr; 16 (n) raycap surge protectors; 3 (n) hybrid cable; 3 (n) hybrid jumpers.1 (n) ret homerun cable. add (2) 4" 0 cable entry parts.Details
roof - replace 3(e)lte antennas w/ 3 (n) verizon wireless dual band 700/aws antennas,mounted to(e)bldg; 3 (n) rrusr; 16 (n) raycap surge protectors; 3 (n) hybrid cable; 3 (n) hybrid jumpers.1 (n) ret homerun cable. add (2) 4" 0 cable entry parts. | $40,000 |